CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Sep3Thursday

Cabinet

Cheshire EastHeldPapers from moderngov.cheshireeast.gov.uk
Thursday 3 September 2026, 10.30amHeld 80 days ago.
Committee Suite 12 and 3, Delamere House, Delamere Street, Crewe, CW1 2JZ. Open to the public.
20 items, 86 papersAbout 124 MB, led by Progress Update on the Corporate Improvement and Transformation Delivery Plan.
No exempt items listedEvery item is due to be heard in public.
This meeting was held3 September 2026
20items
86papers
15decisions
–exempt
Running order, sized by papersItem 23 to 42
ReportsProcedureExempt parts

AI summaryWhat Cabinet decided

Checked against 78 papers PDF briefing Pro

Cabinet noted a forecast balanced 2026/27 budget at Quarter 1, achieved only with £24.995m of Exceptional Financial Support, and flagged a £15m gap for 2027/28. It approved a £51.212m Better Care Fund agreement, adult services commissioning worth around £371m over seven years, a £1.68m community grants programme, and the final Local Transport Plan.

14decisions 1agreed7approved5noted 6with money Topicsgovernance, finance, social care, transport, health
29
Noted
2026/27 Budget - Quarter 1 Forecast OutturnCheshire East Cabinet notes a forecast balanced 2026/27 position at Quarter 1, but only after £24.995m of Exceptional Financial Support. Capital spending is forecast at £218.679m against a £192.842m budget, and contingency virements totalling £16.135m are approved.
£218.7mAgainst £192.842m capital budget; £16.135m contingency virements
Read in full
30
Noted
Strategic Risk Register Update Q4 2025-26 and Q1 2026-27Cheshire East Cabinet noted the Strategic Risk Register position for Q4 2025/26 and Q1 2026/27, covering governance, leadership and financial sustainability risks, and backed Corporate Leadership Team actions to reduce exposure.
–
Read in full
31
Noted
Finance Leadership Improvement Plan Update and ReviewCheshire East Cabinet notes progress on the Financial Leadership Improvement Plan and the approach set out in a refreshed draft, FLIP 2.0, which aims to move the council from short-term stabilisation to medium-term financial strengthening.
–
Read in full
32
Approved
Performance Management Framework and Q4 Performance 2025/26Cheshire East Cabinet approves new Performance Management Framework and 2026/27 corporate KPIs, noting mixed Q4 2025/26 outturns across the three strategic commitments.
–
Read in full
33
Approved
Communications and Engagement StrategyCheshire East Cabinet approves Communications and Engagement Strategy, signalling a shift to proactive, digital, campaign-led communication and two-way engagement with residents.
–
Read in full
34
Decided
Progress Update on the Corporate Improvement and Transformation Delivery PlanCheshire East Cabinet notes progress on its improvement and transformation plan to end of June 2026, with financial sustainability flagged as at risk and a £15m funding gap for 2027/28 to address.
£15mIdentified in finance section
Read in full
35
Noted
Final Local Transport Delivery PlanCheshire East Cabinet endorses final four-year Local Transport Delivery Plan for submission to the Cheshire and Warrington Combined Authority, including £5.184m Bus Services Fund proposals.
£5.18mPlus £90,000 Combined Authority contribution
Read in full
36
Approved
Cheshire East Grants Policy and Enabling Communities Grants ProgrammeCheshire East Cabinet unanimously approves a new corporate grants policy for 2026 to 2029 and a £1.68m Enabling Communities Grants Programme for 2026/27.
£1.68mTwo funds: Healthy Neighbourhoods and Cost of Living Resilience
Read in full
37
Approved
Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030Cheshire East Cabinet approved the Enabling Healthy Neighbourhoods Framework 2026-2030 and handed oversight to the Health and Wellbeing Board, setting a one-council approach to working with the voluntary sector.
–
Read in full
38
Approved
Commissioning Activity Forward Plan - Adults, Health and IntegrationCheshire East Cabinet approves Adults, Health and Integration commissioning forward plan for September 2026 to March 2027 and delegates authority for related contract awards.
£371mLargest contract is Supported Living framework
Read in full
39
Agreed
Better Care Fund Section 75 Agreement 2026-27 & 2027-28Cabinet approved a new one-year pooled budget agreement with Cheshire and Merseyside ICB worth £51.212m for the Better Care Fund from 1 April 2026, with an option to extend for a second year.
£51.2mBCF pooled budget for 2026/27
Read in full
40
Noted
Enabling Local Service Delivery FrameworkCheshire East Cabinet approves Local Service Delivery Framework, setting out a phased partnership approach with town and parish councils covering services and assets, and delegates policy work to the Executive Director of Place.
–
Read in full
41
Approved
Unlocking Growth Opportunities for Cheshire East: Strategic Capacity and the Greater Crewe ProgrammeCheshire East Cabinet approved procuring a strategic partner to access Combined Authority opportunities, backed a three-year growth programme centred on Greater Crewe, and agreed to seek a developer for council-owned land in Crewe town centre.
–
Read in full
42
Approved
Capital Disposal Programme 2026-2029 - Revised ApproachCheshire East Cabinet approves a revised three-year Capital Disposal Programme, delegating authority to dispose surplus assets and procure external legal and property services via the Bloom Framework to maximise capital receipts.
–
Read in full
1 procedural item (apologies, declarations, minutes and the like) is not summarised.
Written by AI from the council's own reports and checked against them before publishing. Each decision page shows the sources, paragraph by paragraph.Report a problem

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Progress Update on the Corporate Improvement and Transformation Delivery Plan is the main business.

