CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Mar24Friday

Governance & Audit Committee

Friday 24 March 2017, 10.00amHeld 3533 days ago.
Chamber & Ante Room3 Spilman Street, Carmarthen, SA31 1LE. Open to the public.
17 items, 39 papersAbout 15 MB, led by AMENDMENTS TO CONTRACT PROCEDURE RULES.
No exempt items listedEvery item is due to be heard in public.
This meeting was held24 March 2017
17items
39papers
14decisions
–exempt
Running order, sized by papersItem 1 to 11
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. AMENDMENTS TO CONTRACT PROCEDURE RULES is the main business.

1
Procedure

APOLOGIES AND OTHER MATTERS

2
Procedure

DECLARATIONS OF PERSONAL INTERESTS.

3
Report

INTERNAL AUDIT PLAN UPDATE 2016/17

Decision: RESOLVED 3.1 that , for monitoring purposes, the 2016/17 Internal Audit Plan update be received; 3.2 that the Committee receive an update at the next meeting on the new staffing structure following the retirement of the Head of Audit, Risk & Procurement and the procurement joint working arrangements; 3.3 that the Committee receive a progress report on the Museums Action Plan at the September meeting; Decision page

ReportINTERNAL AUDIT PLAN UPDATE 2016/17172 KBCopy on its way
ReportReport A(i)350 KBCopy on its way
ReportReport A(ii)114 KBCopy on its way
ReportReport C251 KBCopy on its way
AppendixReport C Appendix121 KBCopy on its way
4
Report

INTERNAL AUDIT PLAN 2017/18 & PLANNED COVERAGE FOR 2018/20

Decision: RESOLVED 4.1 that the Annual Internal Audit Plan for 2017/18 be approved; 4.2 that the planned coverage for 2018/20 be confirmed. Decision page

3 papers, 524 KBSearch inside with Pro
ReportINTERNAL AUDIT PLAN 2017/18 & PLANNED COVERAGE FOR 2018/20144 KBCopy on its way
ReportReport A128 KBCopy on its way
ReportReport B252 KBCopy on its way
5
Report

AUDIT COMMITTEE FORWARD WORK PROGRAMME

Decision: RESOLVED that the report be received. Decision page

2 papers, 558 KBSearch inside with Pro
ReportAUDIT COMMITTEE FORWARD WORK PROGRAMME151 KBCopy on its way
ReportReport407 KBCopy on its way
6
Report

COASTAL FACILITIES ACTION PLAN UPDATE

Decision: RESOLVED that progress on the Coastal Facilities Action Plan be noted. Decision page

2 papers, 334 KBSearch inside with Pro
ReportCOASTAL FACILITIES ACTION PLAN UPDATE149 KBCopy on its way
ReportReport185 KBCopy on its way
7
ReportMain business

AMENDMENTS TO CONTRACT PROCEDURE RULES

Decision: RESOLVED that the amendments to the Contract Procedure Rules, as detailed in the report, be approved. Decision page

3 papers, 1.5 MBSearch inside with Pro
ReportAMENDMENTS TO CONTRACT PROCEDURE RULES128 KBCopy on its way
ReportContract Procedure Rules: Amendments March 20171 MBCopy on its way
ReportRationale for amended wording to CPR's March 2017325 KBCopy on its way
8
Report

CORPORATE RISK REGISTER

Decision: RESOLVED 8.1 that the report be received; 8.2 that a session on Risk Management be included in any forthcoming training programmes. Decision page

3 papers, 353 KBSearch inside with Pro
ReportCORPORATE RISK REGISTER157 KBCopy on its way
ReportCorporate Risk Register111 KBCopy on its way
ReportScoring Matrix85 KBCopy on its way
9
Procedure

WALES AUDIT OFFICE REPORTS

9.1
Report

CARMARTHENSHIRE COUNTY COUNCIL AUDIT COMMITTEE UPDATE - MARCH 2017

Decision: RESOLVED that the report be received. Decision page

2 papers, 312 KBSearch inside with Pro
ReportCARMARTHENSHIRE COUNTY COUNCIL AUDIT COMMITTEE UPDATE: MARCH 2017153 KBCopy on its way
ReportReport159 KBCopy on its way
9.2
Report

