Members were minded to grant outline planning permission, subject to conditions and a S106 Obligation and agreed that the application be referred to the National Planning Casework Unit to determine whether the Secretary of State wishes to call the application in for a decision in accordance with the provisions of Part 5 of the Town and Country Planning (Consultation) (England) Direction 2009.
Word for word from the decision Chorley published for this meeting.Source: democracy.chorley.gov.uk
1. It is recommended that Members be minded to approve the application subject to conditions and a S106 Obligation to secure the provision of public transport and that the application be referred to the National Planning Casework Unit to determine whether the Secretary of State wishes to call the application in for a decision in accordance with the provisions of Part 5 of the Town and Country Planning (Consultation) (England) Direction 2009.
SITE DESCRIPTION
2. The application site comprises 8.7ha of land which lies to the north east of J8 of the M61. It is bounded by the A674 Millennium Way to the north, by the M61 J8 southbound entry slip road to the west, and by the Leeds and Liverpool Canal to the east.
3. The application site comprises a single parcel of land bisected by public footpath 9-2-FP 26 which runs through the site in an east / west direction. To the southern part of the site lies a 5 storey former Victorian Mill building known as Canal Mill which hosts the ‘Botany Bay’ retail development and associated car parking. The balance of the site is comprised of rough, open grassland.
4. The site consists of a generally level plain to the central part which slopes up towards the M61 to the west, the A647 to the north and on the northern part of the site slopes up towards the access road to the east. The embankments rise by as much as 8m above the main, level, part of the site.
5. Access to the site would be provided via the existing access to the Botany Bay development via an existing roundabout on the A674 Millennium Way.
DESCRIPTION OF PROPOSED DEVELOPMENT
6. The application is submitted in outline for access only with all other matters reserved for future approval.
7. The application proposes a retail led mixed use development consisting of up 20,830sqm of new floorspace and 9,662 sqm in the existing building of the following uses;
A1 - Shops A3 - Food and Drink A4 - Drinking Establishments A5 - Hot Food Takeaways B1 - Business C1 - Hotel D1 - Non-Residential Institutions
8. The application is accompanied by a land use and building height parameter plan which indicates there would be a landscape buffer strip along the eastern boundary of the site varying between 3 and 12m in depth to provide a buffer to the Leeds and Liverpool Canal. The building heights parameters plan indicates the proposed buildings units would have a maximum height ranging between 10m and 14m above ground level compared with the 5 storey 19m height of Canal Mill.
9. An illustrative masterplan has been submitted alongside the application submission, which provides an example of how the site could be delivered. This identifies up to 70 individual units fronting one another along a single ‘street’ orientated along a north – south axis. The existing mill building is retained and parking is proposed to the western and southern sides of the site.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.