23
Procedure

Urgent Announcements from Leader, Deputy Leader and Cabinet Members

24
Procedure

Apologies for Absence

To receive any apologies for absence.

25
Procedure

Declarations of Interest

View the declarations of interest for item 25. To provide an opportunity for Members and Officers to declare any disclosable pecuniary interests, other registerable interests, and non-registerable interests in any item on the agenda.

26
Report

Minutes of Previous Meeting

To approve the minutes of the meeting held on 2 July 2026.

Decision: That the minutes of the meeting held on 2 July 2026 be agreed as an accurate record and signed by the Chair. Decision page

2 papers, 204 KBSearch inside with Pro
ReportMinutes of Previous Meeting102 KBDownload
ReportMinutes of Previous Meeting102 KBDownload
27
Procedure

Public Speaking Time/Open Session

In accordance with the Cabinet Procedure Rules, a total period of 15 minutes is allocated for members of the public to put questions to Cabinet on any matter relating to this agenda. Each member of the public will be allowed up to two minutes each to speak, and the Chair will have discretion to vary this where they consider it appropriate. Members of the public wishing to speak are required to provide notice of this...

28
Procedure

Questions to Cabinet Members

A period of 15 minutes is allocated for questions to be put to Cabinet Members by Members of the Council on matters relating to this agenda. A maximum period of two minutes will be allowed for each Member wishing to ask a question. The Chair will have discretion to vary this requirement where they consider it appropriate. Members wishing to ask a question at the meeting must provide 3 clear working days’ notice. The...

29
Report

2026/27 Budget - Quarter 1 Forecast Outturn

To consider a report on the 2026/27 Quarter 1 Forecast Outturn position.

Decision: RESOLVED (unanimously): That Cabinet 1. Note the factors leading to a forecast balanced position and the contents of Annex 1, Section 2 progress on the delivery of the MTFS approved budget policy change items, the RAG ratings and latest forecasts. Note the actions to be taken to address any adverse variances from the approved budget within the overall position. 2. Note the in-year forecast capital spending of £218.679m against the capital budget (at outturn) of £192.842m. 3. Approve the... Decision page

10 papers, 5.4 MBSearch inside with Pro
Report2026/27 Budget: Quarter 1 Forecast Outturn364 KBDownload
Report2026/27 Budget: Quarter 1 Forecast Outturn364 KBDownload
Report20260825102353_006556_0013322_Annex1FR1202627PostCP1 MBDownload
Report20260825102353_006556_0013322_Annex1FR1202627PostCP1 MBDownload
Report20260825102353_006557_0013323_Annex2FR1202627PostCP795 KBDownload
Report20260825102353_006557_0013323_Annex2FR1202627PostCP795 KBDownload
Report20260825102353_006558_0013324_Annex3FR1202627PostCP368 KBDownload
Report20260825102353_006558_0013324_Annex3FR1202627PostCP368 KBDownload
Report20260825102353_006577_0013325_Annex4Quarter12627Section151AssuranceStatement116 KBDownload
Report20260825102353_006577_0013325_Annex4Quarter12627Section151AssuranceStatement116 KBDownload
30
Report

Strategic Risk Register Update Q4 2025-26 and Q1 2026-27

To receive an update on the strategic risk register.

Decision: RESOLVED (unanimously): That Cabinet 1. Note the position of the Strategic Risk Register following the Quarter 4 2025/26 and Quarter 1 2026/27 reviews in respect of the changes in risk exposure and risk management activity outlined. 2. Support the actions being taken by the Corporate Leadership Team and risk managers to mitigate and reduce risk exposure. Decision page

6 papers, 2.7 MBSearch inside with Pro
Report20260825110212_005788_0013328_StrategicRiskRegisterUpdateAppendixACabinet060826612 KBDownload
Report20260825110212_005788_0013328_StrategicRiskRegisterUpdateAppendixACabinet060826612 KBDownload
Report20260825110212_006327_0013329_StrategicRiskRegisterUpdateQ1202627AppendixACabinet03092026584 KBDownload
Report20260825110212_006327_0013329_StrategicRiskRegisterUpdateQ1202627AppendixACabinet03092026584 KBDownload
ReportStrategic Risk Register Update Q4 2025-26 and Q1 2026-27132 KBDownload
ReportStrategic Risk Register Update Q4 2025-26 and Q1 2026-27132 KBDownload
31
Report

Finance Leadership Improvement Plan Update and Review

To receive an update on progress against the Financial Leadership Improvement Plan.

