RESOLVED that Cabinet agreed that: a) Based on the high level option appraisal, the Council reduces its occupation of the Offices and actively markets the estimated 30 - 40% spare space generated for commercial tenants, providing both revenue savings and a revenue return for the Council. b) A further report setting out capital costs to make changes to building configuration, access, security etc. would be presented to the Cabinet once the final allocation of Council services to specific space within the building is agreed. c) Funding of up to £13,000 is allocated from the Council Priorities Fund earmarked reserve to fund a feasibility study to assess options for roof repairs or replacement, incorporating options for insulation and reduction in heat loss, and that a further report is brought back to the Cabinet. d) To support implementation of option 2a, £308,000 of capital funding is included as part of the forthcoming budget setting process to fund works to install solar PV, lighting and smaller measures in the Office buildings which should achieve a reduction in Carbon emissions of approximately 59CO2t per year (20%). e) A 20% contingency sum is allocated for recommendation (d) £62,000 to allow for equipment or installation costs above estimates or unforeseen works with authority delegated to the Deputy Chief Executive in consultation with the Deputy Leader and Cabinet Member for Finance to draw on that funding. Record of Voting – for: 7, against: 0, abstention: 0, absent: ... view the full minutes text for item 65.
Word for word from the decision Cotswold published for this meeting.Source: meetings.cotswold.gov.uk
Net Zero Carbon Feasibility Report Trinity Road Council Office Redevelopment Cotswold District Council
Issue Number 01 07/06/2021 Net Zero Carbon Feasibility Report JHE/TOR/210556/17-2/Net Zero Carbon Feasibility Report – Issue Number 01
Document History
Issue Date Comment Author Chk’d 01 07/06/2021 Issue of draft report for internal review TOR JHE Net Zero Carbon Feasibility Report JHE/TOR/210556/17-2/Net Zero Carbon Feasibility Report – Issue Number 01
2.0Introduction............................................................................................................................................................. 6 2.1 Site Context .................................................................................................................................................................................................... 7
3.0Current Building – Energy Performance ........................................................................................................... 8 4.0 Assessing Operational Energy Use and Embodied Carbon of the Proposed Options ........................ 11 4.1 Operational Energy – Methodology........................................................................................................................................................11 4.2 Embodied Carbon - Methodolgy .............................................................................................................................................................12 4.3 Option 1 – Partial Conversion .................................................................................................................................................................13 4.4 Option 2 – Full Conversion ......................................................................................................................................................................15 4.5 Option 3 – Full Site New Development ................................................................................................................................................17
5.0Route to achieving NZC in Operation and Offsetting Embodied Carbon ............................................ 19 Net Zero Carbon Feasibility Report JHE/TOR/210556/17-2/Net Zero Carbon Feasibility Report – Issue Number 01
1.0Executive Summary Pick Everard were appointed by Cotswold District Council to provide sustainability & energy consultancy services in relation to the council headquarters building, located at Trinity Road, Cirencester, GL7 1PX. This report provides an assessment of the operational energy consumption and embodied carbon of three potential options for the proposed scheme:
➢ Option 1 – Partial Conversion
➢ Option 2 – Full Conversion
➢ Option 3 – Full Site New Development
The following table provides a summary of the estimated carbon emission operational energy use and embodied carbon in construction for the three options:
Option 1 Option 2 Option 3 Operational Energy Use before PV Generation 470,268 385,272 106,149.71 (kWh/year) Net Operational Energy 351,844 266,848 -1669.30 Use (kWh/year) Net Energy Use Intensity 66.83 65.28 -3.29 (kWh/m2/year) Net Carbon Emissions from Operational Energy 47.851 36.290 -1.67 Use (tCO2/year) Total Embodied Carbon 1117.23 1067.9 1866.21 (tCO2) PV Generation 118,424 118,424 118,424 (kWh/year)
The above results show that, of the three options currently tabled, only Option 3 represents a scheme that has the potential to be NZC in operation, based on the offset of CO2 emissions provided by the PV array proposals outlined in the Energy Audit & Survey Report.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.