(13/03376/FULL2) - Enso House, New Mill Road, Orpington

Decided Committee 1 paper

Plans Sub-Committee No. 4 decided this item on Thursday 23 January 2014. Below is the council's own wording, with the papers it was decided on.

Item27.1

Resolved

PERMISSION
Word for word from the decision Bromley published for this meeting. Source: cds.bromley.gov.uk

Follow this further

Built from Bromley's papers

What the report saysPro

Report to Plans Sub-Committee No. 4

SECTION ‘2’ – Applications meriting special consideration

Application No : 13/03376/FULL2 Ward: Cray Valley West

Address : Enso House 3 New Mill Road Orpington BR5 3TW

OS Grid Ref: E: 547322 N: 169662

Applicant : Lyca Health (Kent) Limited Objections : NO

Description of Development:

Change of use of 927sqm of ground floor from offices (use Class B1) to health diagnostic centre (use Class D1) and new entrance to building

Key designations:

Areas of Archeological Significance Biggin Hill Safeguarding Birds Biggin Hill Safeguarding Area Flood Zone 2 Flood Zone 3 Gas HP Pipelines Gas HP Zones Gas HP Zones: Gas Pipelines London City Airport Safeguarding London City Airport Safeguarding Birds

Proposal

It is proposed to use part of the ground floor of this vacant two storey office building as a health diagnostic imaging centre which would fall within Use Class D1. The use would include x-ray, ultrasound, MRI and CT scanners, consulting rooms and a physiotherapy gym for treatment. It would operate between 7am-10pm Mondays to Fridays, and between 8am-6pm at weekends which would include ancillary activities such as cleaning and maintenance which would take place outside the core operating hours.

Patients would attend for prior appointments only (no "walk-in" services are provided), and a maximum of 60 patients would be seen on weekdays, with up to 8 present at any one time. There would be a maximum of 9 staff on duty, with up to 3 visiting consultants on site at any one time. A total of 27 full-time (or equivalent) jobs would be created as a result of the proposals. The building as a whole has a total of 120 car parking spaces located to the front of the site, and 36 of these spaces would be allocated to the proposed diagnostic imaging centre. A new entrance to the building would be created as part of the current proposals along with an area of cycle parking, which would necessitate the loss of 2 of the allocated car parking spaces. The existing entrance would be retained in order to access the remainder of the building.

The application is accompanied by the following documents:

 Marketing Report  Transport Statement  Flood Risk Assessment  Design and Access Statement.

Location

This site forms part of the Crayfields Business Park and falls within St Mary Cray Business Area as designated by the Unitary Development Plan. This is the largest of the Borough's Business Areas with 40 hectares used for light industry or warehousing, and has the best connections to the M25. It is, therefore, the Borough's prime location for such businesses.

The site is also located in a Strategic Industrial Location (SIL) within the London Plan, and is defined as an Industrial Business Park (IBP) within this context.

The building has been vacant since October 2010, but was previously used for Class B1 offices.

Consultations

No third party representations have been received to the proposals.

Comments from Consultees

With regard to highways issues, the site is located within a very low PTAL area (1b), but the number of car parking spaces allocated for the proposed use is considered acceptable, whilst the likely trip generation associated with the proposed use is not considered to have a significant impact on the highway network. It is considered necessary, however, to restrict the uses to those proposed as any additional facilities (such as a dialysis centre) may have an additional impact on the road network.

No objections are raised by the Environment Agency with regard to flood risk, and Thames Water have not raised any concerns with the proposals.

Planning Considerations

The application falls to be determined in accordance with the following policies of the Unitary Development Plan EMP4 Business Areas C1 Community Facilities C4 Health Facilities T3 Parking

In addition, the following documents are also relevant to this case:

The London Plan (2011) NPPF

Planning History

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
(13/03376/FULL2): Enso House, New Mill Road, OrpingtonReport 488 KB DownloadRead as text

At this meeting

Whole meeting

More from Bromley Plans Sub-Committee No. 4

All decisions
MeetingDecisionOutcome
9 Nov 2023 Apologies for absence and notification of substitute membersNone Decided Open
9 Nov 2023 Declarations of interestVisiting Member Councillor Stammers declared she was a neighbour of the speaker in support of item 4.2. Decided Open
9 Nov 2023 Confirmation of minutes of meeting held on 14th september 2023Confirmed Decided Open
9 Nov 2023 (22/03824/FULL1) - 15 Madeline Road, Penge, London, SE20 8AYPERMISSION Decided Open
9 Nov 2023 (23/02527/FULL1) - Pavilion and Public Conveniences, Goddington Park, Goddington Lane, Orpington, BR6 9DHPERMISSION Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies