Carmarthenshire County Council

REVISED LOCAL DEVELOPMENT PLAN (2018 - 2033) MATTERS ARISING CHANGES CONSULTATION

Approved Executive 6 papers

AI summaryCarmarthenshire cabinet member approves Matters Arising Changes to the Revised Local Development Plan 2018-2033 for six weeks of public consultation starting 11 May 2026.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedMACs, ISA and HRA approved
MoneyNot stated
What happens nextPublic consultation6 weeks from 11/05/2026 to 26/06/2026
Who it affectsResidents, developers, planning consulteesAcross Carmarthenshire county

What was decided

The Schedule of Matters Arising Changes to the Revised Local Development Plan 2018-2033 was approved for formal public consultation, alongside the Integrated Sustainability Appraisal and Habitats Regulations Assessment addenda. Report 1.1, 2.1

Officers were given delegated authority to make minor factual, typographical, grammatical or presentational amendments to the consultation documents before publication.

Changes have been agreed with the Inspector conducting the Examination in Public and are needed to demonstrate the plan's soundness. Report 1.1, P7

Why

The MACs arise mainly from Action Points identified at Examination Hearing Sessions held in October and November 2024 and September 2025, and are required to make the plan sound. Report 1.1

The plan proposes 9,814 new homes to meet an identified housing requirement of 8,822, with a 10 percent flexibility allowance, plus a minimum of 71.21ha of allocated employment land. Report P37, P96, 9.11

Changes include new text on Future Wales, Strategic Development Plans, retail hierarchy, development limits, housing supply and habitat protections, plus deletion of the Reserve Sites policy. Report P25, P31, P65, P64, P87

What happens next

The MACs consultation runs for 6 weeks from 11/05/2026 to 26/06/2026 (closing 11.59pm), with representations accepted online, by email to [email protected] or by post to 3 Spilman Street, Carmarthen.

Representations must relate only to the MACs and will be forwarded to the Inspector for consideration when drafting the Examination report. Report 2.3, 2.5

Queries about the Examination should go to the Programme Officer, Corinne Sloley, at [email protected], with general queries to the Strategic Policy and Placemaking team on 01267 228818. Report 2.5

The money

  • 9,814 new homes Total housing supply to meet requirement of 8,822 with 10% flexibility Report P37, P96
  • 71.21ha Minimum allocated employment land Report P37
  • 8,822 Identified housing requirement for the plan period Report P37, P96

Options considered

  • Chosen: Approve MACs for public consultation. Changes are needed to demonstrate plan soundness and have been agreed with the Inspector Report 1.1
  • Rejected: Reject or delay consultation

Implications

  • Legal: MACs are being put to consultation as part of the statutory Examination in Public process for the Revised LDP. Report 1.1, 2.3
  • Legal: Several changes add references to Policy CCH4 to ensure no adverse effect on the integrity of nutrient sensitive protected sites, supporting Habitats Regulations compliance. Report P63, P82, P86, P94, P122, P125
  • Equalities: Strategic Objective SO4 is amended to embed equal opportunities and social inclusion through access to housing, services, healthcare and work. Report P35, P36
  • Financial: Strategic Policy SP1 sets out the scale of housing and employment growth, including 9,814 homes and 71.21ha of employment land. Report P37
  • Other: Policy SG2 (Reserve Sites) is to be deleted, with Pembrey Peninsula policy renumbered to SG2 and other cross references updated. Report P64
  • Other: Sites with elements of flood risk are to be annotated on the proposals map and interactive map (including West Carmarthen, Pentre Awel, Castell Pigyn Road and Golwg Yr Afon). Report P104

Who and where

  • Residents and community groups across Carmarthenshire
  • Developers and landowners with sites allocated or proposed in the plan Report P37, P99, P104
  • Retailers and town centre operators (Carmarthen, Llanelli, Ammanford and other town centres) Report P65, P66, P77
  • Neighbouring authorities in the South West Wales Corporate Joint Committee Report P31, P32
  • The Planning Inspectorate, through the Programme Officer Report 2.5

