Resolved (unanimously) that the Head Of Legal Services be granted delegated authority by the Planning Committee to authorise the issue of an enforcement notice (provided that he is first satisfied that the appropriate conditions and legal tests for the issue of the notice are met) under the provisions of Section 172 of the Town and Country Planning Act 1990 (as amended) in respect of the following breach of planning control: “Without planning permission the carrying out of a material change of use as a broadcasting studio, café-bar and multi-media education centre and community facility to a D2 Assembly and Leisure use as a gymnasium.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
PLANNING ENFORCEMENT CONTROL – PLANNING CONTRAVENTION REPORT
The Former Howard Mallett Centre/Citylife House, Sturton Street, Cambridge.
Without planning permission, material change of use from use as broadcasting studio, cafe-bar and multi media education centre, and community facility (sui generis) to a gymnasium D2 Assembly and Leisure.
1. INTRODUCTION:
Site: Howard Mallett Centre, Sturton Street, Cambridge
Alleged Breach: Without planning permission, material change of use from a sui generis use as broadcasting studio, cafe-bar and multi media education centre, and community facility to a D2 Assembly and Leisure use as a gymnasium.
Owner/Occupier: The Allia Group
Purpose of Report: To consider whether it is expedient to initiate formal enforcement action in respect of the alleged breach of planning control. 2. PLANNING HISTORY:
Reference Description Outcome 65/0056 Erection of youth club Approved 67/0446 Three temporary buildings Approved 68/0471 Retention of three temporary buildings Approved 90/0073 Retention of six temporary buildings Approved 90/0678 Use for car parking Refused 92/0056 Erection of ramp and replacement wall Deemed consent 93/0056 Retention of temporary buildings Deemed consent 95/0367 Retention of temporary buildings Approved with conditions 96/0221 Erection of ramp No objection 96/0519 Alterations to front Withdrawn 97/1020 Change of use from youth club to studio / Approved café-bar / multi-media education centre with and community facility (sui generis) conditions 99/0223 Telecoms aerials Withdrawn 99/0454 Illuminated signage Approved with conditions 99/0956 Temporary change of use to winter Withdrawn nightshelter 03/1226 Installation of 1no non-illuminated Refused marketing board. 05/1171 Change of use from studio / café-bar / Approved multi-media education centre and with community facility (sui generis) to public conditions open space 05/1180 Demolition of Howard Mallett Centre Approved with conditions 06/0631/CAC Conservation Area Consent application Withdrawn 06/0567/FUL Erection of a community innovation Refused and centre. dismissed at appeal
3.0BACKGROUND 3.1 The site lies adjacent to St Matthew’s Piece in Petersfield Ward. It is bounded on the east side by York Street, on the north side by New Street, on the west side by Sturton Street, and to the south by open space (St Matthew’s Piece). The areas to the east, south and west of the site are primarily residential. The area to the north is a mixed use area, which includes light industrial and retail uses as well as houses, flats and student accommodation.
3.2The Howard Mallett Centre is a low, flat-roofed building measuring 38m x 29.5m. It rises 5.7m above the street level on Sturton Street, and is predominantly single storey. The north and west facades are of darkened glass, the east and south facades of brick. It was opened in 1968 as a youth club. This use had ceased by 1996. Parts of the building were later used by Parkside Community College. From 1998 to 2005 it was leased to Dawe Media for use as a multi-media centre during which time community use has been limited. The permitted use of the building is as a broadcasting studio, cafe-bar and multi media education centre, and community facility (sui generis).
3.3The site lies wholly within the City of Cambridge Conservation Area No.1 (Central), as extended in June 1993. The northern and eastern boundaries of the site also form the boundary of the conservation area.
3.4The planning enforcement section received a complaint in April 2011, in which it was alleged that several breaches of planning control were taking place, which included the material change of use of part of the building to a gymnasium.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.