Item7
Resolved
RESOLVED that planning permission be granted, subject to the prior completion of a Section 106 Legal Agreement and to the following conditions: 1. That a scheme for the implementation of a surface water drainage of the site together with sustainable drainage techniques, and for the foul drainage of the site, shall be agreed with the Local Planning Authority and form part of the detailed reserved matters application; the scheme shall also incorporate a separate system for foul and surface water drainage, while the land drainage system or sub soil drainage water shall not be connected to the public sewer; subsequently the approved scheme shall be implemented as part of the overall site development. Reason: To ensure satisfactory site drainage for the avoidance of any flood risk, and to accord with Polity EP18 of the Chorley Borough Local Plan Review. 2. The application for the approval of Reserved Matters shall be accompanied by a detailed scheme shall be submitted to the Local Planning Authority for its approval in respect of any alteration to the existing site levels; the scheme shall include a topographic survey including tree canopies together with details of levels as existing and proposed as well as the details of any fill and the transportation methodology; the existing soil levels around the site perimeter trees shall be maintained as existing. Such details shall include existing and proposed cross sections and spot heights. Reason: In order to retain control over the topography of the site in the interests of safeguarding visual and residential amenity as well as ensuring the longevity of site perimeter trees that will be retained, and in accordance with Policy GN5 of the Local Plan Review. 3. Before the development hereby permitted is first commenced full details of the proposed building slab levels (all relative to ground levels adjoining the site) shall have been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail shown on previously submitted plan(s). The development shall only be carried out in conformity with the approved details. Reason: To protect the appearance of the locality, in the interests of the amenities of local ... view the full minutes text for item 7.
Word for word from the decision Chorley published for this meeting.
Source: democracy.chorley.gov.uk