Item9
Resolved
(a) That, subject to a Section 106 legal agreement (the full details of which shall be delegated to Officers, including a review of open space and the Clinical Commissioning Group contribution request), Application No DOV/17/01523 be APPROVED subject to the following conditions: ( i ) Drawings; (ii) Reserved matters – layout, scale, appearance, landscaping, access; (iii) Reserved matters time period for application; (iv) Reserved matters time period to commence; (v) Accessible green space and equipped play space; (vi) Public realm management strategy; (vii) Highways – travel plan including exploration of Stagecoach smart card; (viii) Highways – visibility splays; (ix) Highways – parking and turning facilities, including provision for electric vehicle charging; (x) Highways – cycle parking; (xi) Highways – completion of access prior to use of site commencing (xii) Highways – completion of uncontrolled pedestrian crossing and associated highways alterations prior to use of site commencing; (xiii) Highways – provision of measures to prevent discharge of surface water onto highway; (xiv) Highways – bound surface first 5 metres from edge of highway; (xv) Highways – completion of alterations to traffic signals at Cherry Tree Avenue/Buckland Avenue and Bridge Street/High Street junctions prior to use of site commencing; (xvi) Sewerage – occupation of site phased in line with sewerage network reinforcement; (xvii) Sewerage – foul drainage strategy; (xviii) SUDS – detailed surface water drainage scheme; (xix) SUDS – operation and maintenance manual for proposed drainage scheme; (xx) SUDS – verification report for provision of scheme; (xxi) SUDS – infiltration drainage only where agreed with LPA with reference to risk to controlled waters and ground stability; (xxii) EH – land contamination and risk assessment; (xxiii) EH – remediation scheme, if necessary; (xxiv) EH – verification of remediation scheme, if necessary; (xxv) EH – unidentified contamination; (xxvi) Foundation design – no piling unless consented by Local Planning Authority; (xxvii) Trees – arboricultural method statement, including tree protection measures; (xxviii) Archaeology – cease works if remains found; (xxix) Provision of recommended ecological enhancements; (xxx) External lighting strategy, with regard to impact on ecology (bat-friendly); (xxxi) Topographical details; (xxxii) Utility strategy; (xxxiii) Marketing areas; (xxxiv) Refuse bins; (xxxv) Construction management plan, noise remediation, vibration remediation, dust suppression, hours of working. (b) That powers be delegated to the Head of Planning, Regeneration and Development to settle any necessary planning conditions in line with the issues set out in the recommendation and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk