Resolved (by 4 votes to 3) to reject the officer recommendation to refuse the application. Resolved (by 6 votes to 0) to approve the application contrary to the officer recommendation for the following reasons: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2 The development hereby permitted shall be carried out in accordance with the approved plans as listed on this decision notice. 3 No construction work or demolition work shall be carried out or plant operated other than between the following hours: 0800 hours and 1800 hours on Monday to Friday, 0800 hours and 1300 hours on Saturday and at no time on Sundays, Bank or Public Holidays.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Application 15/1014/FUL Agenda Number Item Date Received 28th May 2015 Officer [name removed] Date 23rd July 2015 Ward Romsey Site 74 Catharine Street Cambridge Cambridgeshire CB1 3AR Proposal Rear roof extension Applicant [name removed] 74 Catharine Street Cambridge Cambridgeshire CB1 3AR
SUMMARY The development does not accord with the Development Plan for the following reasons:
The proposal is highly visible in the street and therefore will have a detrimental impact on the Conservation Area
The design of the proposal is a near full width and full height roof extension which will dominate the roof
RECOMMENDATION REFUSAL
1.0SITE DESCRIPTION/AREA CONTEXT
1.1The application site, no.74 Catharine Street, is situated on the east side of Catharine Street and is comprised of a two storey terraced property with a small rear garden. The surrounding area is predominantly residential and is formed of similar sized terraced properties.
1.2The site falls within the Central Cambridge Conservation Area (2011). 2.0 THE PROPOSAL
2.1The application seeks full planning permission for a rear roof extension designed in slate and timber. A previous application was refused for the same design under planning reference 15/0377/FUL.
4.1Advertisement: Yes Adjoining Owners: Yes Site Notice Displayed: Yes
5.0POLICY
5.1See Appendix 1 for full details of Central Government Guidance, Cambridge Local Plan 2006 policies, Supplementary Planning Documents and Material Considerations.
5.2Relevant Development Plan policies
PLAN POLICY NUMBER
Cambridge Local 3/1 3/4 3/14 Plan 2006 4/11
5.3Relevant Central Government Guidance, Supplementary Planning Documents and Material Considerations
Central National Planning Policy Framework March Government 2012 Guidance National Planning Policy Framework – Planning Practice Guidance March 2014
Circular 11/95
Supplementary Sustainable Design and Construction (May Planning 2007) Guidance
Material City Wide Guidance Considerations Roof Extensions Design Guide (2003)
Area Guidelines
Mill Road Area Conservation Area Appraisal (2011)
5.4Status of Proposed Submission – Cambridge Local Plan
Planning applications should be determined in accordance with policies in the adopted Development Plan and advice set out in the NPPF. However, after consideration of adopted plans and the NPPF, policies in emerging plans can also be given some weight when determining applications. For Cambridge, therefore, the emerging revised Local Plan as published for consultation on 19 July 2013 can be taken into account, especially those policies where there are no or limited objections to it. However it is likely, in the vast majority of instances, that the adopted development plan and the NPPF will have considerably more weight than emerging policies in the revised Local Plan.
For the application considered in this report, there are no policies in the emerging Local Plan are of relevance.
6.0CONSULTATIONS
Cambridgeshire County Council (Engineering)
6.1No comment on this application.
Urban Design and Conservation team
6.2The application is not supported. The dormer is nearly full width and height and therefore the extension reads as a third storey extension rather than a subservient roof extension. 6.3 The above responses are a summary of the comments that have been received. Full details of the consultation responses can be inspected on the application file.
The above responses are a summary of the comments that have been received. Full details of the consultation responses can be inspected on the application file.
7.0REPRESENTATIONS
7.1Cllr Smart has requested this application be determined at Planning Committee due to the conflicting advice of officers and what is visible from the public realm and the impact on the appearance in a Conservation Area needs further discussion.
7.2The owners/occupiers of the following addresses have made representations:
27 Ferry Path
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.