Resolved (unanimously) to grant the application for reserved matters in accordance with the officer recommendation, for the reasons set out in the officer report, and subject to the conditions and amended condition 16 recommended by the officers. Pre-Committee Amendments to Recommendation : Condition 16 (Cycle Parking) needs to read ‘Requires discharge, requires further information’ instead of ‘Discharged’.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Application 14/1648/REM Agenda Number Item Date Received 21st October 2014 Officer [name removed] Date 20th January 2015 Ward Queen Ediths Site Homerton Business Centre Purbeck Road Cambridge Cambridgeshire Proposal Reserved Matters Scheme (access, appearance, landscaping, layout and scale) for the erection of 95 residential units including affordable housing, together with associated landscaping (the provision of a central amenity space and the reconfiguration of the existing on-site balancing pond to the south), car and cycle parking, and associated infrastructure works pursuant to application 13/1250/OUT. Applicant Mr c/o Agent United Kingdom
SUMMARY The proposal accords with the Development Plan for the following reasons:
-The principle of development has already been accepted as part of the outline planning permission and the reserved matters application accords with the parameters set through the outline consent.
-The development is of a high quality design and would provide a high standard of residential amenity for future occupiers.
-There would be no adverse impact on nearby residential occupiers.
RECOMMENDATION APPROVAL 1.0 SITE DESCRIPTION/AREA CONTEXT
1.1The site is accessed from the end of Purbeck Road off Hills Road. Its current name is the Homerton Business Centre but it has also been known as the Michael Young Centre when the National Extension College owned it. It was formerly the home of Rattee and Kett builders who operated a stonemasonry yard and joinery business. A number of 20th century office and industrial buildings sat around a central landscaped amenity space that was inspired by its former stonemasonry use, incorporating industrial sculpture, a pond and carved stonework. These buildings, which were 1-3 storeys high, one of which still occupies the Cambridge Cookery School, have now mainly been demolished. Construction work is currently being undertaken for a new building for Abbey College.
1.2The site is allocated in the Cambridge Local Plan (2006) as a protected industrial/storage site. It does not fall within a conservation area, contains no listed or locally listed buildings, is outside the controlled parking zone and contains no protected trees. Policy 26 in the Local Plan 2014 proposed submission document allocates sites for various uses throughout the city. This site is allocated for mixed uses with a capacity for 50 dwellings and 0.5ha of employment uses.
1.3To the north of the site is Purbeck House (otherwise known as Centro). This is a student accommodation block which runs parallel to the railway line of stepped height, rising to 6 storeys. This is turn adjoins Tripos Court and then the Belvedere residential development which incorporates mainly 5 storey residential apartments rising to a 10 storey tower element at its apex with Hills Road bridge. To the north east is Hills Road Sixth Form College campus, comprising a mix of education buildings and open space which forms a land parcel that extends along Purbeck Road to Hills Road.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.