CERTIFICATION OF GRANTS AND RETURNS - CARMARTHENSHIRE COUNTY COUNCIL 2015-16

Decision: RESOLVED that the report be received. Decision page

2 papers, 333 KBSearch inside with Pro
ReportCERTIFICATION OF GRANTS AND RETURNS: CARMARTHENSHIRE COUNTY COUNCIL 2015-16145 KBCopy on its way
ReportReport188 KBCopy on its way
9.3
Report

2017 AUDIT PLAN - CARMARTHENSHIRE COUNTY COUNCIL

Decision: RESOLVED that the 2017 Audit Plan for Carmarthenshire County Council be received. Decision page

2 papers, 501 KBSearch inside with Pro
Report2017 AUDIT PLAN: CARMARTHENSHIRE COUNTY COUNCIL145 KBCopy on its way
ReportReport356 KBCopy on its way
9.4
Report

2017 AUDIT PLAN - DYFED PENSION FUND

Decision: RESOLVED that the 2017 Audit Plan for the Dyfed Pension Fund be received. Decision page

2 papers, 393 KBSearch inside with Pro
Report2017 AUDIT PLAN: DYFED PENSION FUND145 KBCopy on its way
ReportReport248 KBCopy on its way
9.5
Report

STATEMENT OF RESPONSIBILITIES

Decision: RESOLVED that the report be received. Decision page

3 papers, 393 KBSearch inside with Pro
ReportReport A117 KBCopy on its way
ReportReport B154 KBCopy on its way
ReportSTATEMENT OF RESPONSIBILITIES122 KBCopy on its way
9.6
Report

SAVINGS PLANNING - CARMARTHENSHIRE COUNTY COUNCIL

Decision: RESOLVED that the report be received. Decision page

2 papers, 353 KBSearch inside with Pro
ReportReport209 KBCopy on its way
ReportSAVINGS PLANNING: CARMARTHENSHIRE COUNTY COUNCIL144 KBCopy on its way
10
Report

MINUTES OF RELEVANT GROUPS TO THE AUDIT COMMITTEE

Decision: RESOLVED that the minutes of the Risk Management Steering Group held on 4 th January, 2017 and the Grants Panel held on 16 th November, 2016 and 20 th January, 2017 be received. Decision page

4 papers, 676 KBSearch inside with Pro
ReportGrants Panel: 16th November 2016177 KBCopy on its way
ReportGrants Panel: 20th January 2017179 KBCopy on its way
ReportMINUTES OF RELEVANT GROUPS TO THE AUDIT COMMITTEE150 KBCopy on its way
ReportRisk Management Steering Group 170104170 KBCopy on its way
11
Report

TO SIGN AS A CORRECT RECORD THE MINUTES OF THE MEETING HELD ON THE 6TH JANUARY 2017

Decision: RESOLVED that, subject to the inclusion of the above-mentioned amendment, the minutes of the Audit Committee held on the 6 th January, 2017 be signed as a correct record. Decision page

1 paper, 265 KBSearch inside with Pro
ReportTO SIGN AS A CORRECT RECORD THE MINUTES OF THE MEETING HELD ON THE 6TH JANUARY 2017265 KBCopy on its way
Read inside all 39 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

The main business: AMENDMENTS TO CONTRACT PROCEDURE RULES

Item 7 is where most of this meeting's papers sit: 3 papers, about 1.5 MB.

Item 7

AMENDMENTS TO CONTRACT PROCEDURE RULES

What is in the pack3 papers, about 1.5 MB
Report
AMENDMENTS TO CONTRACT PROCEDURE RULESThe report to the committee
128 KB
Report
Contract Procedure Rules: Amendments March 2017The report to the committee
1 MB
Report
Rationale for amended wording to CPR's March 2017The report to the committee
325 KB
Read and search every page of this itemPro opens all 3 papers, and keeps them if the council removes them.
Get ProCopy on its way

How this item got here

This committee has dealt with the subject before.

