KIMBERLEY DEPOT GARAGE DOORS AND FLOOD PREVENTION

Approved Finance 1 paper

Finance and Resources Committee approved this item on Thursday 8 July 2021. Below is the council's own wording, with the papers it was decided on.

Item8

Resolved

RESOLVED that the addition to the 2021/22 capital programme as set out above be approved.
Word for word from the decision Broxtowe published for this meeting. Source: democracy.broxtowe.gov.uk

Follow this further

Built from Broxtowe's papers

What the report saysPro

Report to Finance and Resources Committee

Finance and Resources Committee 8 July 2021

Report of the Deputy Chief Executive

KIMBERLEY DEPOT GARAGE DOORS AND FLOOD PREVENTION

1. Purpose of report To recommend that capital funding be allocated to replace the garage and store doors at Kimberley Depot, along with measures to help reduce the risk of flooding to the garage.

2. Background – garage doors The depot garage and stores areas were built circa 1970’s and are secured with five individual metal concertina manually-operated doors. Over the years the doors have worn to an extent that prevents them closing securely. They are also very difficult to manually operate due to the sheer size and condition therefore posing a manual handling risk. The doors currently give no protection to potential flood damage, and are also subject to a vast amount of heat loss due to the effort required in opening and closing them several times during the working day. They are illustrated in appendix 1.

The fitting of electrically operated roller shutter doors will assist in reducing the ergonomic effort required to operate them, will contain the residual heat more effectively so should reduce gas consumption and also assist with flood prevention due to their design. The estimated cost of new roller doors is £18,000 (£12,000 for the garages and £6,000 for the stores).

3. Background - flooding Details of the flooding issues over the years at Kimberley Depot are given in appendix 2. The current flood prevention plan involves the placing of sandbags to help prevent flows of water into the garages and stores. This is best achieved in daylight with multiple-operatives and plenty of warning. However, pluvial flooding can, of course, occur at short notice, in the dark and with limited operative availability.

It is therefore proposed to purchase some light-weight plastic flood barriers, sufficient to protect the garage, of which an example is illustrated in appendix 2. These are easily handled and assembled by one person, can be used multiple times and interlock to provide a better barrier than sandbags. The estimated cost is £7,000, including some levelling of tarmac / concrete aprons to ensure maximum continuity (hence minimum leakage) between the barriers and the surface they are placed on.

5. Financial implications The estimated cost of the replacement garage and store doors and measures to reduce flooding is £25,000 and this is likely to be funded by borrowing. Final capital financing will be determined at the end of the financial year.

Recommendation The Committee is asked to RESOLVE that the addition to the 2021/22 capital programme as set out above be approved. Background papers - Nil Finance and Resources Committee 8 July 2021

APPENDIX 1 Kimberley Depot garage doors Finance and Resources Committee 8 July 2021

APPENDIX 2 Flooding at Kimberley Depot

Flooding is the most common and widespread natural disaster in the UK and since 1998 there has been at least one serious flood in the UK every year.

At Kimberley Depot serious damage has been caused on 5 occasions since 2000 by localised pluvial flooding which is defined as surface water flooding which occurs when the local drainage system is overwhelmed

The geographical location of the Depot situated at a low elevation in the Kimberley area at the confluence of three steep roads; these being Nine Corners, High Street and Eastwood Road resulting in an increase in serious flooding events.

Flooding at the Depot arises when surface water run off enters the site from Eastwood Road causing damage to the Joinery and Transport workshops and the Stores facility. The table shows details of flood events since 2013 with costs of the repairing damage

Date Damage Repair Costs Jul-13 £47,338 Jun-14 £1,117 Aug-14 £920 Sep-20 £18,276 Total £67,651

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
KIMBERLEY DEPOT GARAGE DOORS AND FLOOD PREVENTIONReport 492 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

15 of 17 attended
GM
Councillor Greg MarshallChair, present
SJ
Councillor Stephen J CarrVice-Chair, apologies, sent representative
BC
Councillor Barbara C CarrCommittee Member, apologies, sent representative
EC
Councillor Edward CubleyCommittee Member, present
SE
Councillor Shane EasomCommittee Member, present
DG
Councillor David GrindellSubstitute, expected
TH
Councillor Tim HallamSubstitute, expected
EK
Councillor Eric KerryCommittee Member, present
PL
Councillor Patrick LallyCommittee Member, present
PJ
Councillor Philip J OwenCommittee Member, present
SP
Councillor Sue PatersonCommittee Member, apologies, sent representative
JC
Councillor Janet C PatrickCommittee Member, present as substitute

All 17 on the meeting page

More from Broxtowe Finance and Resources Committee

All decisions
MeetingDecisionOutcome
10 Feb 2022 Business plans and financial estimates 2022/23 - 2024/25RESOLVED that the Business Plans relating to the support service areas be approved. 2. RECOMMENDED to Council that th... Approved Open
10 Feb 2022 Budget proposals and associated strategiesRESOLVED to approve: 1. The business plans for the Council’s corporate priorities and support functions, subject to a... Approved Open
10 Feb 2022 Capital programme amendments 2021/22RESOLVED that the capital budget variations for 2021/22 as set out in the appendix be approved. Approved Open
10 Feb 2022 Grants to voluntary and community organisations, charitable bodies and individuals involved in sports, the arts and disability matters 2021/22RESOLVED that the Grant applications be dealt with as follows: New Stapleford Community Association £4,000 Stapleford... Decided Open
10 Feb 2022 Civic event-freeman/alderman of the boroughRESOLVED that the finances be provisionally approved subject to Council’s approval of the establishment of a special ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies