Resolved (by 6 votes to 0) to reject the officer recommendation to approve the application. Resolved (by 6 votes to 0) to refuse the application contrary to the officer recommendations for the following reasons: 1. The proposed extension to the hotel is unacceptable by virtue of its height, scale, mass and bulk, the material of its construction and its position on the site. The overall design of the extension is fussy and lacks coherence and it does not relate well to the existing building or the site context. The development would also have an adverse impact upon the City of Cambridge Conservation Area no.1 of which the site forms part and the Cambridge Green Belt, which lies adjacent to the site. The development is therefore contrary to policies ENV6 and ENV7 of the East of England Plan (2008) polices 3/4, 3/7, 3/14, 4/1 and 4/11 of the Cambridge Local Plan (2006) and to guidance provided by the National Planning Policy Framework (2012). 2. The proposed development does not make appropriate provision for transport mitigation measures, public art, or monitoring in accordance with Cambridge Local Plan 2006 policies 3/7, 8/3 and 10/1, Cambridgeshire and Peterborough Structure Plan 2003 policies P6/1, P9/8 and P9/9 and as detailed in the Planning Obligation Strategy 2010 and Public Art Supplementary Planning Document 2010.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Application 11/0988/FUL Agenda Number Item Date Received 2nd August 2011 Officer [name removed] Date 1st November 2011 Ward Market Site Doubletree By Hilton Granta Place Mill Lane Cambridge Cambridgeshire CB2 1RT Proposal Demolition of existing single storey leisure centre, and erection a three storey extension to provide 31 additional bedrooms and a new leisure centre. Applicant C/o [name removed] Architects 3 Whiting Street Bury St. Edmunds Suffolk IP33 1NX
1.0SITE DESCRIPTION/AREA CONTEXT
1.1Accessed from Mill Lane into Granta Place the site, approximately 1.47hectares in area, is located on the eastern bank of the River Cam, to the south of the City Centre. It is a particularly prominent and visible site within the Central Conservation Area (Area No.1) largely due to its elongated shape, which is surrounded by open green belt land affording long uninterrupted views across to the site.
1.2The application site accommodates the Doubletree Hilton Hotel, formerly known as the Garden House Hotel. The hotel was reconstructed in the mid 1960’s and then altered and extended following major fire damage in 1972. Further extensions were added in the 1980’s and 1990’s when a leisure club and swimming pool were incorporated. The current hotel is a bulky building of two phases; the majority of the building constructed in 1972 and the remaining of the pre-1972 hotel that was not destroyed in the fire. These sit uncomfortably with one another, their different architectural approaches, further disjointed by the leisure centre to the far south of the building on the site. 1.3 The site’s linear nature, on a north to south axis, presents a significant frontage along the River Cam to the West. The building is in close proximity to the listed buildings of Peterhouse College and the Fitzwilliam Museum. The linear nature also presents issues for access, entrances and the servicing of the hotel with the car park located to the south, approximately 125 metres from the main entrance on Granta Place. Most visitors arriving by car use a secondary entrance adjacent to the car park.
1.4Beyond the large car park, and lying along the length of the southern boundary of the hotel, is Coe Fen. This piece of land is classified as part of the city’s Green Belt. There is little in the way of screening onto this fen area. Additionally, there is a wall that belongs to Peterhouse College and this is listed.
1.5To summarise: the site is allocated as part of the City Centre in the Cambridge Local Plan (2006); the site falls within Conservation Area No.1 (Central); the building is not listed or a Building of Local Interest; there is a Tree Preservation Order (1988) on the site protecting 4 trees; the site falls within the controlled parking zone; and while the site is not located within the Green Belt, designated green belt surrounds the site immediately adjacent to the east, south and west.
2.0THE PROPOSAL
2.1This application seeks permission for the construction of a three storey extension to the southern end of the existing hotel. This will comprise an additional 31 bedrooms and a new leisure centre.
2.2In order to accommodate the proposed extension an existing link- attached single storey, pyramid shaped, leisure club is to be demolished. These works require Conservation Area Consent (CAC). A report for the CAC application, reference 11/0975/CAC appears elsewhere on the Agenda.
2.3The application is accompanied by the following supporting information:
1. Design and Access Statement 2. Noise impact assessment 3. Transport assessment and travel plan 4. Biodiversity Survey and report 5. Lighting assessment 6. Renewables strategy 7. Tree survey and arboricultural statement 8. Landscaping details, plan and statement
2.4This current proposal differs from the previously refused scheme, planning application reference 10/0103/FUL in the following ways;
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.