CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Bromley
Plans Sub-Committee No. 3, Thursday 16 April 2015 at 7.00pm

(14/04856/FULL1) - Midfield Primary School, Grovelands Road, Orpington.

Decided Committee 2 papers

Plans Sub-Committee No. 3 decided this item on Thursday 16 April 2015. Below is the council's own wording, with the papers it was decided on.

Item31.1

Resolved

PERMISSION
Word for word from the decision Bromley published for this meeting. Source: cds.bromley.gov.uk

Follow this further

Built from Bromley's papers

What the report saysPro

Report to Plans Sub-Committee No. 3

SECTION ‘1’ – Applications submitted by the London Borough of Bromley

Application No : 14/04856/FULL1 Ward: Cray Valley West

Address : Midfield Primary School Grovelands Road Orpington BR5 3EG

OS Grid Ref: E: 546304 N: 170044

Applicant : [name removed] : NO

Description of Development:

Demolition of existing single storey section and construction of a single storey extension to provide 2 classrooms with associated landscaping and elevational alterations to existing building to facilitate 60 additional pupils.

Key designations:

Biggin Hill Safeguarding Birds Biggin Hill Safeguarding Area Biggin Hill Safeguarding Area Green Belt London City Airport Safeguarding London City Airport Safeguarding London City Airport Safeguarding Birds

Proposal

Planning permission is sought for the demolition of existing single storey section and the construction of a new single storey extension to provide 2 additional classrooms with associated landscaping and elevational alterations to existing building to facilitate an additional 60 pupils.

The application will enable the expansion of the school from a 1 form entry primary school with 3 bulge classes to a 2 form entry primary school. At present, the school has 305 registered, with a maximum capacity for 380 within the existing school building. The proposal seeks an additional 60 pupil which would result in a maximum capacity of 440 pupils. This would be achieved by September 2018 by allowing two form entry into the school.

The proposed extension will replace an existing single storey element at the site. The existing structure projects 5m from the rear of the building and will be replaced with a full width extension projecting 14m to the rear. The proposed extension would have a flat roof and measure a maximum of 4.3m in height. Location

The school is located to the northern side of Midfield Way, with the main entrance to the school via Groveland Road. There are residential properties to the south along Midfield Way and to the north east in Groveland Road, which also has a small parade of shops. Adjacent to the site to the east lies The Groveland Centre. The school is located within the Green Belt.

Comments from Local Residents

Nearby owners/occupiers were notified of the application no representations were received.

A letter of support has been received from Bromley Council's Director of Education, Care and Health Services.

Comments from Consultees

Highways- No objections raised in principle subject to recommended conditions.

Environmental Health- No objections raised.

Drainage/Thames Water- No objections in principle

Natural England- No objections raised.

Planning Considerations

The application falls to be determined in accordance with the following Unitary Development Plan policies:

BE1 Design of New Development G1 Green Belt C1 Community Facilities C7 Educational and Pre School Facilities T1 Transport Demand T2 Assessment of Transport Effects T3 Parking T6 Pedestrians T7 Cyclists T18 Road Safety

Bromley's Draft Local Plan: Policies and Designations Document has been subject to public consultation and is a material consideration (albeit it of limited weight at this stage). Of particular relevance to this application are policies:

6.5Education 6.6 Education Facilities 7.1 Parking 7.2 Relieving congestion 7.3 Access to services for all 8.14 Green Belt

The above policies are considered to be consistent with the principles and objectives of the London Plan and National Planning Policy Framework which is a key consideration in the determination of this application.

The Councils adopted SPG design guidance is also a consideration.

Planning History

The most recent planning history of the site is summarised as follows:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
(14/04856/FULL1): Midfield Primary School, Grovelands Road, Orpington.Report 108 KB DownloadRead as text
PDF
Midfield Primary SchoolReport 64 KB Download

At this meeting

Whole meeting

On this subject at Bromley

Search all
  1. (14/04856/FULL1) - Midfield Primary School, Grovelands Road, Orpington.This decision
  2. (11/03795/FULL1) - Link Youth Centre, Midfield Way, Orpington.Decided
  3. (10/03349/FULL1) - Field Studies Centre, Midfield Primary School, Grovelands Road, Orpington.Decided

More from Bromley Plans Sub-Committee No. 3

All decisions
MeetingDecisionOutcome
22 Feb 2024 Apologies for absence and notification of substitute membersNone received Decided Open
22 Feb 2024 Declarations of interestNone received Decided Open
22 Feb 2024 Confirmation of minutes of meeting held on 21st december 2023Confirmed Decided Open
22 Feb 2024 (22/04947/ELUD) - 243 Court Road, Orpington, BR6 9BYREFUSED Kelsey & Eden Park Refused Open
22 Feb 2024 (23/04018/ADV) - Bandstand, Croydon Road Recreation Ground, Beckenham, BR3 3PRADVERTISEMENT CONSENT GRANTED West Wickham Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies