CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Apr17Wednesday

Joint Development Control Committee - Cambridge Fringes

CambridgeHeldPapers from democracy.cambridge.gov.uk
Wednesday 17 April 2013, 10.30amHeld 4966 days ago.
Committee Room 1 & 2The Guildhall, Market Square, Cambridge, CB2 3QJ. Open to the public.
14 items, 20 papersAbout 13 MB, led by Discharge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11.
No exempt items listedEvery item is due to be heard in public.
This meeting was held17 April 2013
14items
20papers
9decisions
–exempt
Running order, sized by papersItem 13/15/JDCC to 13/28/JDCC
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Discharge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11 is the main business.

13
Procedure
Item 13/15/JDCC

Apologies

To receive any apologies for absence.

13
Procedure
Item 13/16/JDCC

Declarations of Interest

Members are asked to declare at this stage any interests that they may have in an item shown on this agenda. If any member of the Committee is unsure whether or not they should declare an interest on a particular matter, they should seek advice from the Head of Legal Services before the meeting .

13
Report
Item 13/17/JDCC

Minutes

: The minutes of the meeting held on 20 February 2013 were approved and signed as a correct record.

PackMinutes84 KBDownload
13
Report
Item 13/18/JDCC

Review of Scheme of Delegation

Decision: Resolved (unanimously) to accept the officer recommendation to review the Scheme of Delegation . Decision page

ReportReview of Scheme of Delegation89 KBDownload
13
ReportMain business
Item 13/19/JDCC

Discharge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11

Decision: Resolved (unanimously) to discharge planning condition 5 in respect of both permissions 11/1114/OUT and S/1886/11. Decision page

3 papers, 4.5 MBSearch inside with Pro
AppendixAppendix 1: Conditions for approval by JDCC /19/JDCC28 KBDownload
AppendixAppendix 2: Extracts from the Site Wide Phasing Plan February 2013 /19/JDCC4.3 MBDownload
ReportDischarge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11120 KBDownload
13
Report
Item 13/20/JDCC

Discharge of Condition 07, Design Code, pursuant to 11/1114/OUT and S/1886/11

Decision: Resolved (unanimously) to discharge planning condition 7 in respect of both permissions 11/1114/OUT and S/1886/11 . Decision page

1 paper, 145 KBSearch inside with Pro
ReportDischarge of Condition 07, Design Code, pursuant to 11/1114/OUT and S/1886/11145 KBDownload
13
Report
Item 13/21/JDCC

Discharge of Condition 9 for a Strategy for Youth and Play Provision Pursuant to 11/1114/OUT & S/1886/11

Decision: Resolved (unanimously) to discharge planning condition 9 in respect of both permissions 11/1114/OUT and S/1886/11. Decision page

4 papers, 510 KBSearch inside with Pro
Report130417 Amendment Sheet JDCC /21/JDCC48 KBDownload
AppendixAppendix 1: Conditions for approval by JDCC /21/JDCC28 KBDownload
AppendixAppendix 2: Key Extracts from the North West Cambridge Strategy for Youth Facilities and Children's Play /21/JDCC349 KBDownload
ReportDischarge of Condition 9 for a Strategy for Youth and Play Provision Pursuant to 11/1114/OUT & S/1886/1185 KBDownload
13
Report
Item 13/22/JDCC

Discharge of Condition 52 for a Construction Environmental Management Plan Pursuant to 11/1114/OUT & S/1886/11

Decision: Resolved (unanimously) to discharge planning condition 52 in respect of both permissions 11/1114/OUT and S/1886/11. Also to require the University to the include at paragraph 5.10 of the Construction Environmental Management Plan that they would encourage construction workers to not park in the surrounding residential streets or the Park and Ride site. An update would be provided to Members at the June meeting of the JDCC. Decision page

3 papers, 2.3 MBSearch inside with Pro
AppendixAppendix 1: Conditions for approval by JDCC /22/JDCC28 KBDownload
AppendixAppendix 2: Key Extracts from CEMP /22/JDCC2.2 MBDownload
ReportDischarge of Condition 52 for a Construction Environmental Management Plan Pursuant to 11/1114/OUT & S/1886/1194 KBDownload
13
Procedure
Item 13/23/JDCC

Re-Ordering Agenda

13
Report
Item 13/24/JDCC

13/0279/FUL - Use of Land to Provide a Temporary Access Road from Madingley Road into the North West Cambridge Site During Construction for a Period of 10 Years.

