Resolved
Resolved (by 6 votes to 1) to accept the officer recommendation and approve planning permission subject to the completion of the section 106 agreement by 30 November 2010 and the conditions set out on the agenda. Following the receipt of advice from the County, the section 106 agreement areas to be addressed further are: (i) ECATP: The contribution figure the County requires is £120,454, (not the £158,010 in the report), which can be reduced to £64,454 if a car club contribution is still appropriate. (ii) The need for a Residential Travel Plan; (iii) The dedication of land as public highway to ensure that a minimum of a 2.4m wide footway is provided along the whole of the site street frontage; (iv) The funding of measures to prevent parking outside the proposed commercial unit (which could block the road and be dangerous for cyclists). This would probably be a pedestrian guard rail. (iv) In addition a monitoring fee is required by the section 106 agreement in accordance with the City Council’s Planning Obligation Strategy. Materials samples and panel to be signed off by Chair and Spokes. For the following reasons: 1. Having considered all the issues raised in the report, Planning Committee considered the proposal to reconfigure the previously approved scheme, the alterations to the external appearance of which are minor, constituted a considerable improvement on the scheme allowed at appeal under 06/0540/FUL. It recognised that the change in unit sizes and the reduction in total units from 131 to 99 allowed the substantial reduction in the proportion of one-bedroom (51% to 43%), the introduction of three-bedroom units, and an increase in average floor space. Concerns of Committee about the earlier scheme had been addressed and benefits to carbon saving also recognised as having improved. The provision and distribution of affordable housing was also considered and the mix and tenure proposed supported on this City Centre site. 2. This development has been approved subject to conditions and following the prior completion of a section 106 planning obligation, because subject to those requirements it is considered to generally conform to the Development Plan, particularly the following policies: Cambridgeshire and Peterborough Structure Plan 2003: policies P6/1, P9/8 and P9/9; Cambridge Local Plan (2006): policies 3/1, 3/4, 3/7, 3/11, 3/12, 3/13, 4/4, 4/11, 4/12, 4/13, 4/14, 5/1, 5/5, 5/11, 5/12, 8/1, 8/2, 8/4, 8/6, 8/9, 8/10, and 8/16; 3. The decision has also been made having had regard to all other material planning considerations, none of which was considered to have been of such significance as to justify doing other than grant planning permission. These reasons for approval can be a summary of the reasons for grant of planning permission only. For further details on the decision please see the officer report online at www.cambridge.gov.uk/planningpublicaccess or visit our Customer Service Centre, Mandela House, 4 Regent Street, Cambridge, CB2 1BY between 8am to 6pm Monday to Friday. Unless prior agreement has been obtained from the Head of Development Services, and the Chair and Spokesperson of this Committee to extend the period for completion of the Planning Obligation required in connection with this development, if the Obligation has not been completed by 30th November 2010 it is recommended that the application be refused for the following reason. The proposed development does not make appropriate provision for affordable housing, public open space, community development facilities, education and life-long learning facilities, transport mitigation measures, improvements to the public realm, waste storage facilities, public art, or monitoring of planning obligations, in accordance with policies 3/7, 3/8, 5/5, 5/14, 8/3 and 10/1 of the Cambridge Local Plan 2006 and policies P6/1 and P9/8 of the Cambridgeshire and Peterborough Structure Plan 2003; and as detailed in the Planning Obligation Strategy 2010, Eastern Corridor Area Transport Plan 2002, Public Art SPD 2010, and Guidance for Interpretation and Implementation of Open Space Standards 2006.