Decision: RESOLVED (unanimously): That Cabinet 1. Note the content and progress made against the Financial Leadership Improvement Plan. 2. Note the approach approved in the refreshed Draft Financial Leadership Improvement Plan 2.0 and the accompanying action plan. Decision page

6 papers, 1.7 MBSearch inside with Pro
ReportAppendix A: for Financial Leadership & Improvement Plan 2026-27 Q1322 KBDownload
ReportAppendix A: for Financial Leadership & Improvement Plan 2026-27 Q1322 KBDownload
ReportAppendix B: for Financial Leadership & Improvement Plan 2026-27 Q1336 KBDownload
ReportAppendix B: for Financial Leadership & Improvement Plan 2026-27 Q1336 KBDownload
ReportFinance Leadership Improvement Plan Update and Review172 KBDownload
ReportFinance Leadership Improvement Plan Update and Review172 KBDownload
32
Report

Performance Management Framework and Q4 Performance 2025/26

To receive a report on the Performance Management Framework including Q4 performance 2025-26.

Decision: RESOLVED (unanimously): That Cabinet 1. Approve the Performance Management Framework (PMF) attached at Appendix A. 2. Approve the Corporate Key Performance Indicators (KPIs) for 2026/27 and note the fourth quarter (Q4) 2025/26 performance. Decision page

6 papers, 3.9 MBSearch inside with Pro
ReportAppendix 1: Performance Management Framework662 KBDownload
ReportAppendix 1: Performance Management Framework662 KBDownload
ReportAppendix 2: for Performance Management Framework and fourth-quarter performance 2025/261.1 MBDownload
ReportAppendix 2: for Performance Management Framework and fourth-quarter performance 2025/261.1 MBDownload
ReportPerformance Management Framework and Q4 Performance 2025/26136 KBDownload
ReportPerformance Management Framework and Q4 Performance 2025/26136 KBDownload
33
Report

Communications and Engagement Strategy

To consider the report which outlines the council’s strategic approach to public and stakeholder communications and engagement.

Decision: RESOLVED (unanimously): That Cabinet 1. Approve the strategic approach and principles for the Council’s communications and engagement activity as set out in Appendix 1 of the report. 2. Agree to support continued engagement with the Community Voices panel regarding our engagement principles and practice, to continue to refine and embed our approach. Decision page

6 papers, 1.5 MBSearch inside with Pro
ReportAppendix 1: for Communications and Engagement Strategy250 KBDownload
ReportAppendix 1: for Communications and Engagement Strategy250 KBDownload
ReportAppendix 2: for Communications and Engagement Strategy393 KBDownload
ReportAppendix 2: for Communications and Engagement Strategy393 KBDownload
ReportCommunications and Engagement Strategy108 KBDownload
ReportCommunications and Engagement Strategy108 KBDownload
34
ReportMain business

Progress Update on the Corporate Improvement and Transformation Delivery Plan

To consider an update on the Improvement and Transformation Delivery Plan.

Decision: RESOLVED (unanimously): That Cabinet 1. Note progress with the delivery of the Corporate Improvement and Transformation Delivery Plan 2025-27 at end of June 2026 (Appendix 1 of the report). Decision page

4 papers, 13 MBSearch inside with Pro
ReportAppendix 1: _ProgressTrackerImprovementandTransformationDeliveryPlanendJuneFINA6.5 MBDownload
ReportAppendix 1: _ProgressTrackerImprovementandTransformationDeliveryPlanendJuneFINA6.5 MBDownload
ReportProgress Update on the Corporate Improvement and Transformation Delivery Plan190 KBDownload
ReportProgress Update on the Corporate Improvement and Transformation Delivery Plan190 KBDownload
35
Report

Final Local Transport Delivery Plan

To consider the report on the finalised delivery programme for the Department for Transport (DfT) Local Transport Grant (LTG) capital funding allocation for Cheshire East.

Decision: RESOLVED (unanimously): That Cabinet 1. Endorse the submission of the LTDP programme, as summarised in Appendix 1 of the report, to the Cheshire & Warrington Combined Authority, noting that there is scope for further changes to the delivery programme in future years, as the Council and Combined Authority investment priorities develop. 2. Note the amendments made to the LTDP since the draft submission in April 2026, as set out in Appendix 2 of the report, which includes a Combined Authority... Decision page

10 papers, 5.3 MBSearch inside with Pro
ReportAppendix 1: for FLTDP1.1 MBDownload
ReportAppendix 1: for FLTDP1.1 MBDownload
ReportAppendix 2: for Final Local Transport Delivery Plan26 KBDownload
ReportAppendix 2: for Final Local Transport Delivery Plan26 KBDownload
ReportAppendix 3: for Final Local Transport Delivery Plan832 KBDownload
ReportAppendix 3: for Final Local Transport Delivery Plan832 KBDownload
ReportAppendix 4: for Final Local Transport Delivery Plan532 KBDownload
ReportAppendix 4: for Final Local Transport Delivery Plan532 KBDownload
ReportFinal Local Transport Delivery Plan162 KBDownload
ReportFinal Local Transport Delivery Plan162 KBDownload
36
Report

Cheshire East Grants Policy and Enabling Communities Grants Programme

To consider the report which seeks approval for the adoption of the Cheshire East Corporate Grants Policy 2026–2030.