Decision: Resolved (unanimously) to accept the officer recommendation to approve planning permission as per the agenda and subject to the inclusion that within the revised wording of condition 3: The approved development shall be carried out in accordance with the submitted Construction Method Strategy by URS, dated 6th March 2013. Notwithstanding the approved Construction Method Statement, prior to the commencement of development, a revised statement shall be submitted to and approved by the local... Decision page

Report13/0279/FUL: Use of Land to Provide a Temporary Access Road from Madingley Road into the North West Cambridge Site During Construction for a Period of 10 Years.202 KBDownload
AppendixAppendix 1: Site Location Plan /24/JDCC2.8 MBDownload
13
Report
Item 13/25/JDCC

13/0158/FUL - Application for a sewage pumping station to serve the new development at Clay Farm

Decision: Resolved (unanimously - by 10 votes to 0 (SCDC Councillors did not vote )) to accept the officer recommendation to approve planning permission as per the agenda. Reasons for Approval 1. This development has been approved subject to conditions because subject to those requirements it is considered to generally conform to the Development Plan, particularly the following policies: Cambridge Local Plan 2006: 3/2, 3/4, 4/3, 4/4, 8/18, 9/3, 9/5. 2. The decision has been made having had regard to all... Decision page

1 paper, 387 KBSearch inside with Pro
Report13/0158/FUL: Application for a sewage pumping station to serve the new development at Clay Farm387 KBDownload
13
Report
Item 13/26/JDCC

13/0105/REM Application for Secondary School at Clay Farm

Decision: Resolved (by 6 votes to 1 (SCDC Councillors did not vote ) ) to accept the officer recommendation to approve reserved matters permission as per the agenda. Reasons for Approval 1. This development has been approved subject to conditions because subject to those requirements it is considered to generally conform to the Development Plan, particularly the following policies: Cambridge Local Plan 2006: 3/1,3/2, 3/3, 3/4, 3/6 3/7, 3/8, 3/11, 3/12, 4/1, 4/2, 4/3, 4/4, 4/13, 4/15, 5/13, 6/2, 8/2, 8/4... Decision page

2 papers, 937 KBSearch inside with Pro
Report13/0105/REM Application for Secondary School at Clay Farm327 KBDownload
AppendixAppendix J: plans.doc /26/JDCC610 KBDownload
13
Report
Item 13/27/JDCC

13/0268/FUL - Application for an electrical substation to serve part of Clay Farm (Parcels 15-18 and 19-20)

Decision: Resolved (unanimously - by 10 votes to 0 (SCDC Councillors did not vote ) ) to accept the officer recommendation to approve planning permission as per the agenda. Reasons for Approval 1. This development has been approved subject to conditions because subject to those requirements it is considered to generally conform to the Development Plan, particularly the following policies: Cambridge Local Plan 2006: 3/2, 3/4, 3/12, 4/13, 9/3, 9/5. 2. The decision has been made having had regard to all... Decision page

2 papers, 1.5 MBSearch inside with Pro
Report13/0268/FUL: Application for an electrical substation to serve part of Clay Farm (Parcels 15-18 and 19-20)95 KBDownload
AppendixAppendix 1: Plan /27/JDCC1.4 MBDownload
13
Procedure
Item 13/28/JDCC

07/0620/OUT - Pre submission briefing on reserved matters for 294 dwellings

Read inside all 20 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

The main business: Discharge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11

Item 13/19/JDCC is where most of this meeting's papers sit: 3 papers, about 4.5 MB.

Item 13/19/JDCC

Discharge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11

What is in the pack3 papers, about 4.5 MB
Appendix 1
Conditions for approval by JDCC /19/JDCCSupporting paper
28 KB
Appendix 2
Extracts from the Site Wide Phasing Plan February 2013 /19/JDCCSupporting paper
4.3 MB
Report
Discharge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11The report to the committee
120 KB
Read and search every page of this itemPro opens all 3 papers, and keeps them if the council removes them.

How this item got here

This committee has dealt with the subject before.

20 February 2013Parcel 1B, 2 and 5 - Clay Farm Development Site, Cambridge - Reserved matters (access, appearance, landscaping, layout and scale) for 229 dwellings pursuant to outline application 07/0620/OUT
20 February 201308/0048/OUT & S/0054/08/O - Trumpington Meadows, Hauxton Road, Cambridge - Development phasing update by Crest NicholsonBriefing
20 February 2013Trumpington Meadows, Hauxton Road, Cambridge - Discharge of Condition 31 - Redesign of Block E
17 April 2013Discharge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11This meeting.

Every paper for this meeting

All 20 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
MinutesItem 13/17/JDCC, Minutes
84 KB
Kept 5 Oct
Review of Scheme of DelegationItem 13/18/JDCC, Review of Scheme of Delegation
89 KB
Kept 5 Oct
Conditions for approval by JDCC /19/JDCCAppendix 1, item 13/19/JDCC, Discharge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11
28 KB
Kept 5 Oct
Extracts from the Site Wide Phasing Plan February 2013 /19/JDCCAppendix 2, item 13/19/JDCC, Discharge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11
4.3 MB
Kept 5 Oct
Discharge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11Item 13/19/JDCC, Discharge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11
120 KB
Kept 5 Oct
Discharge of Condition 07, Design Code, pursuant to 11/1114/OUT and S/1886/11Item 13/20/JDCC, Discharge of Condition 07, Design Code, pursuant to 11/1114/OUT and S/1886/11
145 KB
Kept 5 Oct
130417 Amendment Sheet JDCC /21/JDCCItem 13/21/JDCC, Discharge of Condition 9 for a Strategy for Youth and Play Provision Pursuant to 11/1114/OUT & S/1886/11
48 KB
Kept 5 Oct
Conditions for approval by JDCC /21/JDCCAppendix 1, item 13/21/JDCC, Discharge of Condition 9 for a Strategy for Youth and Play Provision Pursuant to 11/1114/OUT & S/1886/11
28 KB
Kept 5 Oct
Key Extracts from the North West Cambridge Strategy for Youth Facilities and Children's Play /21/JDCCAppendix 2, item 13/21/JDCC, Discharge of Condition 9 for a Strategy for Youth and Play Provision Pursuant to 11/1114/OUT & S/1886/11
349 KB
Kept 5 Oct
Discharge of Condition 9 for a Strategy for Youth and Play Provision Pursuant to 11/1114/OUT & S/1886/11Item 13/21/JDCC, Discharge of Condition 9 for a Strategy for Youth and Play Provision Pursuant to 11/1114/OUT & S/1886/11
85 KB
Kept 5 Oct
Conditions for approval by JDCC /22/JDCCAppendix 1, item 13/22/JDCC, Discharge of Condition 52 for a Construction Environmental Management Plan Pursuant to 11/1114/OUT & S/1886/11
28 KB
Kept 5 Oct
Key Extracts from CEMP /22/JDCCAppendix 2, item 13/22/JDCC, Discharge of Condition 52 for a Construction Environmental Management Plan Pursuant to 11/1114/OUT & S/1886/11
2.2 MB
Kept 5 Oct
Discharge of Condition 52 for a Construction Environmental Management Plan Pursuant to 11/1114/OUT & S/1886/11Item 13/22/JDCC, Discharge of Condition 52 for a Construction Environmental Management Plan Pursuant to 11/1114/OUT & S/1886/11
94 KB
Kept 5 Oct
13/0279/FUL: Use of Land to Provide a Temporary Access Road from Madingley Road into the North West Cambridge Site During Construction for a Period of 10 Years.Item 13/24/JDCC, 13/0279/FUL - Use of Land to Provide a Temporary Access Road from Madingley Road into the North West Cambridge Site During Construction for a Period of 10 Years.
202 KB
Kept 5 Oct
Site Location Plan /24/JDCCAppendix 1, item 13/24/JDCC, 13/0279/FUL - Use of Land to Provide a Temporary Access Road from Madingley Road into the North West Cambridge Site During Construction for a Period of 10 Years.
2.8 MB
Kept 5 Oct
13/0158/FUL: Application for a sewage pumping station to serve the new development at Clay FarmItem 13/25/JDCC, 13/0158/FUL - Application for a sewage pumping station to serve the new development at Clay Farm
387 KB
Kept 5 Oct
13/0105/REM Application for Secondary School at Clay FarmItem 13/26/JDCC, 13/0105/REM Application for Secondary School at Clay Farm
327 KB
Kept 5 Oct
plans.doc /26/JDCCAppendix J, item 13/26/JDCC, 13/0105/REM Application for Secondary School at Clay Farm
610 KB
Kept 5 Oct
13/0268/FUL: Application for an electrical substation to serve part of Clay Farm (Parcels 15-18 and 19-20)Item 13/27/JDCC, 13/0268/FUL - Application for an electrical substation to serve part of Clay Farm (Parcels 15-18 and 19-20)
95 KB
Kept 5 Oct
Plan /27/JDCCAppendix 1, item 13/27/JDCC, 13/0268/FUL - Application for an electrical substation to serve part of Clay Farm (Parcels 15-18 and 19-20)
1.4 MB
Kept 5 Oct

This committee over time

Every Joint Development Control Committee - Cambridge Fringes meeting we have read, the dates it has set for the future, and each time those dates have changed.

140 meetings, 2007 to 2020Dot size shows the number of papers
2007200920112013201520172019
HeldThis meeting
MeetingItemsPapers
15 Jul 2020Wednesday
5items
9papers
HeldOpen
24 Jun 2020Wednesday
0items
0papers
HeldOpen
27 May 2020Wednesday
5items
9papers
HeldOpen
15 Apr 2020Wednesday
0items
0papers
HeldOpen
18 Mar 2020Wednesday
7items
14papers
HeldOpen
19 Feb 2020Wednesday
0items
0papers
HeldOpen
22 Jan 2020Wednesday
3items
0papers
HeldOpen
18 Dec 2019Wednesday
7items
4papers
HeldOpen
20 Nov 2019Wednesday
8items
5papers
HeldOpen
23 Oct 2019Wednesday
6items
1papers
HeldOpen
18 Sep 2019Wednesday
6items
10papers
HeldOpen
21 Aug 2019Wednesday
4items
4papers
HeldOpen
17 Jul 2019Wednesday
5items
0papers
HeldOpen
19 Jun 2019Wednesday
7items
3papers
HeldOpen
17 Apr 2019Wednesday
6items
7papers
HeldOpen
20 Mar 2019Wednesday
6items
8papers
HeldOpen
20 Feb 2019Wednesday
4items
2papers
HeldOpen
23 Jan 2019Wednesday
4items
2papers
HeldOpen
19 Dec 2018Wednesday
4items
1papers
HeldOpen
21 Nov 2018Wednesday
4items
0papers
HeldOpen
24 Oct 2018Wednesday
4items
8papers
HeldOpen
12 Sep 2018Wednesday
4items
3papers
HeldOpen
15 Aug 2018Wednesday
0items
0papers
HeldOpen
18 Jul 2018Wednesday
7items
7papers
HeldOpen
20 Jun 2018Wednesday
8items
8papers
HeldOpen
18 Apr 2018Wednesday
0items
0papers
HeldOpen
14 Mar 2018Wednesday
8items
7papers
HeldOpen
14 Feb 2018Wednesday
0items
0papers
HeldOpen
24 Jan 2018Wednesday
4items
4papers
HeldOpen
13 Dec 2017Wednesday
6items
1papers
HeldOpen
15 Nov 2017Wednesday
6items
4papers
HeldOpen
18 Oct 2017Wednesday
5items
5papers
HeldOpen
13 Sep 2017Wednesday
4items
2papers
HeldOpen
13 Sep 2017Wednesday
1items
0papers
HeldOpen
16 Aug 2017Wednesday
0items
0papers
HeldOpen
19 Jul 2017Wednesday
5items
7papers
HeldOpen
21 Jun 2017Wednesday
8items
6papers
HeldOpen
17 May 2017Wednesday
0items
0papers
HeldOpen
19 Apr 2017Wednesday
4items
3papers
HeldOpen
15 Mar 2017Wednesday
5items
3papers
HeldOpen
15 Feb 2017Wednesday
7items
7papers
HeldOpen
18 Jan 2017Wednesday
5items
3papers
HeldOpen
14 Dec 2016Wednesday
4items
2papers
HeldOpen
16 Nov 2016Wednesday
4items
1papers
HeldOpen
19 Oct 2016Wednesday
0items
0papers
HeldOpen
14 Sep 2016Wednesday
7items
14papers
HeldOpen
17 Aug 2016Wednesday
4items
6papers
HeldOpen
20 Jul 2016Wednesday
4items
1papers
HeldOpen
21 Jun 2016Tuesday
8items
2papers
HeldOpen
18 May 2016Wednesday
6items
10papers
HeldOpen
20 Apr 2016Wednesday
5items
9papers
HeldOpen
16 Mar 2016Wednesday
5items
4papers
HeldOpen
17 Feb 2016Wednesday
7items
5papers
HeldOpen
20 Jan 2016Wednesday
0items
0papers
HeldOpen
16 Dec 2015Wednesday
0items
0papers
HeldOpen
18 Nov 2015Wednesday
5items
6papers
HeldOpen
21 Oct 2015Wednesday
7items
7papers
HeldOpen
18 Sep 2015Friday
7items
6papers
HeldOpen
16 Sep 2015Wednesday
0items
0papers
HeldOpen
19 Aug 2015Wednesday
7items
10papers
HeldOpen
15 Jul 2015Wednesday
4items
5papers
HeldOpen
17 Jun 2015Wednesday
8items
6papers
HeldOpen
20 May 2015Wednesday
0items
0papers
HeldOpen
15 Apr 2015Wednesday
0items
0papers
HeldOpen
18 Mar 2015Wednesday
7items
5papers
HeldOpen
18 Feb 2015Wednesday
7items
7papers
HeldOpen
21 Jan 2015Wednesday
5items
4papers
HeldOpen
17 Dec 2014Wednesday
9items
9papers
HeldOpen
19 Nov 2014Wednesday
7items
6papers
HeldOpen
15 Oct 2014Wednesday
0items
0papers
HeldOpen
17 Sep 2014Wednesday
5items
4papers
HeldOpen
20 Aug 2014Wednesday
11items
9papers
HeldOpen
16 Jul 2014Wednesday
6items
7papers
HeldOpen
18 Jun 2014Wednesday
12items
16papers
HeldOpen
7 May 2014Wednesday
7items
3papers
HeldOpen
16 Apr 2014Wednesday
8items
11papers
HeldOpen
19 Mar 2014Wednesday
5items
8papers
HeldOpen
26 Feb 2014Wednesday
9items
12papers
HeldOpen
22 Jan 2014Wednesday
7items
2papers
HeldOpen
18 Dec 2013Wednesday
9items
13papers
HeldOpen
20 Nov 2013Wednesday
9items
15papers
HeldOpen
16 Oct 2013Wednesday
6items
6papers
HeldOpen
18 Sep 2013Wednesday
4items
1papers
HeldOpen
21 Aug 2013Wednesday
10items
11papers
HeldOpen
17 Jul 2013Wednesday
9items
6papers
HeldOpen
19 Jun 2013Wednesday
5items
3papers
HeldOpen
15 May 2013Wednesday
0items
0papers
HeldOpen
17 Apr 2013Wednesday, this meeting
14items
20papers
20 Mar 2013Wednesday
0items
0papers
HeldOpen
20 Feb 2013Wednesday
8items
7papers
HeldOpen
23 Jan 2013Wednesday
7items
9papers
HeldOpen
28 Nov 2012Wednesday
0items
0papers
HeldOpen
31 Oct 2012Wednesday
5items
1papers
HeldOpen
4 Oct 2012Thursday
0items
0papers
HeldOpen
6 Sep 2012Thursday
7items
8papers
HeldOpen
8 Aug 2012Wednesday
4items
5papers
HeldOpen
11 Jul 2012Wednesday
5items
8papers
HeldOpen
13 Jun 2012Wednesday
5items
3papers
HeldOpen
16 May 2012Wednesday
5items
4papers
HeldOpen
18 Apr 2012Wednesday
5items
7papers
HeldOpen
21 Mar 2012Wednesday
5items
2papers
HeldOpen
22 Feb 2012Wednesday
5items
6papers
HeldOpen
25 Jan 2012Wednesday
6items
2papers
HeldOpen
1 Dec 2011Thursday
7items
10papers
