Resolved
Deferred, Application deferred.
Development Control Committee deferred this item on Tuesday 14 August 2007. Below is the council's own wording, with the papers it was decided on.
Resolved
Deferred, Application deferred.
Item A. 3 07/00568/FULMAJ
Case Officer Mark Moore
Ward Eccleston And Mawdesley
Proposal Erection of 3 No. wind turbines
Location Cliffs Farm Wood Lane Mawdesley OrmskirkL40 2RL
Applicant Damien Culshaw
Proposal: This application seeks permission for the erection of three wind turbines on land at Cliffs Farm, Mawdesley. The application is a re-submission following the withdrawal of a previous submission in 2006 due to an objection from Natural England which required monitoring in response to issues related to Whooper Swans to be undertaken over the winter period.
The proposed wind turbines would comprise a column 55m in height supporting a three bladed rotor with a radius of 24.1m. The overall height would measure 79.1m from the base to the tip of the rotors at the highest point in their arc with the hub of the rotors connected to a 6.2m wide casement. The columns would be 3.35m in diameter at the base receding to 2.54m at the top and would be constructed in steel finished a matt grey colour supported on a 15m square foundation buried 3.5m below the ground level. Each turbine would be located within a compound area, the largest being approximately 40m x 32m and would necessitate the construction of a hard core pad to allow for the servicing of the proposed turbines.
In addition it is proposed to erect rectangular, metal control sheds adjacent to the base of each turbine measuring 3m x 3m square and 2.5m in height. The control sheds would be of corrugated steel construction finished in matt grey. A further transformer shed is also proposed which would comprise a steel cabinet of the same dimensions as the control sheds finished in a matching colour.
Access to the site would be via an existing track from Cliffs Farm however two new lengths of 4.2m wide track totalling approximately 340m in length would need to be created to enable each of the turbines to be accessed. The existing tracks proposed for access to the site form part of the Mawdesley Jubilee Trail which is a 7 mile circular walk set within the Mawdesley boundaries.
The electrical connections for the turbines would be via 10- 20cm cable buried 1-2m underground.
The proposed turbines would be sited in an area of flat, open countryside located on Mawdesley Moss between the settlements of Mawdesley and Croston. Specifically, the site comprises a flat area of farmland with a field area of approximately 10ha and is situated within the Green Belt as defined by the Chorley Borough Local Plan Review. The site is accessed via a single width road from Wood Lane and via an unmade footpath from Cliffs Farm which is located approximately 520m to the west of the nearest proposed turbine and is owned by a relative of the applicant. To the north of Cliffs Farm there is an additional residential property, Boundary Farm, which is sited approximately 540m from the northernmost proposed turbine and would have an uninterrupted view of all three of the proposed turbines. Further properties at Back House Farm, Hall Lane and Moss House Farm, Gales Lane are located to the south-east and south-west of the application site at a similar distance to Boundary Farm.
Planning History: The site history of Cliffs Farm is as follows:
Ref: 01/00679/FUL Decision: PERFPP Decision Date: 19 December 2001 Description: Erection of boat and bicycle store and archery and air rifle sheds,
Ref: 97/00473/COU Decision: PERFPP Decision Date: 5 November 1997 Description: Conversion of redundant cattle building to agricultural and blacksmith's workshop,
Ref: 99/00584/COU Decision: PERFPP Decision Date: 22 December 1999 Description: Change of use of redundant agricultural building to bunk barn accommodation,
Ref: 99/00585/COU Decision: PERFPP Decision Date: 22 December 1999 Description: Change of use of 1.2ha of agricultural land to leisure and education, including 0.4ha lake,
Ref: 05/00007/INV Decision: WDN Decision Date: Description: Replacement workshop building for decorative ironwork and general steel fabrication
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
A3:07/00568/FULMAJ: Cliffs Farm, Wood Lane, MawdesleyReport | 182 KB | DownloadRead as text |
PDF |
PlanA30700568FULMAJ(1).pdfReport | 144 KB | Download |
Follow Development Control Committee at Chorley and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 16 Jul 2019 | Minutes of meeting Tuesday, 18 June 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 18 June 2019 be approved as a correct record... | Approved | Open |
| 16 Jul 2019 | 19/00417/FULMAJ - Land Adjoining Cuerden Residential Park, Nell Lane, CuerdenFull planning permission granted, subject to conditions and a Section 106 legal agreement. | Agreed | Open |
| 16 Jul 2019 | 19/00325/FUL - Playing Field, Kem Mill Lane, Whittle-le-WoodsFull planning permission granted, subject to conditions. | Decided | Open |
| 18 Jun 2019 | Minutes of meeting Tuesday, 21 May 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 21 May 2019 be approved as a correct record ... | Approved | Open |
| 18 Jun 2019 | 18/00108/FULMAJ - Chorley Rugby Union Club, Chancery Road, Astley Village, ChorleyFull planning permission granted, subject to conditions and a supplemental Section 106 Agreement. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.