Resolved
RESOLVED - (1) Fishermen’s huts: Works are carried out to generally improve the quay drainage layout in the immediate vicinity of the Fishermen’s huts. This would require the installation of a combined rainwater and wastewater longitudinal surface drain with an associated small submersible pump chamber in front of the fishermen’s huts. The estimated cost of the work is £13,500. The cost to be charged to the harbour General Reserve. (2) Cardium Shellfish: The current overflow channel with a gravity outfall through the harbour sheet pile wall is capped to prevent any inadvertent discharge of processed food wastewater being deposited in the Harbour. Modifications are carried out to their existing wastewater collection system and facilities within the building, in order that it is fully compliant with procedure approved by the Estates Dept. and Southern Water for the disposal of wastewater from the cockling operation. Cardium Shellfish are held responsible for implementing the adaptations to their processing plant in accordance with the terms of their Lease. These works are completed to the approval of the Harbourmaster prior to commencement of their next cooking season in Spring 2013. The estimated cost of these works is £5,500
Word for word from the decision Canterbury published for this meeting.
Source: democracy.canterbury.gov.uk