Resolved
That application 25/2071/FUL be APPROVED subject to the following conditions and S106 Agreement; Conditions 2-year time limit for implementation. Development in accordance with approved plans. Materials as application. Landscaping – submission of details. Landscaping – implementation of approved details. Archaeology – written scheme of investigation to be submitted and implementation. Updated conceptual site model to be submitted, and if required an updated Phase II ground investigation and remediation strategy to be submitted. Verification report to be submitted. Testing of imported soil to be carried out. Actions in event of any unidentified contamination being found. Implementation of noise mitigation. Pedestrian /cycle route to be provided. Prior to occupation of plots 143 – 171 the emergency access and cycle connection to be provided. Development to be carried out in accordance with Construction Management Plan. Foul and surface water drainage scheme to be submitted Details of means of protecting existing water main during construction to be submitted. No part of development (including cranes) to exceed 15m in height. All exterior lighting shall be capped at the horizontal with no upward light spill. Bird Hazard Management Plan to be submitted. No reflective materials (including solar PV) to be added to buildings. Dust and smoke management plan to be submitted. Glint and glare assessment to be submitted prior to installation of any solar PV panels. Solar PV panels to be bird proofed (no gap beneath the panels). Biodiversity Gain Plan to be submitted. Habitat creation method statement and a 30-year habitat management and monitoring plan to be submitted. A strategy for the incorporation features to enhance the biodiversity value of the proposed development to be submitted. Updated badger survey to be submitted. External lighting details to be submitted. Drainage details to be submitted to include measures to maintain the hydrology of the retained pond in accordance with the measures detailed in the submitted Pond Hydrology Review. Nesting birds survey to be submitted. Air source heat pumps to be provided. Cycle storage to be provided Travel plan to be implemented Accessible and adaptable dwellings to be provided Arboricultural Method Statement Full levels details to be submitted Specification of cellular confinement system to be submitted Details of site-specific engineer designed hard surfacing to be submitted Appointment of an arboricultural clerk of works S106 Agreement S106 Amount Trigger Education contribution £1,329,779.24 (new build) or £930,791.00 (expansion) Prior to commencement Outdoor sport contribution £1,500 per family home and £750 per bed space in apartments Prior to commencement Indoor sport contribution £30,028.69 Prior to commencement Allotment contribution £562.50 per family home and £281.25 per apartment Prior to commencement Open space management Details to be provided in open space scheme Prior to commencement Affordable housing 30% of total number of dwellings In accordance with ... view the full minutes text for item 28.