30 September 2016REVISED CONTRACT PROCEDURE RULES
24 March 2017AMENDMENTS TO CONTRACT PROCEDURE RULESThis meeting.

Every paper for this meeting

All 39 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Agenda frontsheetItem
294 KB
Copy queued
Copy on its wayRead here
Agenda reports packItem
7 MB
Copy queued
Copy on its wayRead here
Printed minutesItem
215 KB
Copy queued
Copy on its wayRead here
INTERNAL AUDIT PLAN UPDATE 2016/17Item 3, INTERNAL AUDIT PLAN UPDATE 2016/17
172 KB
Copy queued
Copy on its wayRead here
Report A(i)Item 3, INTERNAL AUDIT PLAN UPDATE 2016/17
350 KB
Copy queued
Copy on its wayRead here
Report A(ii)Item 3, INTERNAL AUDIT PLAN UPDATE 2016/17
114 KB
Copy queued
Copy on its wayRead here
Report CItem 3, INTERNAL AUDIT PLAN UPDATE 2016/17
251 KB
Copy queued
Copy on its wayRead here
Report C AppendixItem 3, INTERNAL AUDIT PLAN UPDATE 2016/17
121 KB
Copy queued
Copy on its wayRead here
INTERNAL AUDIT PLAN 2017/18 & PLANNED COVERAGE FOR 2018/20Item 4, INTERNAL AUDIT PLAN 2017/18 & PLANNED COVERAGE FOR 2018/20
144 KB
Copy queued
Copy on its wayRead here
Report AItem 4, INTERNAL AUDIT PLAN 2017/18 & PLANNED COVERAGE FOR 2018/20
128 KB
Copy queued
Copy on its wayRead here
Report BItem 4, INTERNAL AUDIT PLAN 2017/18 & PLANNED COVERAGE FOR 2018/20
252 KB
Copy queued
Copy on its wayRead here
AUDIT COMMITTEE FORWARD WORK PROGRAMMEItem 5, AUDIT COMMITTEE FORWARD WORK PROGRAMME
151 KB
Copy queued
Copy on its wayRead here
ReportItem 5, AUDIT COMMITTEE FORWARD WORK PROGRAMME
407 KB
Copy queued
Copy on its wayRead here
COASTAL FACILITIES ACTION PLAN UPDATEItem 6, COASTAL FACILITIES ACTION PLAN UPDATE
149 KB
Copy queued
Copy on its wayRead here
ReportItem 6, COASTAL FACILITIES ACTION PLAN UPDATE
185 KB
Copy queued
Copy on its wayRead here
AMENDMENTS TO CONTRACT PROCEDURE RULESItem 7, AMENDMENTS TO CONTRACT PROCEDURE RULES
128 KB
Copy queued
Copy on its wayRead here
Contract Procedure Rules: Amendments March 2017Item 7, AMENDMENTS TO CONTRACT PROCEDURE RULES
1 MB
Copy queued
Copy on its wayRead here
Rationale for amended wording to CPR's March 2017Item 7, AMENDMENTS TO CONTRACT PROCEDURE RULES
325 KB
Copy queued
Copy on its wayRead here
CORPORATE RISK REGISTERItem 8, CORPORATE RISK REGISTER
157 KB
Copy queued
Copy on its wayRead here
Corporate Risk RegisterItem 8, CORPORATE RISK REGISTER
111 KB
Copy queued
Copy on its wayRead here
Scoring MatrixItem 8, CORPORATE RISK REGISTER
85 KB
Copy queued
Copy on its wayRead here