Decision: RESOLVED (unanimously): That Cabinet 1. Approve the Cheshire East Grants Policy 2026–2029 which includes the Operational Annex Pack (Annexes A–G) as supporting guidance. 2. Delegate authority to the Executive Director of Adults, Health and Integration to approve minor amendments to operational annexes to reflect legislative or operational changes. 3. Approve the delivery of the Enabling Communities Grants Programme 2026/27, as outlined in paragraph 28 of the report. 4. Note that all new and... Decision page

8 papers, 13 MBSearch inside with Pro
ReportAppendix 1: Cheshire East Grants Policy1.5 MBDownload
ReportAppendix 1: Cheshire East Grants Policy1.5 MBDownload
ReportAppendix 2: Cheshire East Grants Policy Summary333 KBDownload
ReportAppendix 2: Cheshire East Grants Policy Summary333 KBDownload
ReportAppendix 3: Community Grants Impact Report 2526_V34.6 MBDownload
ReportAppendix 3: Community Grants Impact Report 2526_V34.6 MBDownload
ReportCheshire East Grants Policy and Enabling Communities Grants Programme218 KBDownload
ReportCheshire East Grants Policy and Enabling Communities Grants Programme218 KBDownload
37
Report

Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030

To consider the report which sets out the proposed framework that will shape the council’s relationships with the VCFSE sector.

Decision: RESOLVED (unanimously): That Cabinet 1. Approve the Enabling Healthy Neighbourhoods Framework 2026–2030. 2. Delegate the oversight of the Enabling Healthy Neighbourhoods Framework 2026–2030 to the Health and Wellbeing Board on approval, noting the Monitoring officer will make the appropriate changes to the Health and Wellbeing Board’s terms of reference, within the constitution, to reflect this delegation. Decision page

8 papers, 6.2 MBSearch inside with Pro
ReportAppendix 1: Framework: Enabling Healthy Neighbourhoods1.8 MBDownload
ReportAppendix 1: Framework: Enabling Healthy Neighbourhoods1.8 MBDownload
ReportAppendix 2: Enabling Healthy Neighbourhoods Framework Consultation Feedback563 KBDownload
ReportAppendix 2: Enabling Healthy Neighbourhoods Framework Consultation Feedback563 KBDownload
ReportAppendix 3: Equality Impact Assessment, Enabling Healthy Neighbourhoods Framework572 KBDownload
ReportAppendix 3: Equality Impact Assessment, Enabling Healthy Neighbourhoods Framework572 KBDownload
ReportConnected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030211 KBDownload
ReportConnected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030211 KBDownload
38
Report

Commissioning Activity Forward Plan - Adults, Health and Integration

To receive an overview of all upcoming commissioning and procurement activity.

Decision: RESOLVED (unanimously): That Cabinet 1. Approve the Commissioning and Procurement Forward Plan for Adults, Health and Integration covering the period September 2026 to March 2027. 2. Delegate authority to the appropriate Cabinet Member/Portfolio Lead in Adults, Health and Integration in consultation with the Executive Director of Adults, Health and Integration and the Section 151 Officer, to: a. Approve all associated commissioning and procurement activity for the services listed in the report.... Decision page

2 papers, 388 KBSearch inside with Pro
ReportCommissioning Activity Forward Plan: Adults, Health and Integration194 KBDownload
ReportCommissioning Activity Forward Plan: Adults, Health and Integration194 KBDownload
39
Report

Better Care Fund Section 75 Agreement 2026-27 & 2027-28

To consider the report which seeks approval to enter into a new Section 75 agreement for one year between CEC and Cheshire and Merseyside ICB.

Decision: RESOLVED (unanimously): That Cabinet 1. Authorise the Council to enter into a new Section 75 Agreement with Cheshire and Merseyside ICB for a period of one year from 1 April 2026, for the council’s minimum required budget, together with the option to extend that agreement for a further period of one year (subject to there being a national requirement to operate the Better Care Fund as a Section 75 pooled budget agreement until 31 March 2027). 2. Delegate authority to the Executive Director of... Decision page

2 papers, 626 KBSearch inside with Pro
ReportBetter Care Fund Section 75 Agreement 2026-27 & 2027-28313 KBDownload
ReportBetter Care Fund Section 75 Agreement 2026-27 & 2027-28313 KBDownload
40
Report

Enabling Local Service Delivery Framework

To consider the report which seeks approval of the framework with local councils to support local asset and service transfer.

Decision: RESOLVED (unanimously): That Cabinet 1. Note the significant contribution of the Multi-Agency Local Service Delivery Task and Finish Group in co-producing the Local Service Delivery Framework. 2. Approve the , comprising of the Local Service Delivery Strategy, Delivery Plan and Charter (Appendix 1) as the Council’s operating model for improving communication, clarifying roles and responsibilities, and aligning priorities with Local Councils to support the delivery of services and assets at a... Decision page

6 papers, 3.2 MBSearch inside with Pro
ReportAppendix 1: Local Service Delivery Framework1.3 MBDownload
ReportAppendix 1: Local Service Delivery Framework1.3 MBDownload
ReportAppendix 2: Part 1: Priority programme of asset ad local service delivery opportunities 26-27143 KBDownload
ReportAppendix 2: Part 1: Priority programme of asset ad local service delivery opportunities 26-27143 KBDownload
ReportEnabling Local Service Delivery Framework162 KBDownload
ReportEnabling Local Service Delivery Framework162 KBDownload
41
Report

Unlocking Growth Opportunities for Cheshire East: Strategic Capacity and the Greater Crewe Programme

To consider the report which seeks approval to strengthen Cheshire East Council's strategic capacity and capability to maximise opportunities arising from its role as a Constituent Member of the Cheshire and Warrington Combined Authority.

