RESOLVED – That the application be APPROVED subject to the following conditions: 1. Standard 2. Plans 3. Materials to be submitted 4. Surfacing materials to be submitted 5. Scheme of landscaping to be submitted 6. Scheme of landscaping to be implemented 7. Scheme of drainage to be submitted 8. Boundary treatment to be submitted 9. Turning area and parking for 2 vehicles as shown on approved plan to be provided (prior to occupation) and thereafter retained 10. Gates to be set back from access and no obstruction above height of 600mm in visibility splay 11. Alterations to Siloan to be carried out prior to first occupation of new dwelling 12. Remove all PD 13. Phase I contaminated land survey required 14. Hours of Construction to 08:00 – 18:00 Monday to Friday, 08:00 – 13:00 on Saturdays and not at all on Sunday or BH Monday 15. Details of pile driving to be submitted
Word for word from the decision Cheshire East published for this meeting.Source: moderngov.cheshireeast.gov.uk
Planning Reference No: 10/0796N Application Address: Land Adj To Siloan, Marsh Lane, Ravensmoor, Cheshire Proposal: New Dwelling Applicant: Mr & [name removed]: Full Planning Grid Reference: 362137 350616 Ward: Cholmondeley Earliest Determination Date: 1st April 2010 Expiry Dated: 27th April 2010 Date of Officer’s Site Visit: 15th March 2010 Date Report Prepared: 31st March 2010 Constraints: Open Countryside
SUMMARY RECOMMENDATION
Approve with Conditions
MAIN ISSUES
- Principle of Development - Impact on Streetscene - Impact on Amenity of adjacent properties - Impact on highway safety
1. REASON FOR REFERRAL
This application was to be dealt with under the Council’s delegation scheme. However Cllr Bailey has requested it to be referred to Committee due to design, impact on amenity and highways issues and for the Committee to consider the impact on the surrounding area.
2. DESCRIPTION OF SITE AND CONTEXT
The application site forms domestic curtilage to the side property known as Siloan on Marsh Lane within the village of Ravensmoor. Ravensmoor does not benefit from a settlement boundary and the site is therefore located within the Open Countryside. The site is located between residential development consisting of a pair of two storey semi- detached dwellings and a pair of semi-detached dormer bungalow. The existing property of Siloan is accessed from Barracks Lane to the west of the site. Between the application site and the adjacent property, Wyvern, is a disused access, which is understood to have served an electric sub station which has now been removed.
3. DETAILS OF PROPOSAL
The application proposes the construction of a two-storey, three bedroom, detached dwelling. The property will be ‘L’ shaped with a projecting gable towards Marsh Lane. The dwelling will have a maximum height of 6.8m and maximum width of 8m. The proposals show the proposed dwelling to be accessed from Marsh Lane with the provision of a driveway between the proposed dwelling and Siloan, parking to the rear and a turning area to the front of the dwelling. The scheme includes improvements to the visibility splay to Marsh Lane. The proposal also includes alterations to Siloan with the creation of a kitchen window to the rear and obscure glazing to existing windows within the side elevation.
4. RELEVANT HISTORY
09/3100N – Planning permission refused for a new dwelling on 19th November 2009.
5. POLICIES
The development plan includes the North West of England Plan Regional Spatial Strategy 2021 (RSS) and the Borough of Crewe and Nantwich Replacement Local Plan 2011 (LP). The relevant development plan policies are:
Local Plan policy
NE.2 Open Countryside BE.1 Amenity BE.2 Design Standards BE.3 Access and Parking BE.4 Drainage, Utilities and Resources BE.5 Infrastructure RES.5 Housing in the Open Countryside
Other Material Considerations
Local Development Framework – Development on Backland and Gardens
6. CONSULTATIONS (External to Planning)
Strategic Highways Manager: Recommends the provision of a vehicular turning area to allow vehicles to enter and leave in a forward gear (to be conditioned), and an informative for the new vehicular access to be constructed to CEC standard.
United Utilities: No objection to the proposal providing that surface water is not discharged to foul/combined sewer which must be drained on a separate system and only foul connected to main sewer.
Environmental Health: No objection – recommend conditions for a Phase I contaminated land survey, protection from noise during construction and pile driving.
7. VIEWS OF THE PARISH COUNCIL
None received at time of writing report
8. OTHER REPRESENTATIONS
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.