Resolved
RESOLVED that the application be DEFERRED.
Planning Committee deferred this item on Wednesday 4 September 2019. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the application be DEFERRED.
50 m 100 ft
© Crown copyright and database rights 2019 Ordnance Survey 100023408. 02/2019/0095 Scale: 1:2500 Printed on: 13/8/2019 at 17:00 PM © Denbighshire County Council Denise Shaw WARD : Ruthin
WARD MEMBERS: Cllr Huw Hilditch-Roberts Cllr Emrys Wynne Cllr Bobby Feeley
APPLICATION NO: 02/2019/0159/ PF
PROPOSAL: Conversion of existing building to chalet, erection of 3 new chalets, with associated construction of roads, creation of pond, installation of drainage and landscape planting
LOCATION: Land at Fron Haul Llanfwrog Ruthin LL15 2DB
APPLICANT: Powerline Property Ltd.
CONSTRAINTS: C2 Flood Zone PROW
PUBLICITY Site Notice - Yes UNDERTAKEN: Press Notice - No Neighbour letters - Yes
REASON(S) APPLICATION REPORTED TO COMMITTEE: Scheme of Delegation Part 2
• Member request for referral to Committee
CONSULTATION RESPONSES: RUTHIN TOWN COUNCIL “No objections”.
NATURAL RESOURCES WALES No objection. Comments summarised below: Flood Risk NRW Flood Risk Map, which is updated on a quarterly basis confirms the application site lies partially within Zone C2 of the Development Advice Maps (DAM) as contained in TAN15 and within the 1% (1 in 100 year) / 0.5% (1 in 200 year) and 0.1% (1 in 1000 year) annual probability fluvial / tidal flood outlines. Given the scale and/or nature of the proposed development (and in the absence of a flood consequences assessment) we consider the proposals could be acceptable, subject to the developer being made aware of the potential flood risks and advised to install flood-proofing measures as part of the development. In areas at risk of flooding, we recommend that consideration be given to the incorporation of flood resistance/resilience measures into the design and construction of the development. These could include flood barriers on ground floor doors, windows and access points, implementation of suitable flood proofing measures to the internal fabric of the ground floor and locating electrical sockets/components at a higher level above possible flood levels.
Protected Species The ecological submission does not include an assessment of the existing outbuilding to be converted into a chalet. Consequently, no assessments are provided in respect of the demonstration of no likely detriment to the maintenance of the favourable conservation status of any local populations of bat. Based on the limited information provided to us, including photographs of the outbuilding, we consider the application site is more likely to be of limited value to bats and, on this basis, is not likely to be detrimental to the maintenance of the favourable conservation status of any local bat populations. However, NRW advise that you consult your County Ecologist in respect of the potential ecological interests of the site.
DENBIGHSHIRE COUNTY COUNCIL CONSULTEES – Highways Officer The scheme incorporates a substantial access improvement to an existing substandard access by widening the access and providing visibility splays. Considers this adequate to serve the development and therefore has no objection subject to conditions to ensure visibility splays are kept clear of any obstruction above 1/.05m in height and in relation to the surfacing of the access.
Footpaths Officer: Public Footpath 6 in the Community of Ruthin crosses the application area. Hence, this Public Right of Way must not be compromised, unofficially moved or excavated. The following conditions also need to be inserted into any planning permission granted: No building materials to be stored on the right of way, which may cause a nuisance, or obstruction to the user. No diminution in width of the Footpath as a result of the development No additional barriers (e.g. gates) are placed across the right of way, of either a temporary or permanent nature. No change to the surface of the Footpath, unless approved by the Public Rights of Way Unit via a licence. Please contact Paul Owen on 01824 706872 for further details
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
APPLICATION NO. 02/2019/0159: LAND AT FRON HAUL, LLANFWROGFrontsheet | 6 KB | Download |
PDF |
Final Report 02-2019-0159Report | 876 KB | DownloadRead as text |
Follow Planning Committee at Denbighshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 Sep 2026 | MINUTESthat the minutes from the meeting held on the 15 July 2026 be received and approved as a true and correct record of t... | Approved | Open |
| 15 Jul 2026 | MINUTESthat the minutes from the meeting held on the 17 June 2026 be received and approved as a true and correct record of t... | Approved | Open |
| 17 Jun 2026 | MINUTESthat the minutes of the Planning Committee meeting held on the 13 May 2026 be received and approved as a true and cor... | Approved | Open |
| 13 May 2026 | Appointment of chairRESOLVED that Councillor Mark Young be appointed Chair of the Planning Committee for the 2026/27 municipal year. | Decided | Open |
| 13 May 2026 | Appointment of vice-chairRESOLVED that Councillor Alan James be appointed Vice-Chair of the Planning Committee for the 2026/27 municipal year. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.