Decision: RESOLVED (unanimously): That Cabinet 1. Approve the procurement of a strategic partner to provide intelligent client and technical support to the Council in unlocking opportunities arising from Cheshire East's role within the Cheshire and Warrington Combined Authority. 2. Delegate authority to the Executive Director of Place, in consultation with relevant Cabinet Members, to: a. Procure and appoint the strategic partner; b. Agree the contract, duration and value; c. Commission associated... Decision page

2 papers, 282 KBSearch inside with Pro
ReportUnlocking Growth Opportunities for Cheshire East: Strategic Capacity and the Greater Crewe Programme141 KBDownload
ReportUnlocking Growth Opportunities for Cheshire East: Strategic Capacity and the Greater Crewe Programme141 KBDownload
42
Report

Capital Disposal Programme 2026-2029 - Revised Approach

To consider the report on the Capital Disposal Programme.

Decision: RESOLVED (unanimously): That Cabinet 1. Delegate authority to the Executive Director of Place in consultation with the Director of Law and Governance, Section 151 Officer, Portfolio Holder for Planning, Housing and Regeneration , and the Portfolio Holder for Legal and Finance, to market the assets, negotiate and approve the final terms of the disposal, enter relevant contracts and proceed with the disposal of each asset listed in Appendix A, with all disposals to be undertaken in accordance... Decision page

2 papers, 296 KBSearch inside with Pro
ReportCapital Disposal Programme 2026-2029: Revised Approach148 KBDownload
ReportCapital Disposal Programme 2026-2029: Revised Approach148 KBDownload
Read inside all 86 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

What this meeting moved on

1 journey

The main business: Progress Update on the Corporate Improvement and Transformation Delivery Plan

Item 34 is where most of this meeting's papers sit: 4 papers, about 13 MB.

Item 34

Progress Update on the Corporate Improvement and Transformation Delivery Plan

To consider an update on the Improvement and Transformation Delivery Plan.

What is in the pack4 papers, about 13 MB
Appendix 1
_ProgressTrackerImprovementandTransformationDeliveryPlanendJuneFINAThe report to the committee
6.5 MB
Appendix 1
_ProgressTrackerImprovementandTransformationDeliveryPlanendJuneFINAThe report to the committee
6.5 MB
Report
Progress Update on the Corporate Improvement and Transformation Delivery PlanThe report to the committee
190 KB
Report
Progress Update on the Corporate Improvement and Transformation Delivery PlanThe report to the committee
190 KB
Read and search every page of this itemPro opens all 4 papers, and keeps them if the council removes them.

How this item got here

This is the first time this subject appears in the meetings we have read.

