Resolved
It was agreed that these issues would worsen over the coming years and that change was necessary, however the Council’s position was that a road widening option was favoured over a fly-over above Duppas Hill Park and maintaining the Waddon Hotel. While improvement works to the area had been consulted on previously in 2015, the previous consultation had not proposed any improvements to the Fiveways junction. It was stated by the Deputy Cabinet Member that the current consultation proposal had taken into account the Council’s view and Transport for London (TfL) was thanked for conducting a thorough consultation process. The Deputy Cabinet Member highlighted to the Committee that the Council’s preferred option of building a new bridge next to the current bridge would minimise disruption, and the proposal to change the junction to four-ways would improve traffic flow and safety. While these were outlined to be improvements it was noted that scope remained for the scheme to be further improved, particular for cyclists. Thomas Holmes of TfL provided the Committee with a presentation which outlined the difficulties of the junction and recognised that the A23 was a strategic route which acted as a bypass to central Croydon. Furthermore, the importance of the link to the surrounding towns of Wallington and Carshalton was recognised. It was stated that TfL noted that Fiveways was a strategic junction in south London, but was a hostile environment in particular for pedestrians, cyclists and motorcyclists, and would only worsen with the anticipated growth that Croydon would experience in the coming years. In addition, TfL recognised that the bridge over the railway line needed to be replaced by 2023 as it was coming to the end of its useful life. The key project objectives were outlined to the Committee as increasing traffic capacity, reducing journey time, upgrading the pedestrian environment, improving cycle routes, and enhancing the ‘place’ function to develop Waddon as a local centre. In line with the draft Mayor’s Transport Strategy there had been a focus on the healthy streets approach, and the proposed scheme had been measured with the healthy streets factors and was considered to meet over half. The Committee were informed that replacing a bridge over a railway line was a difficult procedure so TfL were looking to make the process as simple as possible, and as such they were proposing a new bridge alongside the existing bridge which was anticipated to minimise disruption. However, it was noted that building the new bridge would require the acquisition of two commercial properties. The proposals further sought to realign the road layout which would require the acquisition of a residential ... view the full minutes text for item 34/17