Resolved
PERMISSION SUBJECT TO A SECTION 106 AGREEMENT
Plans Sub-Committee No. 1 agreed this item on Thursday 22 January 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
PERMISSION SUBJECT TO A SECTION 106 AGREEMENT
SECTION ‘2’ – Applications meriting special consideration
Application No : 14/03324/FULL1 Ward: West Wickham
Address : Summit House Glebe Way West Wickham BR4 0RJ
OS Grid Ref: E: 538368 N: 165910
Applicant : Crest Nicholson (Eastern) & Lidl UK Objections : YES GmbH
Description of Development:
Demolition of existing buildings and redevelopment to provide a four storey building comprising 1,623sqm Class A1 (retail) use at ground floor and 54 residential units at first, second and third floor (8x1 bedroom, 43x2 bedroom and 3x3 bedroom) with associated car parking, landscaping and infrastructure
Key designations:
Biggin Hill Safeguarding Birds Biggin Hill Safeguarding Area Local Cycle Network London City Airport Safeguarding Open Space Deficiency Primary Shopping Frontage Secondary Shopping Frontage Stat Routes
Proposal
Permission is sought for the demolition of the existing three storey mixed use building and the erection of a part one, part two, part four storey mixed use building comprising:
1,623sqm Class A1 (retail) use at ground floor 54 residential units 125 car parking spaces with 70 cycle spaces landscaping to the rear of the site consisting of planting to the podium level and a south (rear) facing green wall
Appearance and scale Four storey building to a maximum height of 15.6m with two storey eastern element (entrance core 2) and a single storey western element (entrance core 1) Total width of 116.5m Podium parking area to rear to a height of 6.5m Southern section features under croft parking area with access to retail unit and access to ramp at rear Projecting balconies to each apartment, floor level terraces for first floor units onto car park (units 1-9) Residential use commences from 1st floor Front exterior treatment separated into two areas: the eastern section features brick and render with powder coated steel balconies; the western section features trespa panels (sun yellow) with similar balcony treatments The elevational treatments to the rear are repeated, with the eastern ground floor section featuring a green wall for the entirety of the ground floor rear elevation The eastern end section, entrance core 1, is finished in brick Planting and trees are provided to the podium deck Balconies to the eastern section are angled inwards with slated screening to one side, to the western section traditional box balconies are featured with obscure glazed screening Ground floor front elevation features a mixture of full height and high level windows with textured brickwork and glazed access doors Photo-voltaic cells to the roof
Site layout
Ground floor retail unit accessed from under croft Residential elements split into two cores accessed from eastern and western front elevation entrances Vehicular ramp and stairwell to rear provide access to podium area Refuse storage located at podium level within three stores Cycle storage for residents provided within each core (26 and 28 respectively), visitors spaces set to the western boundary (two sections for 6 and 10 cycles) 75 car parking spaces at ground floor level, 4 of which are disabled spaces to Glebe Way and 3 are family spaces to entrance of retail unit 50 residents parking spaces at first floor podium level to rear 5 of which are disabled spaces. 4 spaces to the service road will made available to residents out of retail opening hours
Mix of uses
A total of 54 residential flats comprising at first, second and third floor (8x1 bedroom, 43x2 bedroom and 3x3 bedroom). None are affordable. All residential units will be built to the 'Lifetime Homes' standard and 10% wheelchair accessible A single Class A1 retail unit of 1,623sqm The site has an area of 0.5ha giving a residential density of 108 dwellings per hectare, or 314 habitable rooms per hectare.
Applicant's Submission in Support
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
(14/03324/FULL1): Summit House, Glebe Way, West Wickham.Report | 722 KB | DownloadRead as text |
Follow Plans Sub-Committee No. 1 at Bromley and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 13 Aug 2026 | Apologies for absence and notification of substitute membersApologies were received from Councillor Kevin Kennedy Brooks and Councillor Ryan Thompson attended as substitute. Apo... | Decided | Open |
| 13 Aug 2026 | Declarations of interestCouncillor Ryan Thompson declared an interest as a member of Crystal Palace Community Trust and also as a member and ... | Decided | Open |
| 13 Aug 2026 | Confirmation of minutes of meeting held on 18th june 2026The minutes of the meeting held on the 18th of June 2026 were agreed as a correct record. | Agreed | Open |
| 13 Aug 2026 | (26/00815/NOT) - 15 Wickham Road, Beckenham. BR3 5JSPERMISSION GRANTED | Decided | Open |
| 13 Aug 2026 | (26/01021/RES) - Crystal Palace Park, Thicket Road, Penge, London, SE20 8DTAPPROVED | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.