3 September 2026Progress Update on the Corporate Improvement and Transformation Delivery PlanThis meeting.

Every paper for this meeting

All 86 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Agenda frontsheetItem
146 KB
Kept 30 Sep
Agenda frontsheetItem
146 KB
Kept 30 Sep
Agenda reports packItem
33 MB
Kept 30 Sep
Agenda reports packItem
33 MB
Kept 30 Sep
Printed minutesItem
164 KB
Kept 30 Sep
Printed minutesItem
164 KB
Kept 30 Sep
Minutes of Previous MeetingItem 26, Minutes of Previous Meeting
102 KB
Kept 30 Sep
Minutes of Previous MeetingItem 26, Minutes of Previous Meeting
102 KB
Kept 30 Sep
2026/27 Budget: Quarter 1 Forecast OutturnItem 29, 2026/27 Budget - Quarter 1 Forecast Outturn
364 KB
Kept 30 Sep
2026/27 Budget: Quarter 1 Forecast OutturnItem 29, 2026/27 Budget - Quarter 1 Forecast Outturn
364 KB
Kept 30 Sep
20260825102353_006556_0013322_Annex1FR1202627PostCPItem 29, 2026/27 Budget - Quarter 1 Forecast Outturn
1 MB
Kept 30 Sep
20260825102353_006556_0013322_Annex1FR1202627PostCPItem 29, 2026/27 Budget - Quarter 1 Forecast Outturn
1 MB
Kept 30 Sep
20260825102353_006557_0013323_Annex2FR1202627PostCPItem 29, 2026/27 Budget - Quarter 1 Forecast Outturn
795 KB
Kept 30 Sep
20260825102353_006557_0013323_Annex2FR1202627PostCPItem 29, 2026/27 Budget - Quarter 1 Forecast Outturn
795 KB
Kept 30 Sep
20260825102353_006558_0013324_Annex3FR1202627PostCPItem 29, 2026/27 Budget - Quarter 1 Forecast Outturn
368 KB
Kept 30 Sep
20260825102353_006558_0013324_Annex3FR1202627PostCPItem 29, 2026/27 Budget - Quarter 1 Forecast Outturn
368 KB
Kept 30 Sep
20260825102353_006577_0013325_Annex4Quarter12627Section151AssuranceStatementItem 29, 2026/27 Budget - Quarter 1 Forecast Outturn
116 KB
Kept 30 Sep
20260825102353_006577_0013325_Annex4Quarter12627Section151AssuranceStatementItem 29, 2026/27 Budget - Quarter 1 Forecast Outturn
116 KB
Kept 30 Sep
20260825110212_005788_0013328_StrategicRiskRegisterUpdateAppendixACabinet060826Item 30, Strategic Risk Register Update Q4 2025-26 and Q1 2026-27
612 KB
Kept 30 Sep
20260825110212_005788_0013328_StrategicRiskRegisterUpdateAppendixACabinet060826Item 30, Strategic Risk Register Update Q4 2025-26 and Q1 2026-27
612 KB
Kept 30 Sep
20260825110212_006327_0013329_StrategicRiskRegisterUpdateQ1202627AppendixACabinet03092026Item 30, Strategic Risk Register Update Q4 2025-26 and Q1 2026-27
584 KB
Kept 30 Sep
20260825110212_006327_0013329_StrategicRiskRegisterUpdateQ1202627AppendixACabinet03092026Item 30, Strategic Risk Register Update Q4 2025-26 and Q1 2026-27
584 KB
Kept 30 Sep
Strategic Risk Register Update Q4 2025-26 and Q1 2026-27Item 30, Strategic Risk Register Update Q4 2025-26 and Q1 2026-27
132 KB
Kept 30 Sep
Strategic Risk Register Update Q4 2025-26 and Q1 2026-27Item 30, Strategic Risk Register Update Q4 2025-26 and Q1 2026-27
132 KB
Kept 30 Sep
for Financial Leadership & Improvement Plan 2026-27 Q1Appendix A, item 31, Finance Leadership Improvement Plan Update and Review
322 KB
Kept 30 Sep
for Financial Leadership & Improvement Plan 2026-27 Q1Appendix A, item 31, Finance Leadership Improvement Plan Update and Review
322 KB
Kept 30 Sep
for Financial Leadership & Improvement Plan 2026-27 Q1Appendix B, item 31, Finance Leadership Improvement Plan Update and Review
336 KB
Kept 30 Sep
for Financial Leadership & Improvement Plan 2026-27 Q1Appendix B, item 31, Finance Leadership Improvement Plan Update and Review
336 KB
Kept 30 Sep
Finance Leadership Improvement Plan Update and ReviewItem 31, Finance Leadership Improvement Plan Update and Review
172 KB
Kept 30 Sep
Finance Leadership Improvement Plan Update and ReviewItem 31, Finance Leadership Improvement Plan Update and Review
172 KB
Kept 30 Sep
Performance Management FrameworkAppendix 1, item 32, Performance Management Framework and Q4 Performance 2025/26
662 KB
Kept 30 Sep
Performance Management FrameworkAppendix 1, item 32, Performance Management Framework and Q4 Performance 2025/26
662 KB
Kept 30 Sep
for Performance Management Framework and fourth-quarter performance 2025/26Appendix 2, item 32, Performance Management Framework and Q4 Performance 2025/26
1.1 MB
Kept 30 Sep
for Performance Management Framework and fourth-quarter performance 2025/26Appendix 2, item 32, Performance Management Framework and Q4 Performance 2025/26
1.1 MB
Kept 30 Sep
Performance Management Framework and Q4 Performance 2025/26Item 32, Performance Management Framework and Q4 Performance 2025/26
136 KB
Kept 30 Sep
Performance Management Framework and Q4 Performance 2025/26Item 32, Performance Management Framework and Q4 Performance 2025/26
136 KB
Kept 30 Sep
for Communications and Engagement StrategyAppendix 1, item 33, Communications and Engagement Strategy
250 KB
Kept 30 Sep
for Communications and Engagement StrategyAppendix 1, item 33, Communications and Engagement Strategy
250 KB
Kept 30 Sep
for Communications and Engagement StrategyAppendix 2, item 33, Communications and Engagement Strategy
393 KB
Kept 30 Sep
for Communications and Engagement StrategyAppendix 2, item 33, Communications and Engagement Strategy
393 KB
Kept 30 Sep
Communications and Engagement StrategyItem 33, Communications and Engagement Strategy
108 KB
Kept 30 Sep
Communications and Engagement StrategyItem 33, Communications and Engagement Strategy
108 KB
Kept 30 Sep
_ProgressTrackerImprovementandTransformationDeliveryPlanendJuneFINAAppendix 1, item 34, Progress Update on the Corporate Improvement and Transformation Delivery Plan
6.5 MB
Kept 30 Sep
_ProgressTrackerImprovementandTransformationDeliveryPlanendJuneFINAAppendix 1, item 34, Progress Update on the Corporate Improvement and Transformation Delivery Plan
6.5 MB
Kept 30 Sep
Progress Update on the Corporate Improvement and Transformation Delivery PlanItem 34, Progress Update on the Corporate Improvement and Transformation Delivery Plan
190 KB
Kept 30 Sep
