RESOLVED that the Cabinet Member for City Services approves the removal of footways and construction of cycle tracks over which the public have a right of way on foot between London Road and Abbey Road under Sections 65 and 66 of the Highways Act 1980 on the lengths of road as shown edged red in Appendix 1 to the report.
Word for word from the decision Coventry published for this meeting.Source: edemocracy.coventry.gov.uk
As part of the proposals for the new residential development on London Road, currently going through planning under Whitley Pumping Station planning reference OUT/2020/2521, it is necessary to install a new junction to access the development in line with the planning approval. The new traffic signal-controlled junction between the new development access road, Abbey Road and London Road will include improved cycleway and footway facilities. This report seeks approval to create sections of off carriageway cycle route by designating sections of footway as cycle track, utilising Council’s powers under the Highways Act 1980.
Recommendations
The Cabinet Member is recommended to:
1) Approve the removal of footways and construction of cycle tracks over which the public have a right of way on foot between London Road and Abbey Road under Sections 65 and 66 of the Highways Act 1980 on the lengths of road as shown edged red in Appendix 1 to the report.
List of Appendices included:
Appendix 1 – Plan Showing the Extent of the Length of Road for Cycle Track Background papers:
None
Other useful documents:
None
Has it or will it be considered by Scrutiny?
No
Has it or will it be considered by any other Council Committee, Advisory Panel, or other body?
No
Will this report go to Council?
No Report title: Designating Cycle Routes – Abbey Road and London Road
1. Context (or background)
1.1Under the terms of planning application reference OUT/2020/2521 for Whitley Pumping Station there is a requirement for the City Council to install a traffic signal control at the junction of London Road and Abbey Road, including a new access arm into the proposed development. As part of this scheme, it is proposed to incorporate a short section of segregated cycle way which will create a link in anticipation for future proposals to provide a segregated cycleway and footway along London Road, between Tollbar End and Asda Roundabout. This cycleway is being funded through the Coventry South Sustainable Transport Package, which forms part of the Council’s CRTST (City Region Sustainable Transport Settlement) programme as approved by the Cabinet in August 2022.
2. Options considered and recommended proposal
2.1Options for the provision of a traffic signalled controlled junction between the new development access road, Abbey Road and London Road have been considered. An alternative option was for each arm on approach to have facilities with Toucan Crossings, where cyclists and pedestrian share the same space. Even though the vehicular movements were catered for in this layout, to achieve best practice (in accordance with national design standards) separate facilities for pedestrians and cyclists should be provided. The conversion of existing footways to shared use should only be considered when options that reuse carriageway or other (e.g., verge) space have been rejected. For these reasons, this option was discounted.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.