CARMARTHENSHIRE COUNTY COUNCIL AUDIT COMMITTEE UPDATE: MARCH 2017Item 9.1, CARMARTHENSHIRE COUNTY COUNCIL AUDIT COMMITTEE UPDATE - MARCH 2017
153 KB
Copy queued
Copy on its wayRead here
ReportItem 9.1, CARMARTHENSHIRE COUNTY COUNCIL AUDIT COMMITTEE UPDATE - MARCH 2017
159 KB
Copy queued
Copy on its wayRead here
CERTIFICATION OF GRANTS AND RETURNS: CARMARTHENSHIRE COUNTY COUNCIL 2015-16Item 9.2, CERTIFICATION OF GRANTS AND RETURNS - CARMARTHENSHIRE COUNTY COUNCIL 2015-16
145 KB
Copy queued
Copy on its wayRead here
ReportItem 9.2, CERTIFICATION OF GRANTS AND RETURNS - CARMARTHENSHIRE COUNTY COUNCIL 2015-16
188 KB
Copy queued
Copy on its wayRead here
2017 AUDIT PLAN: CARMARTHENSHIRE COUNTY COUNCILItem 9.3, 2017 AUDIT PLAN - CARMARTHENSHIRE COUNTY COUNCIL
145 KB
Copy queued
Copy on its wayRead here
ReportItem 9.3, 2017 AUDIT PLAN - CARMARTHENSHIRE COUNTY COUNCIL
356 KB
Copy queued
Copy on its wayRead here
2017 AUDIT PLAN: DYFED PENSION FUNDItem 9.4, 2017 AUDIT PLAN - DYFED PENSION FUND
145 KB
Copy queued
Copy on its wayRead here
ReportItem 9.4, 2017 AUDIT PLAN - DYFED PENSION FUND
248 KB
Copy queued
Copy on its wayRead here
Report AItem 9.5, STATEMENT OF RESPONSIBILITIES
117 KB
Copy queued
Copy on its wayRead here
Report BItem 9.5, STATEMENT OF RESPONSIBILITIES
154 KB
Copy queued
Copy on its wayRead here
STATEMENT OF RESPONSIBILITIESItem 9.5, STATEMENT OF RESPONSIBILITIES
122 KB
Copy queued
Copy on its wayRead here
ReportItem 9.6, SAVINGS PLANNING - CARMARTHENSHIRE COUNTY COUNCIL
209 KB
Copy queued
Copy on its wayRead here
SAVINGS PLANNING: CARMARTHENSHIRE COUNTY COUNCILItem 9.6, SAVINGS PLANNING - CARMARTHENSHIRE COUNTY COUNCIL
144 KB
Copy queued
Copy on its wayRead here
Grants Panel: 16th November 2016Item 10, MINUTES OF RELEVANT GROUPS TO THE AUDIT COMMITTEE
177 KB
Copy queued
Copy on its wayRead here
Grants Panel: 20th January 2017Item 10, MINUTES OF RELEVANT GROUPS TO THE AUDIT COMMITTEE
179 KB
Copy queued
Copy on its wayRead here
MINUTES OF RELEVANT GROUPS TO THE AUDIT COMMITTEEItem 10, MINUTES OF RELEVANT GROUPS TO THE AUDIT COMMITTEE
150 KB
Copy queued
Copy on its wayRead here
Risk Management Steering Group 170104Item 10, MINUTES OF RELEVANT GROUPS TO THE AUDIT COMMITTEE
170 KB
Copy queued
Copy on its wayRead here
TO SIGN AS A CORRECT RECORD THE MINUTES OF THE MEETING HELD ON THE 6TH JANUARY 2017Item 11, TO SIGN AS A CORRECT RECORD THE MINUTES OF THE MEETING HELD ON THE 6TH JANUARY 2017
265 KB
Copy queued
Copy on its wayRead here

