CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Bromley
Plans Sub-Committee No. 3, Thursday 19 February 2015 at 7.00pm

(14/04473/FULL1) - St Christopher's School, 49 Bromley Road, Beckenham

Decided Committee 1 paper

Plans Sub-Committee No. 3 decided this item on Thursday 19 February 2015. Below is the council's own wording, with the papers it was decided on.

Item27.7

Resolved

PERMISSION
Word for word from the decision Bromley published for this meeting. Source: cds.bromley.gov.uk

Follow this further

Built from Bromley's papers

What the report saysPro

Report to Plans Sub-Committee No. 3

SECTION ‘2’ – Applications meriting special consideration

Application No : 14/04473/FULL1 Ward: Copers Cope

Address : St Christophers School 49 Bromley Road Beckenham BR3 5PA

OS Grid Ref: E: 538284 N: 169385

Applicant : [name removed] : YES

Description of Development:

Demolition of existing single storey classrooms and construction of a two storey extension building comprising eight classrooms.

Key designations:

Biggin Hill Safeguarding Birds Biggin Hill Safeguarding Area London City Airport Safeguarding London City Airport Safeguarding Birds London Distributor Roads Open Space Deficiency Urban Open Space

Proposal

Planning permission is sought for the demolition of existing single storey classrooms and construction of a two storey extension building comprising eight classrooms.

The proposal will not involve the expansion of the school which will remain a two form entry school for 3 to 11 year olds. In summary this will involve the demolition of the existing six single storey classrooms and replacement with a building to incorporate eight classroom's. The additional two classrooms are provided to replace two classrooms in the old main building.

The new building provides four classrooms at ground floor as well as four classrooms at first floor, each with their own cloakrooms and WC facilities at first floor. An additional flexible space at ground floor is shown which could be used as a group room, office, music practice room, or similar. The central spine corridor is double storey in height, and is lit by clerestory glazing at the upper level. The circulation space at first floor level overlooks the corridor. Cloakroom spaces at first floor are situated adjacent to the circulation corridor, with the classrooms beyond these. The elevations are indicated to be similar to the recently constructed Reception block, being largely glazed at ground floor, with a window seat and clerestory glazing arrangement at first floor. Classrooms at ground floor have direct access to the playing fields, and most have sheltered areas overlooking the playing fields protected by an overhang at first floor. The new building is physically separated from the Music and Drama Block by recessed glazing.

External spaces will also be upgraded to reflect their importance within the overall masterplan for the site. The space to the north of the buildings forming the main external link between the east and west playgrounds, will be upgraded to match the work undertaken in association with the completion of the Reception block, with a landscaped granite paved walkway linking the east and west portions of the site. Similarly, the new edge to the eastern playground will be linked to this pathway to define the western edge of the playing fields.

Materials are indicated as an insulated render system resistant to dirt and staining with a self-cleaning effect when rained on.

The glazed facades will comprise thermally broken aluminium framed, insulated (double glazed) units. Large screens, will be constructed in a curtain wall system. Smaller openings will be created in a 'flush' glazing system with minimal sightlines to maximise the transparency of the units.

No additional parking is proposed.

Location

St Christopher's School is located on the north side of Bromley Road. The surrounding area is mainly residential in character with sports pitches/playing fields located to the east of the site.

The buildings on site vary in age, character and condition, the oldest being the main building, completed around 1750, this building is also Grade II listed. Newer buildings include the Music and Drama Block, completed in 2006 immediately south and adjacent to the corrugated classrooms to be demolished, and the Reception Block, completed in 2010 to the north east. The buildings immediately surrounding the school site are a mixture of large Victorian houses and mid-20th century residential style properties.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
(14/04473/FULL1): St Christopher's School, 49 Bromley Road, BeckenhamReport 842 KB DownloadRead as text

At this meeting

Whole meeting

On this subject at Bromley

Search all
  1. (14/04473/FULL1) - St Christopher's School, 49 Bromley Road, BeckenhamThis decision
  2. (09/03532/FULL1) - Christophers School, 49 Bromley Road, Beckenham.Decided

More from Bromley Plans Sub-Committee No. 3

All decisions
MeetingDecisionOutcome
22 Feb 2024 Apologies for absence and notification of substitute membersNone received Decided Open
22 Feb 2024 Declarations of interestNone received Decided Open
22 Feb 2024 Confirmation of minutes of meeting held on 21st december 2023Confirmed Decided Open
22 Feb 2024 (22/04947/ELUD) - 243 Court Road, Orpington, BR6 9BYREFUSED Kelsey & Eden Park Refused Open
22 Feb 2024 (23/04018/ADV) - Bandstand, Croydon Road Recreation Ground, Beckenham, BR3 3PRADVERTISEMENT CONSENT GRANTED West Wickham Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies