Item102
Resolved
DECISION That condition 41 in respect of application WD/D/17/0986 be amended to read 41 a) and 41 b) as follows, together with an additional condition: Surface water 41a) No development shall commence on each relevant phase (as referred to in Condition 2) until a detailed surface water management scheme for the development within that phase, based upon the hydrological and hydrogeological context of the development including details of a storm draining disposal scheme to serve the development within that phase has been submitted to and approved in writing by the Local Planning Authority. Such detail shall include measures to prevent the discharge of oil/petrol into any watercourse. The surface water management scheme shall be implemented in accordance with the submitted details before the development is completed. REASON: To ensure that the development is undertaken in an acceptable manner to prevent increased risk of flooding and protect water quality and avoid pollution of watercourses. 41b) No development, for any phase, shall take place until a strategic surface water management scheme for the whole site has been submitted to, and approved in writing by the local planning authority. This must include confirmation of the existing drainage, outline measures to manage surface water during the phased construction and specify how each phase will comply with this overall Drainage Strategy. REASON: To prevent the increased risk of flooding, and to protect water quality. New Condition and Informative: • Additional condition to read: • No development shall take place until details of maintenance and management of the surface water sustainable drainage scheme have been submitted to and approved in writing by the local planning authority. The scheme shall be implemented and thereafter managed and maintained in accordance with the approved details. These should include a plan for the lifetime of the development, the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the operation of the surface water drainage scheme throughout its lifetime. • REASON: To ensure future maintenance of the surface water drainage system, and to prevent the increased risk of flooding. • INFORMATIVE • All works that offer an obstruct to flow within a channel / system with the status of Ordinary Watercourse, are likely to require prior Land Drainage Consent (LDC) from DCC, as LLFA, in accordance with s23 of the Land drainage Act 1991. The requirement for prior LDC is independent of planning permission. • Notes to ... view the full minutes text for item 102.
Word for word from the decision Dorset published for this meeting.
Source: moderngov.dorsetcouncil.gov.uk