Resolved
Conditional outline planning approved subject to an amended Section 106 Agreement and conditions. It was proposed by Councillor David Dickinson, seconded by Councillor Henry Caunce and subsequently unanimously RESOLVED – To grant conditional outline planning approval subject to an amended Section 106 Agreement and the following conditions: Highways 1. No part of the development hereby approved shall commence until a scheme for the construction of all site access by vehicles, pedestrians and cyclists and the off-site works of highway improvement has been submitted to, and approved in writing by, the Local Planning Authority in consultation with the Highway Authority. The scheme shall include the timing of the delivery of all such works, together with contingency arrangements. Reason: In the interests of highway safety and to ensure appropriate pedestrian connectivity between Chorley Town Centre and the public transport hubs before trading commences in accordance with PPS4, and in order to satisfy the Local Planning Authority and the Highway Authority that the final details of the highway scheme/works are acceptable before work commences on site 2. No part of the development hereby approved shall be occupied or opened for trading until the approved scheme referred to in condition 1 has been constructed and completed in accordance with the scheme details. Reason: In order that the traffic generated by the development does not exacerbate unsatisfactory highway conditions in advance of the completion of the highway scheme/works. 3. The development shall not be occupied or brought into use until details of a Travel Plan (Broadly in accordance with the draft Travel Plan submitted as part of this application) have been submitted to and approved in writing by the Local Planning Authority, such Travel Plan to include: a. the form and timing of travel surveys b. interim targets pending the results of travel surveys c. actual targets based on the results of travel surveys d. measures proposed to achieve the targets e. the means and funding for the monitoring of the travel plan f. enforcement and sanctions g. timing of submission of the final travel plan Together with a timetable for the implementation of each such element. None of the units within the development shall be occupied prior to implementation of those parts of the approved Travel Plan that are capable of being implemented prior to occupation. Those parts of the approved Travel Plan that are identified therein as only being capable of implementation after occupation shall be implemented in accordance with the timetable contained therein and shall continue to be implemented as long as the development is occupied. Reason: In order to ensure that the development is accessible by a choice of means of transport including public transport in accordance with PPS4, PPG13 and Policy TR1 of the Chorley Borough Local Plan 4. Within the reserved matters application(s) the provision of a ... view the full minutes text for item 13b