Resolved
RESOLVED THAT: 1. the draft attached be approved; 2. the Bureau Veritas be approved; 3. the Bureau Veritas Modelling Study be approved.
Cabinet approved this item on Tuesday 23 May 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED THAT: 1. the draft attached be approved; 2. the Bureau Veritas be approved; 3. the Bureau Veritas Modelling Study be approved.
This Air Quality Action Plans (AQAP) outline the action we will take across the Borough to improve air quality. This fulfils the authority’s statutory responsibilities on local air quality management under part IV of the Environment Act 1995 (as amended in 2021). Our local air quality monitoring indicated levels of Nitrogen Dioxide (NO2) exceeded the annual mean objective in one geographical area. We declared this area an Air Quality Management Area (AQMA) in 2020. It extends from the junction of Gloucester Road, Tewkesbury Road and High Street along Poole Way to Swindon Road to the junction of St George’s Street. The AQAPs outline the actions required to improve air quality across the Borough and specifically what we will do to reduce levels of NO2 within the AQMA. The AQAPs, once approved, will be submitted to the Department for Environment, Food and Rural Affairs (Defra) for their appraisal. The authority has developed a collaborative approach, reflecting the need for upper and lower tier authorities and other key partners to work together to reduce pollution and improve air quality. The AQAPs include initiatives which can be delivered using existing knowledge and some ambitious initiatives which will require further research and funding to implement. Many of the actions within the report are not the responsibility of this Authority, many lie with Gloucestershire County Council for example, as the transport authority and we will
Page 1 of 21 Cabinet 23 May 2023
continue to work with them and our partners for effective delivery.
That Cabinet:
1. Approve the draft Air Quality Action Plan attached at Appendix 3 of this report.
2. Approve the Bureau Veritas Air Quality Action Plan at Appendix 4 of this report
3. Approve the Bureau Veritas Modelling Study at Appendix 5 of this report
1. Implications
Approval has been sought from the Director of Public Health that the residual COMF (Covid Management Funding) can be used to fund the proposed Air Quality fixed term contract role.
All other expenditure will be covered by existing base budget in the REG012 (Air Quality) cost centre.
Signed off by: Andy Taylor, Principal Commercial Accountant, [email protected]
Where, as a result of an air quality review, it appears that any air quality standards or objectives are not being achieved, or are not likely within the relevant period to be achieved, within the area of a local authority, the local authority shall by order designate this as an AQMA. Any changes to that designated area, following a subsequent air quality review, shall require an amendment to the designation order. Further legal advice should be requested on the statutory process for any amendments required.
There is also a legal requirement under the Environment Act 1995 for a local authority to produce an AQAP targeted at meeting air quality objectives where an AQMA has been declared.
A local authority is required to review and revise its AQAP in order to seek to achieve the prescribed air quality objectives. When considering revisions to its AQAP, local authorities are required to consult widely. In considering the report and the draft revised AQAP, Cabinet is required to have regard to the consultation responses and the proposed revisions to the AQAP, in addition to its public sector equality duty (PSED) under Section 149 of the Equality Act 2010. This duty provides that the Council must, when exercising its functions, have due regard to the need to eliminate discrimination, harassment and
Page 2 of 21 Cabinet 23 May 2023
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Air Quality Action PlanReport | 558 KB | DownloadRead as text |
PDF |
Draft CBC Air Quality Action Plan, May 2023Appendix 3 | 787 KB | Download |
PDF |
Air quality Action Plan Bureau Veritas, September 2022Appendix 4 | 1.4 MB | Download |
PDF |
Detailed Modelling Study, Bureau Veritas, August 2022Appendix 5 | 2.7 MB | Download |
PDF |
Public Consultation summary and officer commentsAppendix 6 | 334 KB | Download |
Follow Cabinet at Cheltenham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 15 Sep 2026 | General Fund and Housing Revenue Account Budget Monitoring Report Q1 2026-27RESOLVED THAT: 1. the contents of the report, including the forecast revenue and capital programme monitoring positio... | Noted | Open |
| 15 Sep 2026 | Sandy Lane Playing Field - Memorandum of UnderstandingRESOLVED THAT: 1. the council entering into a non-binding Memorandum of Understanding (“MOU”) with Patesians Sports a... | Approved | Open |
| 15 Sep 2026 | Disposal of Public Open Space - Grant of Lease - Hatherley Park Vendor PitchRESOLVED THAT: 1. authority is delegated to the Head of Finance and Assets, in consultation with the Monitoring Offic... | Decided | Open |
| 15 Sep 2026 | Leisure and Culture Services ContractRESOLVED THAT: 1. an extension to the management agreement between the council and The Cheltenham Trust until 30 Sept... | Agreed | Open |
| 15 Sep 2026 | Aids and Adaptations PolicyRESOLVED THAT: 1. that the is approved. | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.