Item64
Resolved
(a) That Application No DOV/19/0083 be APPROVED subject to the following conditions: (i) 3-year time limit; (ii) Approved plans; (iii) Samples of materials; (iv) Provision of parking facilities; (v) Measures to prevent the discharge of surface water onto the highway; (vi) Use of bound surface for the first 5 metres of the access from the edge of the highways; (vii) Cycle parking retention; (viii) Bin storage details; (ix) Completion of access prior to first use; (x) Gradient of the accesses to be no steeper than 1 in 10 for the first 1.5 metres from the highway boundary and no steeper than 1 in 8 thereafter; (xi) Provision and maintenance visibility strip measuring 2.4 metres in width from the edge of carriageway along the Eythorne Road frontage with no obstructions over 1 metre above carriageway level within the strip, prior to use of the site commencing; (xii) Provision and maintenance of 2 metre x 2 metre pedestrian visibility splays behind the footway on both sides of the Eythorne Road access with no obstructions over 0.6 metres above footway level, prior to the use of the site commencing; (xiii) Removal of permitted development rights (classes A, B and E); (xiv) Hand dug condition and tree protection measures including protective fencing; (xv) Contamination land condition; (xvi) Construction management plan; (xvii) Ecology – plantation of native species and biodiversity enhancements as detailed within the report; (xviii) Sensitive lighting scheme (bats); (xix) Surface water disposal; (xx) Foul water drainage; (xxi) Windows conditions permitted development removal and 1.7/obscure glazing; (xxii) Existing and proposed site levels; (xxiii) Landscaping scheme; (xxiv) Boundary treatments and hard surfacing materials; (xxv) Front boundary constructed prior to first occupation. (xxvi) Details of sustainable means of construction; (xxvii) Electric vehicle charging points; (xxviii) Details of overall lighting scheme; (xxix) Details of retaining wall. (b) That powers be delegated to the Head of Planning, Regeneration and Development to settle any necessary planning conditions in line with the issues set out in the recommendation and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk