Resolved (by 7 votes to 0) to grant the application for planning permission in accordance with the officer recommendation, for the reasons set out in the officer report, and subject to the conditions recommended by the officers. Councillor Sarris withdrew from the meeting for this item and did not participate in the discussion or decision making.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Application 17/1864/FUL Agenda Number Item Date Received 27th October 2017 Officer Mairead O'Sullivan Target Date 22nd December 2017 Ward Market Site Scudamores Boat Yard Mill Lane Cambridge Proposal Replacement of ticket office and pontoons. Applicant c/o Agent
SUMMARY The development accords with the Development Plan for the following reasons:
- The proposal is considered acceptable in terms of design and would preserve and enhance the character and appearance of the conservation area. - The proposal would improve access to the river
RECOMMENDATION APPROVAL
1.0SITE DESCRIPTION/AREA CONTEXT
1.1The application site is located to the south of Mill Lane. It incorporates a strip of land which runs parallel to Laundress Lane, Mill Bridge and part of Laundress Green. Laundress Green is Common Land which is owned by the City Council. The site is highly visible from the Silver Street Bridge. Laundress Green is allocated as Protected Open Space (NAT 06 – Sheep’s Green and Coe Fen – Semi-natural green space). The site falls within the Central Conservation Area and is covered by both the Historic Core Conservation Area Appraisal and Sheep’s Green/Coe Fen Conservation Plan. The site includes the Mill Bridge; a grade II listed structure.
1.2The site also falls within the Green Belt and Flood Zones 2 & 3. The River Cam is a designated Wildlife Site 2.0 THE PROPOSAL
2.1The application seeks full planning permission for replacement pontoons and ticket offices.
2.2The proposal includes a new layout and extension to the area covered by pontoons. Currently one pontoon extends vertically from the walkway. This is to be removed and pontoons are to be incorporated following the line of the land. The pontoons are to extend past the bridge adjacent to the northern part of Laundress Green.
2.3The existing ticket office is to be removed and replaced with a new building on a similar footprint to existing. The ticket office building would be finished in timber cladding with a signage area shown and roller shutters which could be drawn when closed.
2.4The element of the pontoons which extends beyond the bridge with access from Laundress Green incorporates a ramp and is to be used by less able customers. A hoist is also located on this element of the pontoons.
2.5The application as submitted includes:
- Plans - Design and Access Statement - Heritage Statement - Ecology report - Flood Risk Assessment - Context document - Health and Safety document - Frequently asked questions
5.1See Appendix 1 for full details of Central Government Guidance, Cambridge Local Plan 2006 policies, Supplementary Planning Documents and Material Considerations.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.