Last time, and what carried over

The committee last met on 6 January 2017. 9 of its items lead into this meeting; 3 items are new. Point at any item to follow a thread. Procedural items are left out.

Jan6
6 January 201715 items, 26 papers
Held
carried over
Mar24
24 March 201717 items, 39 papers
Held
3
INTERNAL AUDIT PLAN 2016/17 UPDATE
4
AUDIT COMMITTEE FORWARD WORK PROGRAMME 2016/17
5
COASTAL FACILITIES ACTION PLAN UPDATE
6
SUPPORTING PEOPLE UPDATE
7.1
WALES AUDIT OFFICE UPDATE TO CARMARTHENSHIRE COUNTY COUNCIL'S AUDIT COMMITTEE - DECEMBER 2016
7.2
CARMARTHENSHIRE COUNTY COUNCIL'S ANNUAL AUDIT LETTER 2015/16
7.3
CARMARTHENSHIRE COUNTY COUNCIL - AGREED ACTIONS ARISING FROM THE 2015/16 AUDIT
7.4
JOINT PROTOCOL FOR THE CERTIFICATION OF GRANT CLAIMS AND RETURNS
7.5
BRIEFING NOTE ON PROPOSALS FOR IMPROVEMENT - FOLLOW UP WORK AS AT DECEMBER 2016
7.6
WALES AUDIT OFFICE LOCAL GOVERNMENT STUDY: CHARGING FOR SERVICES AND GENERATING INCOME BY LOCAL AUTHORITIES
8
MINUTES OF WORKING GROUPS RELEVANT TO THE AUDIT COMMITTEE
9
TO SIGN AS A CORRECT RECORD THE MINUTES OF THE AUDIT COMMITTEE MEETING HELD ON 30TH SEPTEMBER 2016
3
INTERNAL AUDIT PLAN UPDATE 2016/17
4
INTERNAL AUDIT PLAN 2017/18 & PLANNED COVERAGE FOR 2018/20
5
AUDIT COMMITTEE FORWARD WORK PROGRAMME
6
COASTAL FACILITIES ACTION PLAN UPDATE
7
AMENDMENTS TO CONTRACT PROCEDURE RULESNew this time
8
CORPORATE RISK REGISTERNew this time
9.1
CARMARTHENSHIRE COUNTY COUNCIL AUDIT COMMITTEE UPDATE - MARCH 2017
9.2
CERTIFICATION OF GRANTS AND RETURNS - CARMARTHENSHIRE COUNTY COUNCIL 2015-16
9.3
2017 AUDIT PLAN - CARMARTHENSHIRE COUNTY COUNCIL
9.4
2017 AUDIT PLAN - DYFED PENSION FUND
9.5
STATEMENT OF RESPONSIBILITIESNew this time
9.6
SAVINGS PLANNING - CARMARTHENSHIRE COUNTY COUNCIL
10
MINUTES OF RELEVANT GROUPS TO THE AUDIT COMMITTEE
11
TO SIGN AS A CORRECT RECORD THE MINUTES OF THE MEETING HELD ON THE 6TH JANUARY 2017

