CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Bromley
Plans Sub-Committee No. 3, Thursday 24 January 2013 at 7.00pm

(12/03297/FULL6) - 90 Spur Road, Orpington

Decided Committee 1 paper

Plans Sub-Committee No. 3 decided this item on Thursday 24 January 2013. Below is the council's own wording, with the papers it was decided on.

Item24.14

Resolved

PERMISSION
Word for word from the decision Bromley published for this meeting. Source: cds.bromley.gov.uk

Follow this further

Built from Bromley's papers

What the report saysPro

Report to Plans Sub-Committee No. 3

Section ‘3’ - Applications recommended for PERMISSION, APPROVAL or CONSENT

Application No : 12/03297/FULL6 Ward: Orpington

Address : 90 Spur Road Orpington BR6 0QN

OS Grid Ref: E: 546599 N: 165758

Applicant : [name removed] : YES

Description of Development:

Single storey front/side/rear extension

Key designations:

Biggin Hill Safeguarding Birds Biggin Hill Safeguarding Area Local Cycle Network London City Airport Safeguarding Stat Routes

Proposal

The proposal relates to a single storey front, side and rear extension.

Location

Site relates to a two storey semi-detached property located on the south side of Spur Road. The properties are well set back from the highway and the area is characterised by semi detached dwellings of similar design and size.

Comments from Local Residents

Nearby owners/occupiers were notified of the application and representations were received which can be summarised as follows:

• design not in keeping with surrounding area • detrimental outlook from No.88 • partly constructed work appears to have built on Party Wall, is poorly constructed and doesn’t use bricks to match.

Comments from Consultees

None. Planning Considerations

The application falls to be determined in accordance with the following policies of the Unitary Development Plan and the London Plan:

BE1 Design of New Development H8 Residential Extensions

Planning History

No relevant planning history.

Conclusions

The main issues relating to the application are the effect that it would have on the character of the area and the impact that it would have on the amenities of the occupants of surrounding residential properties.

The front porch, side garage and rear conservatory would be demolished and replaced with a larger porch and wrap around side and rear extension. The porch is considered acceptable given it would not project further forward than the existing porch. The side extension would be set in 0.6m from the boundary before being built right up to the boundary towards the rear to allow for a side access. The hipped roof would be 4m high and 2.7m to the eaves. It would extend 3m from the original rear wall.

With regards to amenity, No.88 to the west would be presented with increased bulk and mass. However, this property benefits from a garage along the boundary which would be largely unaffected. A parapet wall up to the boundary is not considered to cause undue loss of outlook and light given its depth and height. Similarly, the rear wall built up to the boundary with the adjoining semi is considered acceptable given the depth and orientation of the properties.

Concerns have been raised over the construction of the structure which has been partly built. It should be noted that the scheme, if permitted, would need to be built strictly in accordance with the approved plans. In addition, the construction issues, including drainage, foundations and general structural integrity of the build would be dealt with through the building control process. Concern over the use of materials can be addressed by an attached condition.

Having had regard to the above it was considered that the siting, size and design of the proposed extension is acceptable in that it would not result in a significant loss of amenity to local residents nor impact detrimentally on the character of the area.

Background papers referred to during production of this report comprise all correspondence on file ref. 12/03297, excluding exempt information.

RECOMMENDATION: PERMISSION Subject to the following conditions:

1 ACA01 Commencement of development within 3 yrs ACA01R A01 Reason 3 years 2 ACC04 Matching materials ACC04R Reason C04 3 AJ01B Justification GENERIC reason FULL6 apps Application:12/03297/FULL6 Address: 90 Spur Road Orpington BR6 0QN

Proposal: Single storey front/side/rear extension

D ROAD BEDFOR 87 56

60 97 68 97a

31 99 103

45 104

61 69.5m

68 97 70

SPU R RO AD

65 118

72 75

93 97

86 LB 107 90 FE LS TE A D RO A D 115

El Sub Sta

1:1,520 77

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
(12/03297/FULL6): 90 Spur Road, OrpingtonReport 170 KB DownloadRead as text

At this meeting

Whole meeting
21APOLOGIES FOR ABSENCE AND NOTIFICATION OF SUBSTITUTE MEMBERSDecided 22DECLARATIONS OF INTERESTDecided 23CONFIRMATION OF MINUTES OF MEETING HELD ON 22 NOVEMBER 2012Decided 24.1(12/00776/OUT) - Grays Farm Production Village, Grays Farm Road, OrpingtonAgreed 24.2(12/01647/FULL6) - 46 Kings Avenue, BromleyRefused 24.3(12/02474/FULL1) - 20 Southend Road, BeckenhamDecided 24.4(12/03200/FULL1) - 11 The Avenue, BeckenhamRefused 24.5(12/03231/FULL6) - 49 Clarendon Way, ChislehurstRefused 24.6(12/03279/FULL6) - 3 Camden Park Road, ChislehurstRefused 24.7(12/03813/CONDIT) - 94 Bromley Road, BeckenhamDeferred 24.8(12/03815/FULL1) - Terrance House, 151 Hastings Road, BromleyDecided 24.9(12/03927/TELCOM) - Terrance House, 151 Hastings Road, BromleyApproved 24.10(12/03036/FULL1) - Plaistow Lane Service Station, 1 Plaistow Lane, BromleyDecided 24.11(12/03144/FULL1) - Orpington Fire Station, 13 Avalon Road, OrpingtonDecided 24.12(12/03194/FULL1) - Orpington Fire Station, 13 Avalon Road, OrpingtonDecided 24.13(12/03203/FULL1) - 305 Main Road, Biggin HillRefused
24.14(12/03297/FULL6) - 90 Spur Road, OrpingtonThis decision
24.15(12/03412/FULL6) - 9 Warren Drive, OrpingtonDecided 24.16(12/03448/FULL1) - Keston Methodist Church, Croydon Road, KestonDecided 24.17(12/03640/PLUD) - Summercroft Surgery, Starts Hill Road, OrpingtonRefused 24.18(12/03868/FULL6) - 1A Alma Road, OrpingtonDeferred 24.19(12/03911/FULL6) - 8 Haig Road, Biggin HillDeferred 24.20(12/03276/FULL6) - 3 Camden Park Road, ChislehurstRefused 26.1Objections to Tree Preservation Order 2500 at 10 Meadow Way, Orpington.Decided 26.2Objections to Tree Preservation Order 2501at 8 Meadow Way, OrpingtonDecided

On this subject at Bromley

Search all
  1. (12/03297/FULL6) - 90 Spur Road, OrpingtonThis decision
  2. (15/04577/FULL6) - 154 Spur Road, Orpington, BR6 0QWDecided

More from Bromley Plans Sub-Committee No. 3

All decisions
MeetingDecisionOutcome
22 Feb 2024 Apologies for absence and notification of substitute membersNone received Decided Open
22 Feb 2024 Declarations of interestNone received Decided Open
22 Feb 2024 Confirmation of minutes of meeting held on 21st december 2023Confirmed Decided Open
22 Feb 2024 (22/04947/ELUD) - 243 Court Road, Orpington, BR6 9BYREFUSED Kelsey & Eden Park Refused Open
22 Feb 2024 (23/04018/ADV) - Bandstand, Croydon Road Recreation Ground, Beckenham, BR3 3PRADVERTISEMENT CONSENT GRANTED West Wickham Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies