RESOLVED (unanimously) That authority be delegated to officers to issue a decision with the recommended conditions, and additional conditions relating to drainage (which will include the submission and approval of a final drainage scheme, that will follow the parameters of the drainage strategy designed for the site which considers an 1 in 100 rainfall event and 40% capacity for climate change and allow us to look at infiltration and outfall to a watercourse and independent verification of the system to ensure that it has been built and functions as designed), following consultation with the LLFA and confirmation that they do not object to the proposals or wish to comment in light of any recent flood events in the locality. The Chair declared the motion CARRIED. 7.55pm – The Chair adjourned the meeting. 8.08pm – The meeting reconvened.
Word for word from the decision Derbyshire Dales published for this meeting.Source: democracy.derbyshiredales.gov.uk
Approve subject to planning conditions set out in section 8.0 of the report. 1.0 THE SITE AND SURROUNDINGS
1.1The site is located in Darley Bridge, south of Darley Dale. The two storey building sits behind the large detached properties that front Eversleigh Rise with access along Lime Kiln Lane to the north. The building is modern with various additions over time and the main entrance is on the southern part of the building with the car park to the south west. The building is set within the bank and is two storey to the north and single storey to the south. A grassed area at a higher land level is to the south which is enclosed by fencing and there is tree screening and woodland to the south west. There is a paved external courtyard between the different wings of the building. The main car park is located to the west of the building and woodland slopes down to the west adjacent to this boundary.
2.0DETAILS OF THE APPLICATION
2.1Planning permission is sought for extension to the existing care home on the raised grassed area to the south of the main building. The proposed extension would provide a dementia unit linked to the care home with 16 additional en-suite bedrooms together with a dining / lounge, kitchen prep room, office, staff room, separate lounge, laundry room, medication room, lobby, equipment room and bathrooms. The proposed additional 16 bedrooms would increase the total bedrooms to 56. Currently 45 full time and 16 part time staff are employed. The increase of 16 bedrooms requires 4 additional staff.
2.2A previous application (22/00398/FUL) was refused at committee on the 16th August 2022 on the following grounds:- The siting, scale, and massing of the proposed building and location of the associated car parking area would result in unacceptable overbearing and overshadowing effects, a loss of privacy, light intrusion and noise nuisance to the detriment of the residential amenity of the occupants of nearby dwellings contrary to the requirements of Policies PD1 and PD9 of the Adopted Derbyshire Dales Local Plan (2017).
2.3This submission seeks to address the reason for refusal through amendments to position the building 2.4m further from the south eastern boundary with properties on Eversleigh Rise, internal changes to remove bedroom windows on this elevation and removal of the staff car parking adjacent to the boundary with 22 Eversleigh Rise. All car parking would be to the north west of the proposed extension and existing building by extension and improvement to the existing car park which would involve retaining part of the existing bank adjacent to the wooded area. This extended car park would accommodate 25 vehicles.
2.4The proposed building would be single storey and dug into the bank between 1- 2.4m to the south. Its ridge height would be 0.5m higher than the existing main nursing home building at 4.7m. A central enclosed courtyard is proposed adjacent to the southern boundary. External materials are stone faced walls, slate roof and zinc cladding on the link and boxed feature windows. An extension to the existing reception is also proposed.
3.0PLANNING POLICY AND LEGISLATIVE FRAMEWORK
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Approval of Minutes of Previous MeetingRESOLVED (unanimously) That the minutes of the meeting of the Planning Committee held on 11 August 2026 be approved a...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.