Resolved
RESOLVED that the following planning application be granted in relation to the discharge of conditions 10, 13, 15 and 16, subject to the conditions detailed within the Head of Planning’s Report, but that determination of condition 26 be deferred to enable further discussions to be undertaken with the applicant with regard to reducing the time frame in which complaints relating to television reception interference were addressed:- W/32909 Discharge of conditions 10 (aviation lighting) 13 (landscape design scheme) 15/16 (badgers/reptiles) 26 ( tv reception) of W/31099 at Land at Wern , Pencader , SA39 9AL Representations were received objecting to the application re-iterating the points detailed within the Head of Planning’s report and included the following:- · There were a number of shortcomings with the conditions. It was considered the development of a large turbine in a small field failed the guidelines on bat protection by 50%, and the topple height safety distance from the road and adjacent property as recommended by the British Horse Society and the Council’s own recommended distance from the three nearest dwellings, · The developer had adopted a wait and see attitude to potential problems from the turbine in relation to television interference, shadow flicker and ice throw rather than implement remedial measures at the outset, · Local residents had complained about the current, and previous development for over three years. It was believed the proposals would cause a risk to, and impact on, the amenity of local residents and the public The residents could now only hope for thorough enforcement of the conditions · Residents had previously objected to the development when there were no details relating to badgers, reptiles and television reception. Those details had subsequently been added to the application · The previous landscape details had been replaced showing the removal of further hedgerows and the provision of a hard standing for a crane · An adjacent ditch was to be culverted with 30cm plastic pipe increasing the risk of flooding to the highway and local properties. Had the Head of Transport and Engineering approved the proposals and future maintenance requirements? · No survey had been undertaken prior to the cutting of tree branches along the delivery route on the potential impact on bats and bat nesting boxes, · It was considered the impact of the proposed navigation light to be erected on the turbine on local residents and aircraft should be fully assessed prior to the discharge of the condition, · It was considered the process for the remediation of possible television interference from the turbine, which could take up to 3 months, was too long and would adversely impact on local residents and the tourist industry. It was considered any mitigation measures should be installed prior to the turbine’s erection The applicant, in response to the representations, advised that he had liaised with the Council departments and statutory consultees and provided all the requested information and documentation in relation to the discharge application and they had not raised any objections. The Development Management Officer responded to the issues raised. ... view the full minutes text for item 4.