REPORT OF DEVELOPMENT CONTROL COMMITTEE
GENERAL REPORT
1. Since the last Council the Development Control Committee met on 11 September 2007 and 9 October 2007. This report refers briefly to the more significant proposals that were considered at these meetings.
11 September 2007
Planning Application 07/00568/FULMAJ
2. We considered the above planning application that sought permission for the erection of three wind turbines on land at Cliff Farm, Mawdesley. The application had been a re-submission following the withdrawal of a previous submission in 2006 due to an objection from Natural England, which had required monitoring in response to issues related to Whooper Swans.
3. The proposed wind turbines would have each comprised a column 55m in height supporting a three-blade rotor with a radius of 24.1m. Each turbine would be supported on a 15m square foundation buried 3.5m below the ground level and would be located in a compound area.
4. In addition it was proposed to erect rectangular, metal control sheds adjacent to the base of each turbine and a further transformer shed. Access to the site would be via an existing track from Cliffs Farm with two new additional lengths added to be able to access each of the turbines.
5. The proposed turbines were to be located in an area of flat, open countryside located on Mawdesley Moss between the settlements of Mawdesley and Croston. The site comprised of a flat area of farmland situated within the Green Belt as defined by the Chorley Borough Local Plan Review.
6. Objections and comments had been received from a number of different organisations and residents that had been consulted on the proposed development that were contained within the body of the report.
7. The Committee received a comprehensive detailed report from the Planning Officers and representations from two objectors, a supporter, the applicant and the two ward representatives.
8. It was considered that the proposed turbines would harm the open character of the Green Belt by reason of their siting, height and overall scale and would constitute inappropriate development for which no very special circumstances had been adequately demonstrated and therefore conflicted with PPG2 ‘Green Belts’ and Policy DC1 ‘Development in the Green Belt’ of the Chorley Borough Local Plan and PPG24 ‘Planning and Noise’ 9. It was also considered that the applicant had failed to submit adequate information to enable the local planning authority to assess the potential impact of noise from the proposed wind turbines and the possible affect upon residential amenity and the surrounding environment contrary to Policy EP20 ‘Noise’ of the Chorley Borough Local Plan and PPG24 ‘Planning and Noise’
10. After considering all the information that had been provided and listening to the representations we refused planning permission of the development.
Planning Application 07/00685/FUL
11. We considered the above planning application for the demolition of existing dwelling and the erection of five detached house and two bungalows at 54, Lancaster Lane, Clayton-Le-Woods, Leyland
12. The detached bungalows would be located to the north of the site and one of the bungalows would front on to Lancaster Lane. The two storey dwelling houses would be set back further on the site.
13. The Committee received representations from the applicant’s agent, an objector and the ward representatives.
14. It was noted that a previous application for development of the site had been refused and although the applicant felt that they had addressed the issues raised, one of the reasons for refusal had been the potential to an influx of sporadic similar developments within the area that had the potential to impact on highway safety and the character of the area, and we felt that this was still a serious consideration to bear in mind.
15. After considering the information in the officer’s report and listening to the representations we decided to refuse planning permission.
9 October 2007
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Development Control CommitteeReport | 16 KB | DownloadRead as text |
Follow Council at Chorley and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 22 Sep 2026 | MinutesApproved, as amended. | Approved | Open |
| 22 Sep 2026 | Executive CabinetNoted. | Noted | Open |
| 22 Sep 2026 | Audit and Governance CommitteeNoted. | Noted | Open |
| 22 Sep 2026 | Audit and Governance Committee Annual ReportNoted. | Noted | Open |
| 22 Sep 2026 | Proposed updates and changes to the Council's constitutionTo approve the proposed changes in Appendix 1 that fall outside of that delegation, for consideration by Council at i... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.