Progress Update on the Corporate Improvement and Transformation Delivery PlanItem 34, Progress Update on the Corporate Improvement and Transformation Delivery Plan
190 KB
Kept 30 Sep
for FLTDPAppendix 1, item 35, Final Local Transport Delivery Plan
1.1 MB
Kept 30 Sep
for FLTDPAppendix 1, item 35, Final Local Transport Delivery Plan
1.1 MB
Kept 30 Sep
for Final Local Transport Delivery PlanAppendix 2, item 35, Final Local Transport Delivery Plan
26 KB
Kept 30 Sep
for Final Local Transport Delivery PlanAppendix 2, item 35, Final Local Transport Delivery Plan
26 KB
Kept 30 Sep
for Final Local Transport Delivery PlanAppendix 3, item 35, Final Local Transport Delivery Plan
832 KB
Kept 30 Sep
for Final Local Transport Delivery PlanAppendix 3, item 35, Final Local Transport Delivery Plan
832 KB
Kept 30 Sep
for Final Local Transport Delivery PlanAppendix 4, item 35, Final Local Transport Delivery Plan
532 KB
Kept 30 Sep
for Final Local Transport Delivery PlanAppendix 4, item 35, Final Local Transport Delivery Plan
532 KB
Kept 30 Sep
Final Local Transport Delivery PlanItem 35, Final Local Transport Delivery Plan
162 KB
Kept 30 Sep
Final Local Transport Delivery PlanItem 35, Final Local Transport Delivery Plan
162 KB
Kept 30 Sep
Cheshire East Grants PolicyAppendix 1, item 36, Cheshire East Grants Policy and Enabling Communities Grants Programme
1.5 MB
Kept 30 Sep
Cheshire East Grants PolicyAppendix 1, item 36, Cheshire East Grants Policy and Enabling Communities Grants Programme
1.5 MB
Kept 30 Sep
Cheshire East Grants Policy SummaryAppendix 2, item 36, Cheshire East Grants Policy and Enabling Communities Grants Programme
333 KB
Kept 30 Sep
Cheshire East Grants Policy SummaryAppendix 2, item 36, Cheshire East Grants Policy and Enabling Communities Grants Programme
333 KB
Kept 30 Sep
Community Grants Impact Report 2526_V3Appendix 3, item 36, Cheshire East Grants Policy and Enabling Communities Grants Programme
4.6 MB
Kept 30 Sep
Community Grants Impact Report 2526_V3Appendix 3, item 36, Cheshire East Grants Policy and Enabling Communities Grants Programme
4.6 MB
Kept 30 Sep
Cheshire East Grants Policy and Enabling Communities Grants ProgrammeItem 36, Cheshire East Grants Policy and Enabling Communities Grants Programme
218 KB
Kept 30 Sep
Cheshire East Grants Policy and Enabling Communities Grants ProgrammeItem 36, Cheshire East Grants Policy and Enabling Communities Grants Programme
218 KB
Kept 30 Sep
Framework: Enabling Healthy NeighbourhoodsAppendix 1, item 37, Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030
1.8 MB
Kept 30 Sep
Framework: Enabling Healthy NeighbourhoodsAppendix 1, item 37, Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030
1.8 MB
Kept 30 Sep
Enabling Healthy Neighbourhoods Framework Consultation FeedbackAppendix 2, item 37, Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030
563 KB
Kept 30 Sep
Enabling Healthy Neighbourhoods Framework Consultation FeedbackAppendix 2, item 37, Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030
563 KB
Kept 30 Sep
Equality Impact Assessment, Enabling Healthy Neighbourhoods FrameworkAppendix 3, item 37, Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030
572 KB
Kept 30 Sep
Equality Impact Assessment, Enabling Healthy Neighbourhoods FrameworkAppendix 3, item 37, Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030
572 KB
Kept 30 Sep
Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030Item 37, Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030
211 KB
Kept 30 Sep
Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030Item 37, Connected Communities: building healthier neighbourhoods with the VCFSE sector / Enabling Healthy Neighbourhoods (EHN) Framework 2026-2030
211 KB
Kept 30 Sep
Commissioning Activity Forward Plan: Adults, Health and IntegrationItem 38, Commissioning Activity Forward Plan - Adults, Health and Integration
194 KB
Kept 30 Sep
Commissioning Activity Forward Plan: Adults, Health and IntegrationItem 38, Commissioning Activity Forward Plan - Adults, Health and Integration
194 KB
Kept 30 Sep
Better Care Fund Section 75 Agreement 2026-27 & 2027-28Item 39, Better Care Fund Section 75 Agreement 2026-27 & 2027-28
313 KB
Kept 30 Sep
Better Care Fund Section 75 Agreement 2026-27 & 2027-28Item 39, Better Care Fund Section 75 Agreement 2026-27 & 2027-28
313 KB
Kept 30 Sep
Local Service Delivery FrameworkAppendix 1, item 40, Enabling Local Service Delivery Framework
1.3 MB
Kept 30 Sep
Local Service Delivery FrameworkAppendix 1, item 40, Enabling Local Service Delivery Framework
1.3 MB
Kept 30 Sep
Part 1: Priority programme of asset ad local service delivery opportunities 26-27Appendix 2, item 40, Enabling Local Service Delivery Framework
143 KB
Kept 30 Sep
Part 1: Priority programme of asset ad local service delivery opportunities 26-27Appendix 2, item 40, Enabling Local Service Delivery Framework
143 KB
Kept 30 Sep
Enabling Local Service Delivery FrameworkItem 40, Enabling Local Service Delivery Framework
162 KB
Kept 30 Sep
Enabling Local Service Delivery FrameworkItem 40, Enabling Local Service Delivery Framework
162 KB
Kept 30 Sep
Unlocking Growth Opportunities for Cheshire East: Strategic Capacity and the Greater Crewe ProgrammeItem 41, Unlocking Growth Opportunities for Cheshire East: Strategic Capacity and the Greater Crewe Programme
141 KB
Kept 30 Sep
Unlocking Growth Opportunities for Cheshire East: Strategic Capacity and the Greater Crewe ProgrammeItem 41, Unlocking Growth Opportunities for Cheshire East: Strategic Capacity and the Greater Crewe Programme
141 KB
Kept 30 Sep
Capital Disposal Programme 2026-2029: Revised ApproachItem 42, Capital Disposal Programme 2026-2029 - Revised Approach
148 KB
Kept 30 Sep
Capital Disposal Programme 2026-2029: Revised ApproachItem 42, Capital Disposal Programme 2026-2029 - Revised Approach
148 KB
Kept 30 Sep

