Resolved
Permit Letters of Rep: 9 Update Report: None MP introduced the application as above, saying that planning permission for a single-storey dwelling on land to the rear of Ragged Stone was originally granted in November 2015. Work subsequently started, and during construction it became apparent that the height of the building would be higher than the approved scheme, and an application for a minor amendment was therefore made. The report refers to an increase of 300mm, but in fact this is 250mm on the lower part of the dwelling, and 150mm on the higher part. It is at Committee at the request of Councillor Britter. The recommendation is to permit. Public Speaking: [name removed], neighbour, in objection Is representing the many residents who are opposed to this application, and who are unhappy at the lack of important detail in the very dismissive officer report. Regarding visual impact, at 6.1.1, the report states that the land levels in Old Reddings Close are 500mm higher than the application site, which should soften the visual impact of the new structure, but this isn’t the case from the adjoining properties in Old Reddings Road. At 6.2.4, the report downplays the impact on the immediate neighbours, suggesting that boundary enclosures would help, but this isn’t possible next to Roebuck, as the wall is touching the boundary fence. The application raises the height of the structure by 30cm (four bricks), which increases shadow and reduces sunlight over the neighbour’s garden. The report gives no explanation of the reason for the increase. It says it was influenced by a number of factors, including the need to provide a deeper than typical ground-bearing slab due to poor conditions – but what does this have to do with increasing the built height of the wooden structure on top of the slab? The structure had been built to the now-requested size months before the current application was made on 9 th December. The enforcement team was told it was too high in October; work stopped, then continued apace. The original 2015 plans and the current update show an increase of 30cm in the thickness of the roof structure, and the enforcement team confirmed that larger roof timbers had to be introduced to strengthen the roof. Was this due to a monumental architectural error and lack of scrutiny by planning officers, hoping local residents wouldn’t notice? Why wasn’t the structure design adjusted at the beginning to accommodate the larger roof supports and maintain the approved height? And why was the developer confident to carry on work, even though the error had come to light? Reflecting on the innocuous, short sentence in the RPA ‘’Construction detailing of roof depth has resulted ... view the full minutes text for item 245.