Decision To agree to support further investigation of the options for improving the existing toilets as laid out in Officer’s report. Decision of the Executive Councillor for Environment & Waste. i. Agreed to support the recommendations for further investigation of the options for improving the existing toilets as laid out in the Officer’s report. Reason for the Decision As set out in the Officer’s report. Any Alterative Options Considered and Rejected Not applicable. Scrutiny Considerations The Committee received a report from the Senior Engineer, Streets and Open Spaces which referred to investigation work undertaken to date on improving the existing City Council provided public toilets located beneath the Silver Street river bridge approach. The report proposed that further work should be undertaken on four options in order to inform further consideration, and discussions with planning, conservation and heritage interests. Draft architectural drawings of the suggested proposals were handed round for the Committee’s information. In response to the Committee’s comments the Project Engineer and Senior Engineer, Streets and Open Spaces noted the Committee’s agreement that option 4 should not be further investigated. This related to the proposal of providing new remote provision on Queens Green. i. The Committee resolved unanimously to endorse further investigation of the options for improving the existing toilets as laid out in the Officer’s report. The Executive Councillor approved the amended recommendations. Conflicts of Interest Declared by the Executive Councillor and (and any Dispensations Granted) No conflicts of interest were declared by the Executive Councillor.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
1.1This report details investigation work undertaken to date on improving the existing City Council provided public toilets located beneath the Silver Street river bridge approach. It proposes that further work be undertaken on four options in order to inform further consideration, and discussions with planning, conservation and heritage interests.
Recommendations
2.1The Executive Councillor is asked to support further investigation of the options for improving the existing toilets as laid out in this report.
Background
3.1The existing public toilet facilities provided and operated by Cambridge City Council in Silver Street date from 1985. Separate segregated facilities for males and females are located underground within the river bridge approach (accessed via stairs), with one separate mobility impaired cubicle provided at street level (timber clad design, beneath a pitched and tiled roof).
3.2These facilities are located close to the drop off point for coach borne visitors to Cambridge on Queens Road, and are heavily used by tens of thousands of people each year. They are comparatively poor by current standards and are the source of regular complaints; particularly during the summer months, and give a poor first impression of what Cambridge has to offer visitors. The frequency and pattern of visitor arrivals is such that the facilities struggle to cope with demand at peak times, leading to lengthy queues and inconvenience to users. Report Page No: 1 3.3 The Council has supported the improvement of the existing facilities in Silver Street following the successful refurbishment in 2014 of similar conveniences located within the Lion Yard complex in the city centre. Up to £437,000 is potentially available towards their improvement, funded from the Public Conveniences Programme, UD016.
3.4Being largely located beneath the street at river level the existing facilities suffer from poor, and congested, access and the ingress of water both from above, and below as ground and river levels increase. Such events are becoming increasingly regular and result in the temporary closure of the toilets. Maintaining, and operating, the current facilities cost the City Council in excess of £70,000 per annum.
4. Investigation work undertaken
4.1In 2013 the Council undertook a scoping exercise into the improvement of the toilets and recommended that the existing disabled toilet, which forms a part of the Silver Street provision, be removed and the underground facilities made redundant - with a new lightweight toilet provision constructed at ground level on the same site, and collecting a 20p charge for individual usage. An alternative of providing a lift to the below ground facilities was considered, but discounted on the basis of impracticality.
4.2A more detailed structural, mechanical and electrical feasibility study conducted by consultants Faithful & Gould in 2013 further recommended the building of a new toilet above ground due to surcharge flooding from the foul water sewer system, poor access provisions, and no guarantee that the existing waterproof membrane would continue retain its integrity; leading to increased management costs.
4.3The bridge, designed by the renowned national architect Edward Lutjens in1932 and built in 1958-59 after his death, is a reinforced concrete structure clad in Portland stone, and became Grade II listed in 2013. Any alteration to the form or fabric of the bridge structure, and its associated infrastructure, is expected to require planning approval and Listed Building Consent. The western pavement approach where the current facilities are accessed does not fall within the curtilage of the listing.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Shared Waste 2018/19 Business PlanDecision of Executive Councillor for Waste Services and City Centre. i. Approved the 2018/19 Shared Waste business Pl...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.