Resolved
Decision deferred to allow necessary ecological surveys to be carried out so the application can be returned to a future Committee.
Development Control Committee deferred this item on Tuesday 11 June 2013. Below is the council's own wording, with the papers it was decided on.
Resolved
Decision deferred to allow necessary ecological surveys to be carried out so the application can be returned to a future Committee.
The Contractor shall comply with the current Building Regulations whether or not specifically stated on these drawings. The Contractor shall check and verify all building and site dimensions, levels and sewer invert levels at connection points before work starts. Do not scale measurements. If in doubt - ask. This drawing is copyright and may not be copied or given to a third party without written authority from Cowan and Co. CDM Principles - Managing Hazards Designers do not need to mention every hazard or assumption, as this can obscure significant issues, but they do need to point out significant hazards. These are not necessarily those that result in the greatest risks but those that are: A) Not likely to be obvious to a competent contractor or other designer. B) Unusual, or C) Likely to be difficult to manage effectively.
Methodist Croston Church.
Existing access to be retained. 2.4x 1
60m 5
Visab ility S play. Chu rc h an d comm A lmsh unity us ou ses , M e Car P ark ethodist ing for 9
New orchard planting to compliment existing farmhouse orchard. Service Vehicles. Turning Area For 1
6 10 10
House Type A Community Trust for community
F.F.L. = 8.500 Land to be gifted to Croston
West House Type B British Legion Hall
F.F.L. = 8.500 use
Existing Stone Rum
Wall.
h as drawing No. House Type A
ble S 2882.08
ead Proposed hard standing to roadways / C Cast
15.04.12
trip pavements amended.
as drawing No. House Type B
Service Vehicles. Turning Area For 8
2882.09
Proposed Finished Floor Levels added, notes 08.10.12 B revised & layout amended to suit site survey.
R Pe ces le W
Ac de s
o House No. 1 Layout amended to suit client
House No. 2
str A
House No. 3
F.F.L. = 8.200 06.08.12
ian
a Barn Conversion requirements.
as drawing No.
d 2882.02 Date Revisions Rev alks
18 as drawing No. House Type C 2882.10
11 House Type C
Client F.F.L. = 8.500
House No. 1 Open Space
Existing Brick Wall Terminates at barn. Lean-to R.P.Tyson Construction Ltd, Garage & Car P ort
House No. 2 Open Space B rick W al
Open Space House No. 3 l 1 Mitcham Road,
Conversion as drawing No.
Farmhouse Blackpool, FY4 4QN.
2882.06
F.F.L. = As Existing
Farmhouse Existing Farmhouse Project
2 .4 x60 Orchard. RE-DEVELOPMENT OF LAND AT
m Vis RECTORY FARM, CROSTON.
ability spaces for the barn.
covered parking
6 No.
Splay.
HARD LANSCAPING TO ROADWAYS / PAVING AREAS Drawing Title oad PROPOSED SITE LAYOUT Town R d
Marshalls Priora Permeable Paving n Roa
TarmacDry Porous Asphalt Statio COWAN & CO CHARTERED ARCHITECTS CHARTERED BUILDING SURVEYORS agreed that the finished floor level (FFL) of the proposed houses will
Environment Agency, it has been Following consultations with the
18 Eaton Avenue, above ordinance datum (AOD) be no lower than 8.4 metres
Matrix Park. Euxton, Preston, PR7 7NA. Telephone 01772 425360 Fax 01772 425369 E-mail [email removed] Scale Drawn by 1:250 PP Date Checked APR 12 Drg. No. Rev. 2882.01 C
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
13-00218-FUL: Amended Site Layout April2013.pdfReport | 136 KB | DownloadRead as text |
PDF |
13-00218-FUL: Location Plan.pdfPlan | 109 KB | Download |
PDF |
13/00218/FUL: Rectory Farm, Town Road Croston Leyland PR26 9RAReport | 186 KB | Download |
Follow Development Control Committee at Chorley and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 16 Jul 2019 | Minutes of meeting Tuesday, 18 June 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 18 June 2019 be approved as a correct record... | Approved | Open |
| 16 Jul 2019 | 19/00417/FULMAJ - Land Adjoining Cuerden Residential Park, Nell Lane, CuerdenFull planning permission granted, subject to conditions and a Section 106 legal agreement. | Agreed | Open |
| 16 Jul 2019 | 19/00325/FUL - Playing Field, Kem Mill Lane, Whittle-le-WoodsFull planning permission granted, subject to conditions. | Decided | Open |
| 18 Jun 2019 | Minutes of meeting Tuesday, 21 May 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 21 May 2019 be approved as a correct record ... | Approved | Open |
| 18 Jun 2019 | 18/00108/FULMAJ - Chorley Rugby Union Club, Chancery Road, Astley Village, ChorleyFull planning permission granted, subject to conditions and a supplemental Section 106 Agreement. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.