Resolved
That for the reasons set out in the report and update report the application be APPROVED, subject to S106 agreement: S106 Amount Triggers NHS £60,568 towards improved health infrastructure facilities within the Congleton Locality and Primary Care Network that supports patient care provision within the area: • Lawton House Surgery • Meadowside Medical Centre • Readesmoor Medical Centre • Holmes Chapel Health Centre To be paid prior to the occupation of the 7th dwelling POS Offsite contributions for POS are £2,346.81 per bed space in apartment. Offsite contributions for GI Connectivity are £293.35 per bed space in apartments to a maximum of £586.70 per apartment. Outdoor sport contribution is £1,564.54 per family dwelling or £782.27 per bed space in apartments (to a maximum of £1,564.54 per apartment). To be paid prior to the occupation of the 7th dwelling Canal and Rivers Trust £20,000 towards towpath repairs in between Bridge 74 and Bridge 76, adjacent to the site To be paid prior to the occupation of the 7th dwelling Education £53,434.00 towards Secondary education To be paid prior to the occupation of the 7th dwelling and the following conditions: 1) 3 year time limit 2) Development in accordance with the approved plans 3) Details of proposed materials 4) Implementation of visibility improvement works 5) Construction Management Plan 6) Risk assessment and method statement outing all works and construction methods carried out adjacent to the canal and canal cutting 7) Details of the maintenance and management of site drainage to protect the stability of the canal cutting 8) Drainage design must proceed in accordance with drainage strategy ‘10626-HBL-XX-XX-DR-C-0104’ Rev.P8. Dated 5.3.2024 9) No infiltration of surface water drainage into the ground 10) Low emission boilers 11) Compliance with the noise report 12) Contaminated land – risk assessment 13) Contaminated land – verification report 14) Contaminated land – no exportation of soils 15) Contaminated land – unexpected contamination 16) Contaminated land – risk assessment 17) Piling methods 18) Age restriction of occupants of the retirement living apartments 19) Compliance with landscaping plan 20) Compliance with boundary treatment plan 21) Details of proposed and existing levels 22) 30-year Habitat Management and Monitoring Plan 23) Breeding birds 24) Ecological enhancements 25) At least 30% of dwellings in housing developments should comply with requirement M4 (2) Category 2 of the Building Regulations regarding accessible and adaptable dwellings 26) At least 6% of dwellings in housing developments should comply with requirement M4 (3)(2)(a) Category 3 of the Building Regulations regarding wheelchair adaptable dwellings. 27) Age restriction not less than 60 28) No dig construction method 29) Compliance with the tree protection and special construction measures identified in the Arboricultural Statement ((CW/11462-AS-1) dated 19/3/2025 and Tree Protection Plan (CW/11462-P-TP-1) dated 19/3/2025 30) prior to commencement ... view the full minutes text for item 39.