CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Coventry City Council
Cabinet, Tuesday 15 March 2022 at 2.00pm

Energy Supplementary Planning Document - Adoption

Approved Executive 5 papers

Cabinet approved this item on Tuesday 15 March 2022. Below is the council's own wording, with the papers it was decided on.

Item95

Resolved

RESOLVED that, the Cabinet: 1. Adopt the Energy Supplementary Planning Document (SPD). 2. Delegate authority to the Strategic Lead (Planning), following consultation with the Cabinet Member for Housing and Communities, any necessary further non-substantive (minor) changes to the document.
Word for word from the decision Coventry published for this meeting. Source: edemocracy.coventry.gov.uk

Follow this further

Built from Coventry's papers

What the report saysPro

Report to Cabinet

Coventry City Council Energy Supplementary Planning Document (SPD)

March 2022

1 Contents

1 Glossary ....................................................................................................................................... 3 2 Executive Summary................................................................................................................... 5 3 Introduction ................................................................................................................................. 6 4 Policy Context ............................................................................................................................. 8 5 Energy requirements in Coventry........................................................................................ 16 6 Non-major development requirements .............................................................................. 40 Appendix 1 – Climate Change and Energy Questionnaire .................................................... 44

2 1 Glossary Building Emission Rate - the CO2 emission rate of a non-residential building BER based on its design specification. The BER is a metric used to assess compliance with the Building Regulations.

The Building Research Establishment Environmental Assessment Method for assessing, rating and certifying the sustainability of buildings the highest BREEAM standards of which are ‘Outstanding’ (≥85% score) and ‘Excellent’ (≥70% score)

Combined Cooling Heating and Power: A power plant that generates electricity and useful heating and cooling simultaneously for distribution through a network providing power and heat to buildings. The lack of energy lost means the system is highly efficient. CCHP plants and distribution CCHP networks can work at a number of scales and can be powered by fossil fuels, like oil and gas, or renewable fuels, like wood pellets. CCHP is often referred to as trigeneration and CCHP networks that serve multiple buildings may be referred to as district heating and cooling networks.

Combined Heating and Power - A power plant that generates electricity and useful heat simultaneously for distribution through a network providing power and heat to buildings. The lack of energy lost as heat results in high efficiency. CHP plants and distribution networks can work at a number of CHP scales and can be powered by carbon-based fuels, like oil and gas, or renewable fuels, like wood pellets. CHP is often referred to as cogeneration and CHP networks that serve multiple buildings may be referred to as district heating networks.

Adaptations to buildings, places or environments that make them more Climate Change resilient to, and potentially benefit from, expected changes in climate and Adaptation weather patterns.

Climate Change Action to reduce the impact of human activity on the climate system, mainly Mitigation through reducing greenhouse gas emissions.

Dwelling Emission Rate - the CO2 emission rate of a dwelling based on its DER design specification. The DER is a metric used to assess compliance with the Building Regulations.

The direct or operational carbon emissions are emissions that result from Direct carbon the use of a building (e.g. space and water heating, lighting, mechanical emissions ventilation)

District heating See heat network.

The carbon footprint of a material or building that results from the embodied Embodied carbon energy used to create it.

The energy consumed by all of the processes associated with the Embodied energy production of a material or building including mining and processing of natural resources, manufacturing, transport and product delivery.

Energy Performance Certificate is a report that assesses the energy EPC efficiency of a property with recommendations of the requirements

EV Electric vehicle - a vehicle powered by electricity.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Energy Supplementary Planning Document: Adoption: Appendix 1: SPDSupplementary 3.3 MB DownloadRead as text
PDF
Energy Supplementary Planning Document: Adoption: Appendix 2: RepresentationsSupplementary 238 KB Withheld: personal details
PDF
Energy Supplementary Planning Document: Adoption: Appendix 3: SEASupplementary 79 KB Download
PDF
Energy Supplementary Planning Document: Adoption: Appendix 4: EIASupplementary 289 KB Download
PDF
Energy Supplementary Planning Document: AdoptionSupplementary 131 KB Download

At this meeting

Whole meeting

Who was there

10 of 21 attended
OA
Oluremi AremuOfficer, in attendance
PA
Councillor Pervez AkhtarDeputy Cabinet Member, present
KC
Councillor Kamran CaanCommittee Member, present
GA
Councillor George Arthur DugginsChair, present
AS
Councillor Abdul Salam KhanDeputy Chair, present
JO
Councillor Jim O'BoyleCommittee Member, apologies
DS
Councillor David Stuart WelshCommittee Member, present
GR
Councillor Gary RidleyNon Voting Opposition Member, present
PS
Councillor Patricia SeamanCommittee Member, present
PH
Councillor Patricia HethertonCommittee Member, present
BG
Councillor Becky GittinsDeputy Cabinet Member, apologies
GL
Councillor Gavin LloydDeputy Cabinet Member, apologies

All 21 on the meeting page

More from Coventry Cabinet

All decisions
MeetingDecisionOutcome
7 Jul 2026 Revenue and Capital Outturn 2025/26RESOLVED that Council be recommended to approve the contribution to reserves of £3.2m for the purposes described in S... Approved Open
7 Jul 2026 Acceptance of the Music Hub Revenue Grant for the Strategic Area of Coventry, Warwickshire and SolihullRESOLVED that, the Cabinet: 1. Approve acceptance of the revenue grant for the academic year 2026/27 from ACE of £1,7... Approved Open
17 Mar 2026 Private Sector Housing Enforcement Policy 2026-31RESOLVED that the Cabinet recommend that the policy be reviewed by full Council for approval. Approved Open
17 Mar 2026 Coventry: City of Movement Strategy 2026-2031RESOLVED that, the Cabinet: 1. Note and accept the additional recommendation from the Scrutiny Co-ordination Committe... Approved Open
17 Mar 2026 Transport Capital Programme 2026/27RESOLVED that, the Cabinet: 1. Approve delivery of the 2026/27 programmes of Local Network Improvement schemes and Hi... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies