RESOLVED THAT 1. the merger and full digital upgrade of the Town Centre and Car Park CCTV systems be approved in principle 2. the temporary extension of the current Town Centre CCTV maintenance contract until procurement processes are completed for the upgrading works be approved; authority be delegated to the Director of Environmental and Regulatory Services in consultation with the Cabinet Member for Housing and Safety, to approve appropriate specification requirements for tender processes, and agree the capital and revenue implications within existing resources one contractor is appointed to carry out this agreed work, as well as undertaking the maintenance contract for the merged system be approved
Word for word from the decision Cheltenham published for this meeting.Source: democracy.cheltenham.gov.uk
Feasibility Report for Cheltenham Town Centre CCT V System Upgrade. �
Prepared by CDC Technical Services Ltd for:
Date - Thursday, 7 November 2013 �� � Client Name: Cheltenham Borough Council Feasibility Report for Town Centre CCTV System Upgrade �
Table of Contents
Introduction ....................................................................................................................4 Executive Summary. 4 Project Brief ....................................................................................................................5 Current Situation. 5 Consultant’s Brief. 7 General Condition. 7 Car Park Systems ............................................................................................................9 Introduction. 9 High Street. 9 St. George’s Road. 10 Sherborne Place. 11 West End/Phoenix Passage. 12 Chapel Walk/The Royal Well. 13 Rodney Road. 14 St. James Street. 15 Chelt Walk/Synagogue Lane. 16 Bath Parade. 17 Bath Terrace. 18 Portland Street and North Place. 19 Grosvenor Terrace/Town Centre East. 20 Regent’s Arcade. 21 Alternative Suggestions for Connection to Control Room 22 Wireless Network ...........................................................................................................23 Introduction 23 Site Survey 23 Camera Locations 25 Car Park Locations 27 Wireless Points of Presence (PoP) Locations 28 Network Switching Equipment 28 Summary 28 Control Room & System Upgrades ...............................................................................29 Introduction 29 Full Digital Upgrade 29 Partial Digital/Analog Upgrade 31
Budgets ...........................................................................................................................33 Current Situation 33 Full Digital Upgrade 35 Part Digital/Analog Upgrade (for Car Park Systems only) 36 Capital Funds 36 Exceptional Costs 37 Summary of Costs 38 Conclusions .....................................................................................................................39 Invest To Save 39 Control Room Relocation 39
1. Introduction 1.1. Executive Summary. The management of Cheltenham Borough Council’s public space CCTV control room have recently inherited the monitoring of Cheltenham Town Centre’s car park CCTV systems and are seeking advice as to the most effective methods of integrating these systems into the current control systems within the CCTV control room located within the Police Station at Lansdown Road. In addition to this work, Cheltenham Borough Council (CBC) are considering the possibility of replacing their current transmission infrastructure to incorporate wireless technology, removing their current dependance on BT whilst at the same time reducing their annual expenditure. Following a recent visit to the CBC’s CCTV control room and discussions with Trevor Gladding (CBC Community Protection Manager), Carol Cross (CBC Community Protection Officer) and the current incumbent maintenance provider, Openview Security Solutions Limited (OSSL), it was agreed that independent technical advice from CDC Technical Services (CDC) was sought to investigate the best way forward.
The first stage of the technical advice from CDC was to provide a feasibility report (this document) to investigate technical solutions to accommodate the above-mentioned requirements of CBC and provide budgetary costs where possible.
Consultant’s Recommendation Several options for systems upgrade were explored during the feasibility stage and most were dismissed for operational and/or maintenance reasons.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Leisure and Culture Services ContractRESOLVED THAT: 1. an extension to the management agreement between the council and The Cheltenham Trust until 30 Sept...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.