Item123
Resolved
(a) That, subject to a Section 106 legal agreement to secure the necessary planning contributions, provision of affordable housing, the contribution to the Thanet Coast and Sandwich Bay SPA and Ramsar Mitigation Strategy and the provision, retention and maintenance of the pitch (including the 4G surface, pitch, markings, fencing and lighting), clubhouse and car park, which shall secure public access, including a timetable for construction and a management plan to demonstrate the hours of operation, how and when the facilities will be used and pricing policies, and the amenity open space (including an equipped children’s play area), Application No DOV/19/00895 be APPROVED subject to the following conditions: (i) Time limit; (ii) Approved plans; (iii) Details of the acoustic fencing; (iv) Construction management plan; (v) Measures to prevent the discharge of water onto the highway; (vi) Details of electric vehicle charging points, including a timetable for their provision; (vii) Use of bound surface treatment for first 5 metres of the carriageway; (viii) Provision and retention of car parking for residences, visitors, users of the pitch and clubhouse, and the public; (ix) Cycle parking; (x) Completion of access; (xi) Completion of internal access roads and footways; (xii) Provision and retention of visibility splays; (xiii) Details of surface water drainage infrastructure with no infiltration other than that which is approved; (xiv) Details of foul water drainage infrastructure to be provided in accordance with a timetable to be agreed; (xv) Full details of all lighting, including the lighting for the pitch, car parking and residential areas; (xvi) Provision of refuse and recycling areas for residential areas and for the pitch and clubhouse; (xvii) Previously unidentified contamination; (xviii) No foundations which require penetrative construction methods; (xix) Identification of any public sewers which cross the site and details of the measures to protect or realign them; (xx) Programme of archaeological evaluation followed by safeguarding and/or further archaeological investigation; (xxi) Samples of materials, to include bricks, roof tiles, parapet coping, window surrounds, windows, doors, door canopies and dormer cheeks; (xxii) Details of hard and soft landscaping which shall include details of planting, samples of the materials to be used for hardstandings and details of fences, railings and walls, and details of any minor artefacts; (xxiii) Windows to be set in reveals; (xxiv) Removal of permitted development rights for porches and roof extensions; (xxv) First-floor window to side elevation of plot 11 (serving a bathroom) to be obscure-glazed and non-opening; (xxvi) Details of any air-conditioning units, flues, ventilation or other plant to be installed; (xxvii) Ecological mitigation and enhancements. (b) That p owers be delegated to the Head of Planning, Regeneration and Development to settle any necessary planning conditions and to resolve a S106 agreement in line with the issues set out in the recommendation and as resolved by Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk