Resolved unanimously (by 7 votes to 0) to accept the officer recommendation subject to the completion of the s106 Agreement, additional / amended conditions and reasons for approval as per the agenda. Pre-Committee Amendments to Recommendation: Revised condition 9 Prior to the commencement of development and with reference to BS 5837 2012 section 6, details of the specification and position of protection barriers and any other protection measures and construction techniques to be adopted for the protection of any trees from damage during the course of any activity related to the development, shall be submitted to the local planning authority for its written approval in the form of an Arboricultural Method Statement (AMS) and Tree Protection Plan (TPP). A site visit will be arranged with the retained arboriculturalist , developer and Local Planning Authority Tree Officer to agree tree works and the location and specification of tree protection barriers and temporary ground protection. The approved AMS and TPP will be implemented throughout the development and the agreed means of protection shall be retained on site until all equipment, and surplus materials have been removed from the site. Nothing shall be stored or placed in any area protected in accordance with this condition, and the ground levels within those areas shall not be altered nor shall any excavation be made without the prior written approval of the local planning authority. Reason: In the interests of making adequate provision for the retention of trees, Cambridge Local Plan 2006 policy 4/4. New condition 16 No development shall commence until details of facilities for the covered, secured parking of bicycles for use in connection with the development hereby permitted shall be submitted to and approved by the local planning authority in writing. The approved facilities shall be provided in accordance with the approved details before use of the development commences. Reason: To ensure appropriate provision for the secure storage of bicycles. (Cambridge Local Plan 2006 policy 8/6)
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Application 13/0776/FUL Agenda Number Item Date Received 5th June 2013 Officer [name removed] Date 4th September 2013 Ward Abbey Site 51 Barnwell Road Cambridge Cambridgeshire CB5 8RG Proposal Demolition of 24 number 1 bedroom bed-sit flats and 3 stores. Erection of 21 number family dwellings (12 flats + 8 houses + 1 FOG unit) with mixed tenure (12 number Affordable + 8 number Private + 1 Shared Ownership/Equity). Associated car parking and cycle parking and private and shared amenity space. No change of use. Applicant [name removed] 950Capability Green Luton Bedfordshire LU 3LU England
SUMMARY The development accords with the Development Plan for the following reasons:
1) The proposed scheme will positively improve the character and appearance of Barnwell Road, providing needed affordable homes.
2) There will not in my view be a harmful visual impact on neighbouring gardens. 3) Adequate refuse and cycle parking is integrated into the scheme.
RECOMMENDATION APPROVAL 1.0 SITE DESCRIPTION/AREA CONTEXT
1.1The application site is a rectangular shaped plot situated on the eastern side of Barnwell Road, which is a primary road, the A1134.
1.2The site is currently occupied by three, two storey buildings, constructed in the mid 20th century, accommodating 24 one bedroom bedsit flats. 23 of the flats are let on a social rent basis with one leasehold unit.
1.3To the north of the site is Barnwell Road Library, a single storey flat roof building. Further to the north east is Stepneys a three storey flat development approved in 2004. To the west are the residential gardens of properties fronting Peverell Road. To the east fronting Barnwell Road is the grassed highway verge, tree planting and several car parking bays.
1.4The site is not within Conservation Area. There are several mature trees on the northern boundary of the site and fronting Barnwell Road.
2.0THE PROPOSAL
2.1Permission is sought for the erection of 21 family dwellings, consisting of 12 flats and 8 houses and one flat over garage (FOG) unit.
2.2The northern half of the development comprises an L shaped building accommodating the affordable units which are served by a separate accessway off Barnwell Road adjacent to the library. The proposed apartment building has an eaves height of 8.5m with an overall ridge level of approximately 10m.
2.3To the south of the site four pairs of semi-detached houses address Barnwell Road and the internal courtyard, which will be in private tenure. The FOG unit is situated behind the main frontage and will be in shared ownership/equity.
2.4The new buildings will be constructed in red brickwork, areas of external cladding and grey UPVC windows.
2.5Refuse and bicycle storage is provided within the private rear gardens or communal stores serving the apartments. 2.6 The application is accompanied by the following supporting information:
1. Design and Access Statement 2. Planning Statement 3. Soil handing Strategy 4. Renewable energy strategy 5. Sustainability Checklist 6. Landscape management plan 7. Waste Management Plan
Amended and Additional Plans
2.7Amended plans have been received with the following changes:
- Removal of projecting grey cladded bays from the dwelling houses. - Increase in balcony depth to 1.5m. - Secure boundary fence to front of the flats. - Additional turning space for plots 18 and 20. - Block paved surface areas of parking with metal studs indicating parking spaces. - Elevations of bin and cycle store.
The above changes are not of such significance as to require reconsulting neighbours.
2.8I anticipate that further amended plans will be submitted in advance of the Committee meeting to show the following:
- Change of cladding to upper floor of apartment and FOG buildings. - Minor alterations to porch detail on the dwelling houses. - Removal of grey eternit window surrounds - Dimensions of the proposed accesses
These further changes do not require reconsulting neighbours.
3.0SITE HISTORY
3.1No relevant history. 4.0 PUBLICITY
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.