Timeline

  • October and November 2024: Examination Hearing Sessions took place Report 1.1
  • September 2025: Further Examination Hearing Sessions took place Report 1.1
  • 11/05/2026: MACs consultation opens
  • 26/06/2026 (11.59pm): MACs consultation closes
  • After consultation: Representations forwarded to the Inspector for the Examination report Report 2.5

Plain English for the jargon

  • MACs: Matters Arising Changes: main proposed changes to the Plan arising from Examination Action Points
  • MECs: Minor Editing Changes: typographical, numbering or general editing changes with no policy effect
  • rLDP: Revised Local Development Plan, covering 2018-2033
  • ISA: Integrated Sustainability Appraisal, assessing the plan's social, economic and environmental effects
  • HRA: Habitats Regulations Assessment, screening for effects on protected European sites
  • NGA: National Growth Area, defined in Future Wales: the National Plan 2040
  • SDP: Strategic Development Plan, prepared at regional level by the Corporate Joint Committee
  • CCH4: A plan policy referenced to protect nutrient sensitive protected sites
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item3

Resolved

RESOLVED that:- 3.1 The Matters Arising Changes (MACs) to the Revised LDP be approved for formal public consultation. 3.2 The Integrated Sustainability Appraisal ( ISA) and Habitats Regulations Assessment (HRA) documents be approved for consultation alongside the MACs. 3.3 Delegated authority be granted to officers to make minor factual, typographical, grammatical or presentational amendments to consultation documents prior to publication.
Word for word from the decision Carmarthenshire published for this meeting. Source: democracy.carmarthenshire.gov.wales

Follow this further

Built from Carmarthenshire's papers

What the report saysPro

Report to Cabinet Member Rural Affairs, Communities, and Welsh Language

Appendices

5. Schedule of Minor Editorial Amendments Carmarthenshire Revised Local Development Plan (LDP) 2018 – 2033

Matters Arising Changes Consultation

1. Introduction

1.1The Carmarthenshire Revised Local Development Plan (rLDP) 2018-2033 is currently the subject of an Examination in Public. The Council has compiled a Schedule of Matters Arising Changes (MACs) primarily as a result of Action Points arising from the Examination Hearing Sessions that took place in October and November 2024, and September 2025. These changes are required to make the Plan sound. All of these MACs have been agreed with the Inspector. The MACs are presented for consultation and details of the consultation arrangements can be found below. This document should be read in conjunction with the updated Action Points available on the Examination website.

Types of MACs

1.2The Matters Arising Changes fall into two categories:

a) MACs (for consultation). The MACs are the main proposed changes to the Plan. They include changes of varying substance which relate to policy wordings, explanatory text and the proposals map. The Council considers these changes necessary to demonstrate the soundness of the rLDP and they have been agreed with the Inspector. These changes use the prefix ‘MAC’ and are individually numbered.

b) Minor Editing Changes (for information). The Minor Editing Changes (MECs) are alterations to the Plan which do not affect the meaning or implementation of a policy. They primarily include minor typographical changes, policy re- numbering and other general editing changes to the written statement. The MECs are presented for information only and representations are not invited on them.

1.3Some of the changes identified in the schedule require mapping changes to the Proposals Map and Inset Maps. These illustrate boundary changes, factual corrections or the inclusion of additional information on the LDP Proposals Map and Inset Maps. Only map changes relating to soundness issues are included in the MACs (distinguished as Map MACs), others, which are factual changes, are included in the MEC schedule.

1.4The two types of changes set out above are presented in separate schedules. The changes are presented in table form with each change having: a) a unique reference number; b) the part of the RLDP to which it relates e.g. policy number or paragraph number; c) the change itself with proposed deleted text presented in red strikethrough and new proposed text presented in green; and d) the source or origin of the change such as the Action Point reference together with the reason for the change. The MAC schedule uses existing site references as identified in the Second Deposit revised LDP and the Additional Sites Consultation documents. The site references will be subject to review to ensure that they run consecutively and consistently taking account of the removal of sites identified as commitments and the inclusion of additional sites. For the purposes of consulting on the MACs the original site references are retained for ease of reference and reader usability.