This committee over time

Every Cabinet meeting we have read, the dates it has set for the future, and each time those dates have changed.

38 meetings, 2012 to 2027Dot size shows the number of papers
20122014201620182020202220242026
HeldThis meeting
MeetingItemsPapers
7 Jan 2027Thursday
0items
0papers
UpcomingOpen
3 Dec 2026Thursday
0items
0papers
UpcomingOpen
5 Nov 2026Thursday
0items
0papers
HeldOpen
8 Oct 2026Thursday
0items
0papers
HeldOpen
1 Oct 2026Thursday
0items
0papers
HeldOpen
3 Sep 2026Thursday, this meeting
20items
43papers
6 Aug 2026Thursday
0items
0papers
HeldOpen
2 Jul 2026Thursday
11items
15papers
HeldOpen
4 Jun 2026Thursday
11items
17papers
HeldOpen
6 Oct 2020Tuesday
13items
28papers
HeldOpen
7 Jul 2020Tuesday
10items
18papers
HeldOpen
3 Dec 2019Tuesday
12items
20papers
HeldOpen
9 Jul 2019Tuesday
14items
21papers
HeldOpen
4 Dec 2018Tuesday
10items
15papers
HeldOpen
11 Sep 2018Tuesday
11items
18papers
HeldOpen
10 Jul 2018Tuesday
15items
36papers
HeldOpen
5 Dec 2017Tuesday
12items
16papers
HeldOpen
7 Nov 2017Tuesday
12items
23papers
HeldOpen
10 Oct 2017Tuesday
17items
28papers
HeldOpen
13 Jun 2017Tuesday
10items
17papers
HeldOpen
9 May 2017Tuesday
12items
27papers
HeldOpen
6 Dec 2016Tuesday
13items
21papers
HeldOpen
8 Nov 2016Tuesday
9items
17papers
HeldOpen
18 Oct 2016Tuesday
13items
24papers
HeldOpen
13 Sep 2016Tuesday
13items
14papers
HeldOpen
12 Jul 2016Tuesday
16items
35papers
HeldOpen
14 Jun 2016Tuesday
13items
21papers
HeldOpen
8 Dec 2015Tuesday
13items
23papers
HeldOpen
10 Nov 2015Tuesday
13items
21papers
HeldOpen
29 Sep 2015Tuesday
14items
20papers
HeldOpen
21 Jul 2015Tuesday
16items
26papers
HeldOpen
9 Dec 2014Tuesday
15items
25papers
HeldOpen
11 Nov 2014Tuesday
16items
24papers
HeldOpen
16 Sep 2014Tuesday
13items
16papers
HeldOpen
1 Jul 2014Tuesday
16items
23papers
HeldOpen
12 Nov 2013Tuesday
12items
20papers
HeldOpen
22 Jul 2013Monday
10items
19papers
HeldOpen
17 Sep 2012Monday
22items
29papers
HeldOpen

Follow the Cabinet

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Cheshire East, Cabinet

Cabinet: 3 kinds of updateCheshire East, sent the same day
PDF
86 papers published for 3 SeptemberProgress Update on the Corporate Improvement and Transformation Delivery Plan and 85 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 3 SeptemberThe committee's resolutions, the day they are recorded
ABC
"progress" found in 4 papers_ProgressTrackerImprovementandTransformationDeliveryPlanendJuneFINA and _ProgressTrackerImprovementandTransformationDeliveryPlanendJuneFINA
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Cabinet, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies