Resolved
RESOLVED that permission be GRANTED in accordance with officer recommendation as detailed within the report.
Planning Committee decided this item on Wednesday 17 February 2016. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that permission be GRANTED in accordance with officer recommendation as detailed within the report.
20 m 100 ft
© Crown copyright and database rights 2016 Ordnance Survey 100023408. 46/2015/0984/PF Scale: 1:1250 Printed on: 3/2/2016 at 11:01 AM © Denbighshire County Council Emer O'Connor WARD : St Asaph West
WARD MEMBER(S): Cllr Bill Cowie (c)
APPLICATION NO: 46/2015/0984/PF
PROPOSAL: Construction of 16MW power generating plant building including ancillary equipment and new access
LOCATION: Land off Cwttir Lane St Asaph
APPLICANT: [name removed] Asaph Power Ltd
CONSTRAINTS: PUBLICITY Site Notice – Yes UNDERTAKEN: Press Notice – No Neighbour letters - Yes
REASON(S) APPLICATION REPORTED TO COMMITTEE: Scheme of Delegation Part 2
• Recommendation to grant / approve – Town / Community Council objection
CONSULTATION RESPONSES: ST ASAPH CITY COUNCIL: “A site visit had taken place in regard to Application Ref: 46/2015/0984. There were two points of concern; noise impact and the hydro carbon burning facility. Cllr Mitchell proposed that these two issues were the basis for a refusal of the application”
NATURAL RESOURCES WALES: • Protected Species/Biodiversity: No objection subject to conditions to consider and address the protected species issues. • Floodrisk: No objection • Surface Water: No objection • Air Quality: No objection
WALES AND WEST UTILITIES: No objection, draw applicant’s attention to utilities apparatus in the area.
DENBIGHSHIRE COUNTY COUNCIL CONSULTEES Highways Officer No objections subject to conditions relating to the detailing of the access.
POLLUTION CONTROL OFFICER No objection subject to conditions relating to noise management.
RESPONSE TO PUBLICITY: None.
EXPIRY DATE OF APPLICATION: 02/12/15
REASONS FOR DELAY IN DECISION:
• Additional information required.
PLANNING ASSESSMENT: 1. THE PROPOSAL: 1.1 Summary of proposals 1.1.1 Planning permission is sought for the construction of a 16MW power generating plant building, ancillary equipment and an access off Cwttir Lane on part of the former Pilkington’s Glass factory site off Glascoed Road in St Asaph. The site is partially located on the site of the former Pilkington’s gas compound.
1.1.2 The proposal would accommodate a STOR facility, also known as a ‘peaking plant’. The plant would provide short term reserve power fuelled by natural gas and is intended to support the National Grid during periods of high demand or when intermittent renewable energy generating plants fail to deliver as expected. It would therefore run on an intermittent basis, typically operating for 60-90 minutes every 2-3 days.
1.1.3 The development comprises of an industrial style steel framed portal building measuring 48.5m by 19.8m, it would have an overall height of 8.9m. The building would house the generators that will operate on natural gas. The combustion driven engines will be contained in a purpose built acoustic enclosure built on anti-vibration mounts. There would be 8 vertical flues on the building which would extend 7 metres above the building height. There would also be engine cooling radiators also attached to the external façade of the building via pipework. Externally there would be a gas kiosk, a transformer and the site would be surrounded by palisade fencing.
1.1.4 The proposed access would be off Cwttir Lane. It is partially splayed to an entrance with security gates. There would be four parking spaces on site. The plans show the established landscaping along the eastern boundary of the site to be retained.
1.1.5 The application submission includes a Design and Access Statement, Planning Statement, a Noise Assessment, Air Quality Assessment, Contamination Assessment, Flood Consequences Assessment and Ecological Assessment.
1.2Description of site and surroundings 1.2.1 The site is located off Cwttir Lane, which is an access road off the northern side of Glascoed Road on the eastern approach to the Business Park.
1.2.2 The site is currently vacant, having formally been occupied by the Pilkington’s Glass Factory and an ancillary gas valve compound.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
APPLICATION NO. 46/2015/0984: LAND OFF CWTTIR LANE, ST. ASAPHFrontsheet | 5 KB | Download |
PDF |
Final report 2015-0984Report | 525 KB | DownloadRead as text |
Follow Planning Committee at Denbighshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 Sep 2026 | MINUTESthat the minutes from the meeting held on the 15 July 2026 be received and approved as a true and correct record of t... | Approved | Open |
| 15 Jul 2026 | MINUTESthat the minutes from the meeting held on the 17 June 2026 be received and approved as a true and correct record of t... | Approved | Open |
| 17 Jun 2026 | MINUTESthat the minutes of the Planning Committee meeting held on the 13 May 2026 be received and approved as a true and cor... | Approved | Open |
| 13 May 2026 | Appointment of chairRESOLVED that Councillor Mark Young be appointed Chair of the Planning Committee for the 2026/27 municipal year. | Decided | Open |
| 13 May 2026 | Appointment of vice-chairRESOLVED that Councillor Alan James be appointed Vice-Chair of the Planning Committee for the 2026/27 municipal year. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.