HeldOpen
1 Nov 2011Tuesday
0items
0papers
HeldOpen
6 Oct 2011Thursday
8items
17papers
HeldOpen
6 Sep 2011Tuesday
0items
0papers
HeldOpen
10 Aug 2011Wednesday
8items
17papers
HeldOpen
13 Jul 2011Wednesday
9items
10papers
HeldOpen
15 Jun 2011Wednesday
7items
2papers
HeldOpen
18 May 2011Wednesday
7items
1papers
HeldOpen
20 Apr 2011Wednesday
7items
4papers
HeldOpen
23 Mar 2011Wednesday
5items
5papers
HeldOpen
23 Feb 2011Wednesday
6items
7papers
HeldOpen
26 Jan 2011Wednesday
6items
5papers
HeldOpen
2 Dec 2010Thursday
7items
7papers
HeldOpen
2 Nov 2010Tuesday
8items
10papers
HeldOpen
7 Oct 2010Thursday
0items
0papers
HeldOpen
8 Sep 2010Wednesday
5items
5papers
HeldOpen
11 Aug 2010Wednesday
5items
6papers
HeldOpen
14 Jul 2010Wednesday
9items
11papers
HeldOpen
16 Jun 2010Wednesday
5items
7papers
HeldOpen
19 May 2010Wednesday
7items
7papers
HeldOpen
21 Apr 2010Wednesday
7items
7papers
HeldOpen
24 Mar 2010Wednesday
8items
9papers
HeldOpen
24 Mar 2010Wednesday
0items
6papers
HeldOpen
24 Feb 2010Wednesday
0items
1papers
HeldOpen
26 Jan 2010Tuesday
0items
2papers
HeldOpen
8 Jul 2009Wednesday
0items
4papers
HeldOpen
12 May 2009Tuesday
0items
6papers
HeldOpen
15 Apr 2009Wednesday
0items
3papers
HeldOpen
21 Jan 2009Wednesday
0items
7papers
HeldOpen
3 Nov 2008Monday
0items
5papers
HeldOpen
2 Oct 2008Thursday
0items
3papers
HeldOpen
11 Jun 2008Wednesday
0items
6papers
HeldOpen
14 May 2008Wednesday
0items
5papers
HeldOpen
16 Apr 2008Wednesday
0items
2papers
HeldOpen
19 Mar 2008Wednesday
0items
5papers
HeldOpen
20 Feb 2008Wednesday
0items
2papers
HeldOpen
18 Jul 2007Wednesday
0items
2papers
HeldOpen

Follow the Joint Development Control Committee - Cambridge Fringes

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Cambridge, Joint Development Control Committee - Cambridge Fringes

Joint Development Control Committee - Cambridge Fringes: 3 kinds of updateCambridge, sent the same day
PDF
20 papers published for 17 AprilDischarge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11 and 19 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 17 AprilThe committee's resolutions, the day they are recorded
ABC
"discharge" found in 4 papersDischarge of Condition 5 for Site Wide Phasing Plan Pursuant to 11/1114/OUT & S/1886/11 and Discharge of Condition 07, Design Code, pursuant to 11/1114/OUT and S/1886/11
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Joint Development Control Committee - Cambridge Fringes, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies