Resolved
RESOLVED – That it is expedient to issue an Enforcement Notice under Section 172 of the Town and Country Planning Act 1990 in respect of the following breach of planning control – without planning permission the erection of a timber post and panel fence adjacent to a highway used by vehicular traffic that is over 1 metre in height. (a) Remedy for Breach Reduce the heights of the posts and fence panels between points A and B, as shown on the attached plan, to a height of 1 metre when measured from ground level, thereby benefiting as permitted development granted by virtue of, schedule 2, Part 2, Class A, The Town and Country Planning (General Permitted Development) Order 1995. 2. RESOLVED – That it is expedient to issue an Enforcement Notice under Section 172 of the Town and Country Planning Act 1990 in respect of the following breach of planning control – without planning permission the erection of a shed. (a) Remedy for Breach Remove the shed from the land. (b) Periods for Compliance The periods for compliance for recommendations 1 & 2 are three months. (c) Reason (i) The fence and shed are by virtue of their heights, design and position on a corner plot will be out of character with the surrounding area which is predominantly open in nature and will have a detrimental impact on the street scene, and is therefore contrary to policy GN5, which seeks to ensure that the design of the proposed development are well related to their surroundings. (ii) It is considered that the fence and shed by reason of their heights, siting and design would harm the visual amenity of the Green Belt and is therefore contrary to Policy DC1 of the adopted Chorley Borough Local Plan Review.