(a) The complete replacement of this section of quay wall, to be completed by February 2016. Estimated cost of works circa £450 to £550,000 dependent on final design if improved embarkation facilities are included. (b) To carry out further consultation with harbour users and officers to assess benefits of improved embarkation facilities. This will then be followed by detailed design, application for marine licences and preparation of Contract documentation. (c) To convene the Embarkation Task and Finish group as agreed at the WHB meeting on 22 November 2013 to help develop plans as laid out in (b) and make recommendations back to the board in the future. (d) To commission a feasibility study into the quay wall replacement works required. RECOMMENDED (to Full Council ) that the quay wall replacement programme be included on the capital works programme for years 2014/15 and 2015/16.
Word for word from the decision Canterbury published for this meeting.Source: democracy.canterbury.gov.uk
Subject: Section 4 South Quay Reconstruction of Quay wall
Director/Head of Service: Planning and Regeneration
Decision Issues: These are within the authority of the Council
Decision: Key
Ward: Harbour
Summary: This report provides the Board with an update of the structural condition of the sheet pile quay wall following a corrosion survey carried out in May 2014.
To Resolve: a) The complete replacement of this section of quay wall, commencing October 2015 for work to be completed by February 2016. Estimated cost of works circa £450 to £550,000 dependent on final design if improved embarkation facilities are included. b) To carry out further consultation with harbour users and officers to assess benefits of improved embarkation facilities. This will then be followed by detailed design, application for marine licences and preparation of Contract documentation. c) To convene the Embarkation Task and Finish group as agreed at the WHB meeting on 22 November 2013 to help develop plans as laid out in b) and make recommendations back to the board in the future. d) To commission a feasibility study into the quay wall replacement works required. e) To recommend to the Council that the quay wall replacement programme be included on the capital works programme 2015/16
Classification: This report is open to the public SUPPORTING INFORMATION
1. Introduction
The purpose of this report is to update the Board on the current structural condition of Section 4 of the South Quay wall following a corrosion survey in May 2014, and recommendations for its replacement which will incorporate improved vessel embarkation facilities
Location Plan
Background The sheet pile retaining wall supporting the quay detailed as Section 4 of the South quay was constructed in 1958 and is the oldest quay wall within the Harbour basin. Following recent corrosion surveys, it is now considered to be at the end of its effective service life and will require replacement in the near future.
Section 4 South Quay Asset Management
Detailed condition appraisals through corrosion surveys have been carried out on all the quay walls regularly since 2006, with the most recent in May 2014. The purpose is to monitor corrosion of the steel sheet pile structures to maintain the overall integrity of the quays. However due to its age and general deterioration, Section 4 has been monitored more closely. Corrosion surveys are carried out using non-destructive testing techniques with ultrasound equipment to establish the residual thickness of steel remaining following corrosion. This is then assessed against documented general corrosion rates and established data for steel corrosion in a marine environment for UK waters. Readings are taken in known corrosion zones to establish a corrosion profile, thereby enabling the prediction of life expectancy of the maritime structure. UK ports are reporting a presence of a form of accelerated corrosion in steel sheet piles commonly known as Microbiologically Induced Corrosion (MIC), and the surveys at Whitstable have included inspections for any presence of MIC. Examination of areas close to the seabed dredged level on this section of quay has revealed certain areas are suffering from accelerated corrosion levels which have, and will continue to, rapidly advance the deterioration of a steel sheet pile retaining wall.
MIC characterized by a bright orange colour on the surface, underlain by black sludge and a surface of steel on the sheet pile. (2006 report)
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Election of a Chair for 2026/27RESOLVED that: Councillor Chris Cornell be Chair for 2026/2027. A recorded vote was taken as follows: For (7): Counci...
Annual Harbour Outturn Report 25/26RESOLVED that: The report was NOTED. A recorded vote was taken as follows: For: (8) Councillors Chris Cornell, Dixey,...
Exclusion of the press and publicRESOLVED by general assent that under Section 100(A)(4) of the Local Government Act 1972, the press and public be exc...
Exclusion of the press and publicRESOLVED by general assent that under Section 100(A)(4) of the Local Government Act 1972, the press and public be exc...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.