Resolved
Resolved (6 votes with 1 abstention) to grant the application for full planning permission in accordance with the Officer recommendation, for reasons set out in the Officer report, subject to the satisfactory completion of the s106 agreement by 14 May 2014, and subject to the conditions recommended by the Officer. Pre-Committee Amendments to Recommendation Amended conditions 3, 5, 19 & 25 (additional text underlined , deleted text struck through ): 3 Prior to commencement of any works above grade development within the area identified on approved plan NBBJ-SW-GA-XX-0020 Rev P1 (Proposed Site Plan – Landscape Condition Area) as ‘zone approved within planning application street furniture and materials to be reserved’ a detailed planting plan with identified tree species and associated tree pits, hard and soft landscaping specifications, utility service routes and lighting details, shall be submitted to, and approved by the local planning authority. The development shall then be carried out in accordance with the approved details and implemented in full prior to occupation of the building. 5. Prior to occupation a detailed landscape plan to include the landscape design, materials, location and type of street furniture, planting plan (with identified tree species along with associated tree pits) hard and soft landscaping specifications, drainage attenuation measures, utility service routes and lighting details of any works within the area identified on approved plan NBBJ-SW-GA-XX-0020 Rev P1 (Proposed Site Plan – Landscape Condition Area) as ‘zone with landscape to be covered by condition’ shall be submitted to, and approved by the local planning authority. The development shall then be carried out in accordance with the approved details and prior to occupation of the building hereby approved or concurrently with the construction of the ‘high street’ whichever the sooner. Emergency Back Up Generator 19 Prior to the occupation of the development/use hereby permitted, a scheme for the insulation of the generator building(s) and/or plant in order to minimise the level of noise emanating from the said building(s) and/or plant shall be submitted to and approved in writing by the local planning authority. The scheme shall include the following: (i) Generator - Emergency Use Only The generator shall only be used in the event of mains power failure or in accordance with (ii) below. It shall not be used as an alternative supply in the event of disconnection from the mains supply following for example non-payment. Related informative Back Up Emergency Generator To satisfy the emergency back up generator condition the noise level from the emergency generator associated with this application should not raise the existing background level (L 90 ) by more than 10 5 dB( A) at the boundary of the premises subject to this application and having regard to noise sensitive premises. Higher noise levels will only be considered for generators which are not located close to sensitive receptors and full justification has been provided. It should be noted that depending on the purpose of the emergency generator different criteria apply. These are as follows: 1) If the generator is for hospitals, computer servers etc it should not raise the existing background level (L 90 ) by more than 10 dB( A) at the boundary of the premises subject to this application. 2) If the generator is non emergency ie for hotels etc it should not raise the existing background level (L 90 ) by more than 5 dB( A) at the boundary of the premises subject to this application. Archaeology 25 No development shall take place until the applicant, or their agents or successors in title, has secured the implementation of a programme of archaeological work in accordance with a written scheme of investigation including the timetable for the works which has been submitted by the applicant and approved in writing by the local planning authority. This written scheme will include the following components, completion of each of which will trigger the phased discharging of the condition: ( i ) Approval of a Written Scheme of Investigation; (ii) Fieldwork in accordance with the agreed Written Scheme of Investigation; (iii) Completion of a Post-Excavation Assessment report and approval of an approved Updated Project Design: to be submitted within six months of the completion of fieldwork, unless otherwise agreed in advance with the Planning Authority; (iv) Completion of analysis, preparation of site archive ready for deposition at a store approved by the Planning Authority, production of an archive report, and submission of a publication report: to be completed within two years of the completion of fieldwork, unless otherwise agreed in advance with the Planning Authority. REASON : To ensure the implementation of an appropriate archaeological investigation, recording, reporting and publication. (Cambridge Local Plan 2006 policy 4/9) New conditions: Landscape Replacement Any trees or plants provided as any part of any landscaping scheme which, within a period of 5 years from the planting date, die, are removed or become seriously damaged or diseased, shall be replaced in the next planting season with others of a similar size and species as those originally planted . REASON In the interests of visual amenity and safeguarding trees that are worthy of retention (Cambridge Local Plan 2006 policies 4/3 and 4/4). Fire Hyrants Prior to the commencement of any works above grade development hereby approved a scheme for the provision of fire hydrants shall be submitted to and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details and the approved scheme shall be fully operational prior to the first occupation of that development parcel. REASON To ensure the provision of adequate water supply infrastructure to protect the safe living and working environment for all users and visitors (Policies 3/7, 3/12 and 8/18 of the Cambridge Local Plan).