16/00383/FUL Lilley Brook Golf Club, 313 Cirencester Road

Refused Planning 3 papers

Planning Committee refused this item on Thursday 15 December 2016. Below is the council's own wording, with the papers it was decided on.

Item73

Resolved

Permit Letters of Rep: 29 Update Report: None MP introduced the application as above, a 5.35 hectare parcel of land in the AONB, on the western edge of the golf course, adjacent to Sandy Lane and including access through the site via Cirencester Road. Having scrutinised a number of matters, including the AONB, ecology and biodiversity, trees and landscaping, archaeology, flood risk, and highway safety, officers consider that the application should be refused on two grounds: firstly, the lack of information relating the archaeological remains on the site, and secondly the absence of a legal agreement to secure completion of the works. The application is at Planning Committee at the requests of Councillors Baker and Smith, due to concerns from local residents, and also as a result of an objection from the Parish Council. Public Speaking: [name removed], agent, in support This application is a re-submission of the previously withdrawn proposal, which raised concerns about drainage and traffic – access was via residential area of Sandy Lane. Was engaged to look at the proposal and suggest an alternative route using the A-road, and has been discussing the drainage issue with planning officers since March. There is now a tangible change in what is being proposed. The drainage scheme has an over-engineered capacity – 40% above what is required - and run-off will be drastically reduced. The 9-hole course will be well used, by juniors and beginners, providing them with a good introduction to the game. The applicant is happy to carry out an archaeological survey – which will be expensive - once it has the reassurance that other issues are OK. The officer recommendation is to refuse, but would request that the decision be deferred instead, to allow archaeological works to be undertaken. Member debate SW: has two main concerns. The site is in the AONB; the report refers to inert material being brought int. Is concerned about what type of material this will be – crushed concrete, old brick covered with top soil? This isn’t what the AONB is made of, and it will have an effect on areas outside the gold course. Would like to see material similar to what is there already. Secondly, there have been no geological studies done. Bringing in thousands of tons of material without knowing what is underneath is not advisable. A proper study should be done. The cost would not be outrageously expensive, and it would be invaluable to the application to get something of that nature done. On the question of whether the application should be deferred or refused, do the officers consider that deferral would allow the applicant time to do all that is needed? HM: we don’t get this type of application very ... view the full minutes text for item 73.
Word for word from the decision Cheltenham published for this meeting. Source: democracy.cheltenham.gov.uk

Follow this further

Built from Cheltenham's papers

What the report saysPro

Report to Planning Committee

APPLICATION NO: 16/00383/FUL OFFICER: [name removed] REGISTERED: 8th March 2016 DATE OF EXPIRY: 7th June 2016

WARD: Charlton Park PARISH: N/A

APPLICANT: Lilley Brook Golf Club

AGENT: Grass Roots Planning Ltd

LOCATION: Lilley Brook Golf Club, 313 Cirencester Road, Charlton Kings

PROPOSAL: Engineering works to re-profile and re-contour the existing practice facility to create a mini 9-hole golf course by importing 100,000 cubic metres of inert fill material

RECOMMENDATION: Refuse

This site map is for reference purposes only. OS Crown Copyright. All rights reserved Cheltenham Borough Council 100024384 2007 1. DESCRIPTION OF SITE AND PROPOSAL 1.1 Lilley Brook Golf Course is an 18 hole, private members’ golf course which sits at the foot of Leckhampton Hill on the western side of Cirencester Road. The site is located within the Cotswolds Area of Outstanding Natural Beauty (AONB) to the south of the borough, outside of the Principal Urban Area (PUA).

1.2The golf course extends through to Sandy Lane to the west, and backs onto a number of residential properties. To the north and east, the golf course backs onto residential properties in Longway Avenue, Charlton Kings Business Park, and the Cheltenham Park Hotel.

1.3There has been a golf course at Lilley Brook since 1922, with Cheltenham Golf Club having leased 132 acres of land including Lilleybrook Lodge in 1921. In 1964, the club purchased the land and lodge to include a further 27 acres, and later obtained an additional parcel of land. The current course layout was completed in 1969 together with a new clubhouse.

1.4The application site is a parcel of land, some 5.35 hectares, located at the western edge of the golf course adjacent to Sandy Lane and includes an access through the site from the Cirencester Road.

1.5The site is located within Flood Zone 1 and is therefore at a low risk of flooding; however, Southfield Brook lies to the west of the site, and Lilley Brook to the east.

1.6The application is seeking full planning permission for engineering works to re-profile and re-contour the existing practice facility to create a mini 9-hole, academy golf course by importing 100,000 cubic metres (approximately 150,000 tonnes) of inert fill material.

1.7It is proposed that the fill material would be imported to the site over a period of 18 months between 8am to 6pm Monday to Friday, and 8am to 1pm on Saturdays when necessary. Access to the site for deliveries would be from Cirencester Road.

1.8In addition to plans and drawings, the application has been accompanied by the following documents:

 Planning Statement  Transport Statement  Flood Risk Assessment (revised November 2016)  Landscape and Visual Report

1.9The application supersedes a previous application which was withdrawn in 2015. The previous application proposed the importation of approximately 50,000 cubic metres of inert fill material to be delivered via Sandy Lane following reinforcement of the unrestricted byway.

1.10The application is before planning committee at the request of Cllr Baker and Cllr Smith due to the level of concern amongst local residents. Charlton Kings Parish Council has also objected to the proposal, although the site sits just outside of the parish boundary. Additionally, an objection has been raised by the Cotswold Conservation Board. Members will visit the site on planning view. 2. CONSTRAINTS AND RELEVANT PLANNING HISTORY Constraints: Area of Outstanding Natural Beauty Smoke Control Order

Relevant Planning History: 15/00328/FUL WITHDRAWN 21st April 2015 Re-grading of existing practice facility using approximately 50,000 cubic metres of inert landfill material. Works to include additional tree planting and areas of native shrub and wild flower planting. Reinforcement of unrestricted byway (Sandy Lane) to accommodate material delivery requirements

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
16/00383/FUL Lilley Brook Golf Club, 313 Cirencester RoadReport 397 KB DownloadRead as text
PDF
Lilley Brook Golf Club: report update 13th DecemberReport 15 KB Download
PDF
Lilley Brook Golf Club: representationsReport 831 KB Withheld: personal details

At this meeting

Whole meeting

Who was there

14 of 21 attended
GB
Councillor Garth BarnesChair, present
BF
Councillor Bernard FisherVice-Chair, present
PB
Councillor Paul BakerCommittee Member, present
MC
Councillor Mike CollinsCommittee Member, apologies
CH
Councillor Colin HayCommittee Member, present
KH
Councillor Karl HobleyCommittee Member, apologies
AL
Councillor Adam LillywhiteCommittee Member, present
HM
Councillor Helena McCloskeyCommittee Member, present
CN
Councillor Chris NelsonCommittee Member, apologies
TO
Councillor Tony OliverCommittee Member, present
LS
Councillor Louis SavageCommittee Member, present
DS
Councillor Diggory SeacomeCommittee Member, present

All 21 on the meeting page

On this subject at Cheltenham

Search all
  1. 16/00383/FUL Lilley Brook Golf Club, 313 Cirencester RoadThis decision
  2. 17/00659/FUL Lilleybrook Golf ClubRefused

More from Cheltenham Planning Committee

All decisions
MeetingDecisionOutcome
21 Aug 2025 Declarations of InterestIt was agreed that this does not constitute a prejudicial interest, and he was therefore not required to leave the Ch... Agreed Open
17 Jun 2021 Any other items the Chairman determines urgent and requires a decisionIt was agreed that it was not relevant, the Chair disagreed as he thought that it was good to see that it was a mix o... Agreed Open
17 Dec 2020 20/01371/FUL Balcarras School, East End Road, Charlton Kings, Cheltenham GL53 8QFAgreed that the proposal was positive and had to be supported to cover the capacity required. It was the best that co... Agreed Open
17 Sep 2020 Minutes of last meetingRESOLVED THAT The minutes of the meeting held on 20 th August 2020 were approved and signed as a correct record. Approved Open
18 Jun 2020 ApologiesRESOLVED THAT Councillor McCloskey be appointed as Vice-Chair on a temporary basis. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies