Item44
Resolved
For the reasons set out in the report and update report, the application be APPROVED, subject to the following conditions: 1 3 year time limit 2 Development in accordance with the approved plans 3 Details of proposed materials 4 Dust suppression methods 5 Details of electric vehicle charging points 6 Details of low emission boilers 7 Contaminated land risk assessment 8 Contaminated land verification report 9 Contaminated land soil testing 10 Contaminated land unexpected contamination 11 Details of a sustainable surface water drainage scheme 12 Foul and surface water shall be drained on separate systems 13 No removal of any vegetation or the demolition or conversion of buildings shall take place between 1 March and 31 August in any year, unless a detailed survey has been carried out to check for nesting birds 14 Submission of an ecological enhancement strategy 15 Retention and enhancement of existing hedgerow where possible, and compensatory native species planting to compensate for any sections of hedgerow unavoidable loss 16 Adherence to all the recommendations made in section 3 of the submitted Badger Survey Report (Kingdom Ecology 29/08/2021) 17 Details of levels 18 Protective fencing to be provided for the duration of any construction period 19 Details of secure, covered cycle storage and bin storage. R equirement for 6 cycle spaces 20 External lighting details to be submitted and approved
Word for word from the decision Cheshire East published for this meeting.
Source: moderngov.cheshireeast.gov.uk