Resolved
That planning permission be GRANTED. RECOMMENDATION That planning permission be GRANTED, subject to the below conditions. Condition(s) and Reason(s): 1. The development hereby permitted shall begin before the 2nd September 2027. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: Drawings: P1 Rev G Location Plan P30 Rev H Proposed Site Plan House (replacement) P31 Rev H Proposed Block Plan House (replacement) P27 Rev H Plans of replacement house P28 Rev H Elevations of replacement house P29 Rev I Elevations of replacement house (2) Documents: Preliminary Ecological Appraisal and Preliminary Roost Assessment Survey by Arbtech dated 8 July 2020. Bat Emergence and Re-entrance Surveys by Arbtech dated 10 September 2020. Reason: For the avoidance of doubt and in the interests of proper planning. 3. The development hereby approved shall be carried out in accordance with the Arboricultural Method Statement and Tree Protection Plan by Arbtech dated 30 September 2025. The works must be carried out according to the approved details and thereafter retained until competition of the development. Reason: In order to ensure that damage does not occur to trees and hedges during building operations in accordance with saved Policy 99 of the Dacorum Borough Local Plan (2004), Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 187 of the National Planning Policy Framework (2024). 4. The development hereby approved shall be carried out in accordance with the hard and soft landscape details shown on approved drawing no. P32 Rev. H. The planting must be carried out within one planting season of completing the development. The approved landscaping including the shrubs and hedge to the north of the dwelling shall thereafter be permanently retained. In the event that the approved hedge dies or becomes diseased it shall be replaced as necessary in accordance with the approved details in the next available planting season. Any other tree or shrub which forms part of the approved landscaping scheme which within a period of 5 years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be ... view the full minutes text for item 5b Media