The threads

  • INTERNAL AUDIT PLAN 2016/17 UPDATE leads to item 3, INTERNAL AUDIT PLAN UPDATE 2016/17
  • INTERNAL AUDIT PLAN 2016/17 UPDATE leads to item 4, INTERNAL AUDIT PLAN 2017/18 & PLANNED COVERAGE FOR 2018/20
  • INTERNAL AUDIT PLAN 2016/17 UPDATE leads to item 9.3, 2017 AUDIT PLAN - CARMARTHENSHIRE COUNTY COUNCIL
  • INTERNAL AUDIT PLAN 2016/17 UPDATE leads to item 9.4, 2017 AUDIT PLAN - DYFED PENSION FUND
  • AUDIT COMMITTEE FORWARD WORK PROGRAMME 2016/17 leads to item 5, AUDIT COMMITTEE FORWARD WORK PROGRAMME
  • COASTAL FACILITIES ACTION PLAN UPDATE leads to item 6, COASTAL FACILITIES ACTION PLAN UPDATE
  • WALES AUDIT OFFICE UPDATE TO CARMARTHENSHIRE COUNTY COUNCIL'S AUDIT COMMITTEE - DECEMBER 2016 leads to item 3, INTERNAL AUDIT PLAN UPDATE 2016/17
  • WALES AUDIT OFFICE UPDATE TO CARMARTHENSHIRE COUNTY COUNCIL'S AUDIT COMMITTEE - DECEMBER 2016 leads to item 4, INTERNAL AUDIT PLAN 2017/18 & PLANNED COVERAGE FOR 2018/20
  • WALES AUDIT OFFICE UPDATE TO CARMARTHENSHIRE COUNTY COUNCIL'S AUDIT COMMITTEE - DECEMBER 2016 leads to item 5, AUDIT COMMITTEE FORWARD WORK PROGRAMME
  • WALES AUDIT OFFICE UPDATE TO CARMARTHENSHIRE COUNTY COUNCIL'S AUDIT COMMITTEE - DECEMBER 2016 leads to item 9.1, CARMARTHENSHIRE COUNTY COUNCIL AUDIT COMMITTEE UPDATE - MARCH 2017
  • WALES AUDIT OFFICE UPDATE TO CARMARTHENSHIRE COUNTY COUNCIL'S AUDIT COMMITTEE - DECEMBER 2016 leads to item 9.2, CERTIFICATION OF GRANTS AND RETURNS - CARMARTHENSHIRE COUNTY COUNCIL 2015-16
  • WALES AUDIT OFFICE UPDATE TO CARMARTHENSHIRE COUNTY COUNCIL'S AUDIT COMMITTEE - DECEMBER 2016 leads to item 9.3, 2017 AUDIT PLAN - CARMARTHENSHIRE COUNTY COUNCIL
  • WALES AUDIT OFFICE UPDATE TO CARMARTHENSHIRE COUNTY COUNCIL'S AUDIT COMMITTEE - DECEMBER 2016 leads to item 9.4, 2017 AUDIT PLAN - DYFED PENSION FUND
  • WALES AUDIT OFFICE UPDATE TO CARMARTHENSHIRE COUNTY COUNCIL'S AUDIT COMMITTEE - DECEMBER 2016 leads to item 9.6, SAVINGS PLANNING - CARMARTHENSHIRE COUNTY COUNCIL
  • WALES AUDIT OFFICE UPDATE TO CARMARTHENSHIRE COUNTY COUNCIL'S AUDIT COMMITTEE - DECEMBER 2016 leads to item 10, MINUTES OF RELEVANT GROUPS TO THE AUDIT COMMITTEE
  • CARMARTHENSHIRE COUNTY COUNCIL'S ANNUAL AUDIT LETTER 2015/16 leads to item 9.1, CARMARTHENSHIRE COUNTY COUNCIL AUDIT COMMITTEE UPDATE - MARCH 2017
  • CARMARTHENSHIRE COUNTY COUNCIL'S ANNUAL AUDIT LETTER 2015/16 leads to item 9.2, CERTIFICATION OF GRANTS AND RETURNS - CARMARTHENSHIRE COUNTY COUNCIL 2015-16
  • CARMARTHENSHIRE COUNTY COUNCIL'S ANNUAL AUDIT LETTER 2015/16 leads to item 9.3, 2017 AUDIT PLAN - CARMARTHENSHIRE COUNTY COUNCIL
  • CARMARTHENSHIRE COUNTY COUNCIL'S ANNUAL AUDIT LETTER 2015/16 leads to item 9.6, SAVINGS PLANNING - CARMARTHENSHIRE COUNTY COUNCIL
  • CARMARTHENSHIRE COUNTY COUNCIL - AGREED ACTIONS ARISING FROM THE 2015/16 AUDIT leads to item 9.1, CARMARTHENSHIRE COUNTY COUNCIL AUDIT COMMITTEE UPDATE - MARCH 2017
  • CARMARTHENSHIRE COUNTY COUNCIL - AGREED ACTIONS ARISING FROM THE 2015/16 AUDIT leads to item 9.2, CERTIFICATION OF GRANTS AND RETURNS - CARMARTHENSHIRE COUNTY COUNCIL 2015-16
  • CARMARTHENSHIRE COUNTY COUNCIL - AGREED ACTIONS ARISING FROM THE 2015/16 AUDIT leads to item 9.3, 2017 AUDIT PLAN - CARMARTHENSHIRE COUNTY COUNCIL
  • CARMARTHENSHIRE COUNTY COUNCIL - AGREED ACTIONS ARISING FROM THE 2015/16 AUDIT leads to item 9.6, SAVINGS PLANNING - CARMARTHENSHIRE COUNTY COUNCIL
  • JOINT PROTOCOL FOR THE CERTIFICATION OF GRANT CLAIMS AND RETURNS leads to item 9.2, CERTIFICATION OF GRANTS AND RETURNS - CARMARTHENSHIRE COUNTY COUNCIL 2015-16
  • MINUTES OF WORKING GROUPS RELEVANT TO THE AUDIT COMMITTEE leads to item 10, MINUTES OF RELEVANT GROUPS TO THE AUDIT COMMITTEE
  • TO SIGN AS A CORRECT RECORD THE MINUTES OF THE AUDIT COMMITTEE MEETING HELD ON 30TH SEPTEMBER 2016 leads to item 10, MINUTES OF RELEVANT GROUPS TO THE AUDIT COMMITTEE
  • TO SIGN AS A CORRECT RECORD THE MINUTES OF THE AUDIT COMMITTEE MEETING HELD ON 30TH SEPTEMBER 2016 leads to item 11, TO SIGN AS A CORRECT RECORD THE MINUTES OF THE MEETING HELD ON THE 6TH JANUARY 2017

Not carried over

SUPPORTING PEOPLE UPDATE, BRIEFING NOTE ON PROPOSALS FOR IMPROVEMENT - FOLLOW UP WORK AS AT DECEMBER 2016, WALES AUDIT OFFICE LOCAL GOVERNMENT STUDY: CHARGING FOR SERVICES AND GENERATING INCOME BY LOCAL AUTHORITIES do not return this time.

See the 6 January meeting

This committee over time

Every Governance & Audit Committee meeting we have read, the dates it has set for the future, and each time those dates have changed.

59 meetings, 2015 to 2026Dot size shows the number of papers
201520172019202120232025
HeldThis meeting
MeetingItemsPapers
18 Dec 2026Friday
0items
0papers
UpcomingOpen
28 Sep 2026Monday
20items
37papers
HeldOpen
25 Sep 2026Friday
0items
0papers
HeldOpen
24 Jul 2026Friday
5items
0papers
HeldOpen
10 Jul 2026Friday
18items
31papers
HeldOpen
27 May 2026Wednesday
12items
9papers
HeldOpen
6 Mar 2026Friday
20items
33papers
HeldOpen
19 Dec 2025Friday
15items
24papers
HeldOpen
24 Sep 2025Wednesday
0items
0papers
HeldOpen
11 Jul 2025Friday
0items
0papers
HeldOpen
7 Mar 2025Friday
17items
28papers
HeldOpen
20 Dec 2024Friday
17items
37papers
HeldOpen
27 Sep 2024Friday
25items
44papers
HeldOpen
12 Jul 2024Friday
20items
35papers
HeldOpen
8 Mar 2024Friday
16items
31papers
HeldOpen
15 Dec 2023Friday
13items
28papers
HeldOpen
27 Oct 2023Friday
20items
35papers
HeldOpen
29 Sep 2023Friday
14items
17papers
HeldOpen
14 Jul 2023Friday
29items
44papers
HeldOpen
31 Mar 2023Friday
7items
0papers
HeldOpen
17 Mar 2023Friday
17items
32papers
HeldOpen
16 Dec 2022Friday
14items
19papers
HeldOpen
21 Oct 2022Friday
19items
31papers
HeldOpen
30 Sep 2022Friday
15items
33papers
HeldOpen
15 Jul 2022Friday
22items
27papers
HeldOpen
8 Apr 2022Friday
5items
3papers
HeldOpen
25 Mar 2022Friday
0items
0papers
HeldOpen
11 Mar 2022Friday
17items
27papers
HeldOpen
17 Dec 2021Friday
19items
25papers
HeldOpen
12 Oct 2021Tuesday
15items
29papers
HeldOpen
24 Sep 2021Friday
16items
24papers
HeldOpen
16 Jul 2021Friday
21items
34papers
HeldOpen
26 Mar 2021Friday
16items
25papers
HeldOpen
18 Dec 2020Friday
12items
18papers
HeldOpen
16 Oct 2020Friday
14items
23papers
HeldOpen
11 Sep 2020Friday
23items
39papers
HeldOpen
29 Jul 2020Wednesday
22items
34papers
HeldOpen
26 Jun 2020Friday
0items
0papers
HeldOpen
20 Mar 2020Friday
13items
27papers
HeldOpen
24 Jan 2020Friday
15items
29papers
HeldOpen
13 Sep 2019Friday
27items
53papers
HeldOpen
1 Jul 2019Monday
20items
34papers
HeldOpen
28 Jun 2019Friday
0items
0papers
HeldOpen
22 Mar 2019Friday
13items
29papers
HeldOpen
14 Dec 2018Friday
16items
29papers
HeldOpen
28 Sep 2018Friday
27items
51papers
HeldOpen
13 Jul 2018Friday
20items
39papers
HeldOpen
23 Mar 2018Friday
15items
31papers
HeldOpen
15 Dec 2017Friday
13items
26papers
HeldOpen
29 Sep 2017Friday
21items
33papers
HeldOpen
14 Jul 2017Friday
19items
32papers
HeldOpen
24 Mar 2017Friday, this meeting
17items
39papers
6 Jan 2017Friday
15items
26papers
HeldOpen
30 Sep 2016Friday
26items
41papers
HeldOpen
8 Jul 2016Friday
22items
31papers
HeldOpen
16 May 2016Monday
5items
0papers
HeldOpen
22 Mar 2016Tuesday
14items
20papers
HeldOpen
18 Dec 2015Friday
10items
12papers
HeldOpen
30 Sep 2015Wednesday
21items
25papers
HeldOpen

Follow the Governance & Audit Committee

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Carmarthenshire, Governance & Audit Committee

Governance & Audit Committee: 3 kinds of updateCarmarthenshire, sent the same day
PDF
39 papers published for 24 MarchAMENDMENTS TO CONTRACT PROCEDURE RULES and 38 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 24 MarchThe committee's resolutions, the day they are recorded
ABC
"amendments" found in 2 papersAMENDMENTS TO CONTRACT PROCEDURE RULES and Contract Procedure Rules: Amendments March 2017
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Governance & Audit Committee, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies