Resolved (by 6 votes to 0) to defer the application to seek further information regarding: i. Review of the licensing process including hours of operation and regulation of these. ii. The number of punts in operation. iii. Proposed scissor lift. iv. Condition information. v. History of environmental health enforcement in the area. vi. Punt queueing arrangements. vii. Consultation with Conservators of the River Cam. viii. Public toilet provision, including accessible facilities.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Application 20/0034/FUL Agenda Number Item Date Received 13th January 2020 Officer Mary Collins Target Date 25th March 2020 Ward Market Site Jesus Green Moorings Thompsons Lane Cambridge Cambridgeshire Proposal Extension of existing pontoon Applicant [name removed] Lukes Church Stretten Avenue Cambridge Cambridgeshire CB4 3DZ
SUMMARY The development accords with the Development Plan for the following reasons:
The proposed development would respect the character and appearance of the conservation area.
The proposed development would not have any significant adverse impact on the amenity of surrounding occupiers.
The proposal would respect the River Cam.
RECOMMENDATION APPROVAL
1.0SITE DESCRIPTION/AREA CONTEXT
1.1The application site is situated on the southern side of the River Cam. The punt station itself is at the end of the boardwalk from Quayside, immediately before the access gate to Jesus Green and immediately in front of La Mimosa restaurant at 1-3 Thompsons Lane
1.2The punt station is approximately midway between Magdalene or Great Bridge upstream and the Jesus Lock and footbridge downstream. La Mimosa is one of six authorised punting stations in Cambridge.
1.3The existing pontoons are in two sections each accessed through a metal gate and a short set of steps at the side of the boardwalk.
1.4The application site is within the Historic Core Conservation Area. The site falls within Flood Zone 2. The site falls within a County Wildlife Site (River Cam).
2.0THE PROPOSAL
2.1Planning permission is sought for the extension of the existing pontoon to provide a larger pontoon.
2.2The existing pontoon would be extended widthways by 2.5 metres adjacent to the existing landing stages. It would provide separate entrances and exits from the footpath/bank and would provide a scissor lift for ambulant access. It would be securely connected to tubular piles driven into the bed of the river and is a modular system which is designed to float.
2.3The application is accompanied by the following supporting information:
5.1See Appendix 1 for full details of Central Government Guidance, Cambridge Local Plan 2018 policies, Supplementary Planning Documents and Material Considerations.
5.2Relevant Development Plan policies
PLAN POLICY NUMBER
Cambridge Local 1 7 10 Plan 2018 28 31 32 35 36
55 56 57 59 61 62 67 69 70 73
81 82
5.3Relevant Central Government Guidance, Supplementary Planning Documents and Material Considerations
Central National Planning Policy Framework 2019 Government National Planning Practice Guidance 2014 Guidance Circular 11/95 – The Use of Conditions in Planning Permissions (Annex A) Greater Cambridge Planning (2020) – Sustainable Design and Construction Biodiversity Checklist for Land Use Planners in Cambridgeshire and Peterborough (March 2001). Cambridge and South Cambridgeshire Strategic Flood Risk Assessment (November 2010) Strategic Flood Risk Assessment (2005) Cambridge and Milton Surface Water Management Plan (2011) Cambridge Historic Core Conservation Area Appraisal (2015) 6.0 CONSULTATIONS
Cambridgeshire County Council (Highways Development Control)
6.1No significant adverse effect upon the Public Highway should result from this proposal, should it gain benefit of Planning Permission.
Urban Design and Conservation team
6.2The main point of concern is the visual impact of the larger pontoons on the Conservation Area and the River Cam. Historically this part of the river has been more ‘industrialised’ than it seems now but the existing situation is that the views across the river, up and downstream are very important and relatively uncluttered. Objects in or on the river form the foreground of many of these views, which also form the setting for LBs & BLIs.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.