1.5Further consequential changes may also be necessary to the text of the rLDP as a result of the MACs identified in the schedule.

Consultation

2.1The Schedule of MACs and supporting documents can be viewed online and libraries during normal opening hours.

The MACs consultation documents comprise the following:

a) Schedule of MACs (this document

b) Integrated Sustainability Appraisal (ISA) Addendum; and

c) Habitats Regulations Assessment (HRA) Addendum.

2.2The MACs should be read in conjunction with the following documents:

a) rLDP Hearing Session Action Points;

b) The Second Deposit LDP Written Statement;

c) The Deposit LDP Proposals maps; and,

d) The Additional Sites Report

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
MAC Map table 25.02.26Plan 284 KB Download
PDF
MACM Map Cluster 1 completePlan 3 MB Download
PDF
MACM Map Cluster 2 completePlan 5.6 MB Download
PDF
MACM Map Cluster 3 completePlan 3.5 MB Download
PDF
Matters Arising Changes Document 25.02.26Report 5.6 MB DownloadRead as text
PDF
REVISED LOCAL DEVELOPMENT PLAN (2018: 2033) MATTERS ARISING CHANGES CONSULTATIONReport 124 KB Download

At this meeting

Whole meeting
2TO SIGN AS A CORRECT RECORD THE DECISION RECORD OF THE MEETING HELD ON THE 18TH NOVEMBER, 2025Decided
3REVISED LOCAL DEVELOPMENT PLAN (2018 - 2033) MATTERS ARISING CHANGES CONSULTATIONThis decision

Who was there

1 of 6 attended
CC
Cyng. Carys JonesCommittee Member, present, as expected, virtual
LJ
Llinos JenkinsOfficer Exempt Access, expected
SW
Stuart WaltersOfficer Exempt Access, expected
IR
Ian R LlewelynOfficer, in attendance, virtual
SC
Simon ClementOfficer, in attendance, virtual
EB
Emma BryerSecretary, in attendance, virtual

On this subject at Carmarthenshire

Search all
  1. REVISED LOCAL DEVELOPMENT PLAN (2018 - 2033) MATTERS ARISING CHANGES CONSULTATIONThis decision
  2. Draft supplementary planning guidance revised carmarthenshire local development plan 2018 - 2033Approved
  3. Draft supplementary planning guidance (spg): landscape character assessment revised local development planApproved
  4. Draft supplementary planning guidance (spg): landscape character assessment revised local development planApproved
  5. Revised local development plan (2018-2033): additional sites consultationNoted
  6. Draft supplementary planning guidance (spg) revised local development planApproved

More from Carmarthenshire Cabinet Member Rural Affairs, Communities, and Welsh Language

All decisions
MeetingDecisionOutcome
30 Jun 2026 To sign as a correct record the minutes of the meeting held on 11th march 2026RESOLVED to sign the minutes as a correct record of the meeting held on the 11 th March 2026. Decided Open
30 Jun 2026 Annual report on the welsh language 2025-26RESOLVED that the Annual Report on the Welsh Language 2025-26 and the Council's report on compliance with the Welsh L... Approved Open
30 Jun 2026 Welsh government allotment support grantRESOLVED that the following applications submitted as part of the Allotment Support Grant be approved: i. Llannon All... Approved Open
11 Mar 2026 To sign as a correct record the decision record of the meeting held on the 18th november, 2025RESOLVED to sign the minutes as a correct record of the meeting held on the 18th November 2025. Decided Open
24 Mar 2025 To sign as a correct record the decision record of the meeting held on the 25 march 2024RESOLVED to sign the minutes as a correct record of the meeting held on the 25 th March 2024. Decided Open